FND Design Data [Home] [Help]

Lookup Type: MRP_EXCEPTION_CODE_TYPE

Product: MRP - Master Scheduling/MRP
Meaning: MRP EXCEPTION CODE TYPE
Description:
Quick Codes
Code Meaning Description
1 Items that are over-committed
10 Past due orders
100 Trips
101 Purchase Requisitions
102 Work orders
103 Flow Schedules
104 Repetitive Schedules
105 Insufficient Remaining Shelf Life
11 Items with negative starting on hand
111 Forecast Expiration
112 Repair Supplier Capacity Overloaded
113 Past Due Returns Forecast
114 Demand satisfied using Supercession Items
115 Inventory exists for Superceded Items
116 Early Replenishment for Purchase Orders
117 Late Replenishment for Purchase Orders
118 Order will be delivered earlier than scheduled
119 Order will be delivered later than scheduled
12 Items with expired lot
13 Past due sales orders
14 Past due forecast
15 Late supply pegged to sales order
150 Demand-Short
151 Demand-Over
152 Damand-Backorder
16 Late supply pegged to forecast
160 Minimum Inventory Violation
161 Maximum Inventory Violation
162 Safety Level Violation
17 Items with a shortage in a project/task
170 Minimum Labour Usage Violation
171 Maximum Labour Usage Violation
172 Minimum Machine Usage Violation
173 Maximum Machine Usage Violation
18 Items with excess inventory in a project/task
180 Minimum Transportation Level Violation
181 Maximum Transportation Level Violation
19 Items allocated across projects/tasks
190 Minimum Supplier Capacity Violation
191 Maximum Supplier Capacity Violation
2 Items with a shortage
20 Items below safety stock
200 Minimum Violation
201 Maximum Violation
21 Resource overloaded
22 Resource underloaded
23 Sales Order/Forecast at risk due to resource shortage
24 Late replenishment for sales order
25 Early replenishment for sales order
26 Late replenishment for forecast
27 Early replenishment for forecast
28 Supplier capacity overloaded
29 Replenishment before need date
3 Items with excess inventory
30 Replenishment after need date
31 Planned order uses alternate BOM/Routing
32 Planned order uses alternate routing
33 Planned order uses substitute components
34 Planned order uses alternate resources
35 Demand affected by resource constraint
36 Resource constraint
37 Material constraint
38 Transportation resource's weight overloaded
39 Transportation resource's volume overloaded
4 Items with repetitive variance
40 Transportation resource weight constraint
41 Demand affected by material constraint
42 Sales Order/Forecast at risk due to material shortage
43 Order sourced from alternate facility
44 Order sourced from alternate supplier
45 Batch was started with less than minimum capacity
46 Batch was started with more than maximum capacity
47 Orders scheduled to next inventory point
48 Sourcing split percentage violated
49 Demand satisfied using end item substitution
5 Items with no activity
50 Transportation resource's weight underloaded
51 Transportation resource's volume underloaded
52 Sales Order/Forecast at Risk
53 Requirement causes resource overload
54 Order causes Supplier Capacity overload
55 Order causes Transportation Weight Capacity overload
56 Order causes Transportation Volume Capacity overload
57 Order with insufficient lead time
58 Requirement with insufficient lead time
59 Order lead time constraint
6 Orders to be rescheduled in
60 Requirement lead time constraint
61 Transportation resource volume constraint
62 Order is firmed late
63 Requirement is firmed late
64 Order is firmed early
65 Requirement is firmed early
66 Shared supply scheduled late Shared supply scheduled late
67 Demand quantity is not satisfied
68 Over commitment for sales order
69 Late Replenishment for MPP/MPS Demands
7 Orders to be rescheduled out
70 Changes recommended for sales orders
71 Alternate Ship method used/ Ship method changed
72 Order Violates Business Calendar
73 Items below Target
74 Items above Target
75 Items above Maximum
76 Order Quantity Change
77 Planned Order uses Inventory Rebalance Source
78 Organization Capacity Exceeded
79 Trip Over Utilized
8 Orders to be cancelled
80 Trip Under Utilized
81 Item Shipment Consolidated to a Later Date
82 Allocation Constraint
83 Internal Transfer Alternate / Changed Ship Method
84 Items with Overconsumption
85 Service level violation
86 Budget Violated
87 Late Supply
88 Early Supply
89 Operation Hard Link Violation
9 Orders with compression days
90 Resource Performing Excessive Setups
91 Resource utilization Change Exceeds Threshold
92 Late Maintenance Work Orders
93 Early Maintenance Work Orders
94 Manual Allocation causes Projected Stockout
95 Sales Order Line Allocation Split
96 Sales Order Cancellations
97 End Item Supply Shelf Life Voilation
98 Resource charge was started with less than minimum capacity
99 Resource charge was started with more than maximum capacity