Object Name: | PA_TASK_ASSIGNMENTS_AMG_V |
---|---|
Object Type: | VIEW |
Owner: | APPS |
FND Design Data: | ![]() |
Subobject Name: | |
Status: | VALID |
A public view which may be useful for custom reporting or other data
requirements.
This view provides progress data for task assignments.
Name | Datatype | Length | Mandatory | Comments |
---|---|---|---|---|
ACT_SCH_FINISH_VAR | NUMBER | The variance between actual and scheduled finish. | ||
ACT_SCH_START_VAR | NUMBER | The variance between actual and scheduled start. | ||
ACTUAL_COST | NUMBER | The actual cost incurred. | ||
ACTUAL_EFFORT | NUMBER | The actual effort incurred. | ||
ACTUAL_FINISH_DATE | DATE | The actual date work finished. | ||
ACTUAL_START_DATE | DATE | The actual date work started. | ||
ACTUAL_WORK_QUANTITY | NUMBER | (17) | The actual work achieved to date, as measured by work quantity. | |
AS_OF_DATE | DATE | The progress As of Date. | ||
BASELINE_COST | NUMBER | The baseline cost for the task or assignment. | ||
BASELINE_FINISH_DATE | DATE | The baseline finish date. | ||
BASELINE_START_DATE | DATE | The baseline start date. | ||
BASELINED_EFFORT | NUMBER | The baseline effort for the task or assignment. | ||
DAYS_UNTIL_PROGRESS_DUE | NUMBER | The number of days until the next progress as of date for the task or assignment. | ||
DAYS_UNTIL_SCHEDULED_FINISH | NUMBER | The number of days until the assignment is scheduled to finish. | ||
DAYS_UNTIL_START | NUMBER | The number of days until the assignment is scheduled to start. | ||
EARNED_VALUE | NUMBER | The earned value for the task. | ||
ETC_COST | NUMBER | The estimated total cost for the assignment upon completion. | ||
EST_AT_COMPLETION_EFFORT | NUMBER | The estimated total effort for the assignment upon completion. | ||
EST_BAS_FINISH_VAR | NUMBER | The variance between estimated and baseline finish. | ||
EST_BAS_START_VAR | NUMBER | The variance between estimated and baseline start. | ||
EST_REMAINING_EFFORT | NUMBER | Estimated remaining effort. | ||
EST_SCH_FINISH_VAR | NUMBER | The variance between estimated and baseline finish. | ||
ESTIMATED_FINISH_DATE | DATE | The estimated finish date of the task or assignment. | ||
ESTIMATED_START_DATE | DATE | The estimated start date of the task or assignment. | ||
ETC_COST_TC | NUMBER | The cost in transaction currency estimated to be necessary to complete the assignment. | ||
ETC_EFFORT | NUMBER | The effort estimated to be necessary to complete the assignment. | ||
ETC_WORK_QUANTITY | NUMBER | The quantity of work required to finish the task as measured by work quantity. | ||
NEXT_PROGRESS_DUE_DATE | DATE | The date of the next As of Date for the task or assignment. | ||
DEFAULT_AS_OF_DATE | DATE | The progress As of Date. | ||
PERCENT_COMPLETE_COST | NUMBER | The percentage of work completed based on cost. | ||
PERCENT_COMPLETE_EFFORT | NUMBER | The percentage of work completed based on effort. | ||
PERCENT_COMPLETE_ID | NUMBER | (15) | Percent_complete_id generated in sequence from pa_percent_completes_s. | |
PERCENT_SPENT_COST | NUMBER | The percentage of planned cost that has been spent. | ||
PERCENT_SPENT_EFFORT | NUMBER | The percentage of planned effort that has been spent. | ||
PLANNED_COST | NUMBER | The planned cost of the task. | ||
PLANNED_COST_PER_UNIT | NUMBER | The planned cost per work quantity unit of the task. | ||
PLANNED_EFFORT | NUMBER | The planned effort of the task. | ||
PLANNED_WORK_QUANTITY | NUMBER | (17) | The planned work quantity of the task. | |
PREDECESSORS | VARCHAR2 | (4000) | Predecessors for the task version | |
PRIORITY_CODE | VARCHAR2 | (30) | The task priority. | |
