Product: | HXC - Time and Labor Engine |
---|---|
Meaning: | Limit for future time periods generated |
Description: |
Code | Meaning | Description |
---|---|---|
ACT_ASSGN | Active Assignment | Limit future time periods generated to Actual Termination Date |
FIN_ASSGN | Assignment up to Final Termination | Allows future time periods till Final Termination Date |
|
|
|