SCH_BASE_FINISH_VAR | NUMBER | The variance between scheduled and baseline finish. | ||
SCH_BASE_START_VAR | NUMBER | The variance between scheduled and baseline start. | ||
SCH_PERFORMANCE_INDEX | NUMBER | The schedule performance index of the task. | ||
ASSIGNMENT_END_DATE | DATE | The scheduled finish of the assignment. | ||
ASSIGNMENT_START_DATE | DATE | The scheduled start of the assignment. | ||
TASK_ID | NUMBER | (15) | Yes | Task Id. |
TASK_MANAGER_NAME | VARCHAR2 | (0) | The task manager of the task. | |
TASK_MANAGER_PERSON_ID | NUMBER | (15) | The task manager id of the task. | |
TASK_NAME | VARCHAR2 | (240) | Yes | The task name. |
TASK_NUMBER | VARCHAR2 | (100) | The task number. | |
TASK_TYPE | VARCHAR2 | (150) | The type that the user specifies for the task. This is a task-specific attribute. | |
TO_COMPLETE_PERFORMANCE_INDEX | NUMBER | The to complete performance index of the task. | ||
UNIT_OF_MEASURE | VARCHAR2 | (0) | The unit of measure for work quantity for the task. | |
VAR_AT_COMPLETION_COST | NUMBER | The variance at completion between planned and actual cost. | ||
VAR_AT_COMPLETION_EFFORT | NUMBER | The variance at completion between planned and actual effort. | ||
WBS_NUMBER | VARCHAR2 | (240) | System-generated formatted number for the task version, indicating the exact position of the task version in the structure version. | |
WORK_ITEM_CODE | VARCHAR2 | (30) | The default Work Item for Work Quantity. | |
WORK_TYPE | NUMBER | The work type of the task. | ||
RESOURCE_ASSIGNMENT_ID | NUMBER | (15) | Yes | The system-generated number that uniquely identifies the resource assignment. |
CURRENT_FLAG | VARCHAR2 | (1) | The flag indicating whether the row is current or not. | |
DISPLAY_SEQUENCE | NUMBER | (15) | Display Sequence of the task. | |
ELEMENT_VERSION_ID | NUMBER | (15) | Yes | The unique identifier for the element version. |
LONG_NAME | VARCHAR2 | (240) | Project Long Name. | |
OBJECT_TYPE | VARCHAR2 | (30) | Yes | The type of the object for the element. The value can be TASK or STRUCTURE. |
PROJ_ELEMENT_ID | NUMBER | (15) | Yes | The unique identifier for the project element (uses the same sequence as PA_TASKS_S). |
PROJECT_ID | NUMBER | (15) | Yes | The identifier of the project to which the element belongs. |
PROJECT_NAME | VARCHAR2 | (30) | Yes | Name of the project. |
PROJECT_NUMBER | VARCHAR2 | (25) | Yes | Number of the project. |
PUBLISHED_BY_NAME | VARCHAR2 | (0) | Name of the person who published the progress record. | |
PUBLISHED_BY_PARTY_ID | NUMBER | (15) | Identifier of the person who published the progress record. | |
PUBLISHED_FLAG | VARCHAR2 | (1) | Flag indicating whether the progress record is published. | |
RECORD_VERSION_NUMBER | NUMBER | Record version number. | ||
UOM_CODE | VARCHAR2 | (30) | The default Unit of Measure for Work Quantity. | |
UOM_DESCRIPTION | VARCHAR2 | (80) | Yes | The default Unit of Measure name for Work Quantity. |
WBS_LEVEL | NUMBER | (3) | Identifies the hierarchical level of the task version within a structure version. | |
WORK_ITEM_DESCRIPTION | VARCHAR2 | (80) | The default work item for work quantity | |
TXN_CURRENCY_CODE | VARCHAR2 | (4000) | The transaction currency code of the amount. | |
EFFORT_ENABLED_FLAG | VARCHAR2 | (1) | Flag to indicate effort enabled. | |
PROG_ENTRY_ENABLE_FLAG | VARCHAR2 | (1) | Flag to indicate whether progress entry is enabled for tasks of this task type. | |
RESOURCE_ALIAS | VARCHAR2 | (80) | User-defined short name of the the resource list member. | |
RESOURCE_LIST_MEMBER_ID | NUMBER | (15) | Yes | The identifier of the resource list member within the resource list that is assigned to the Workplan. |
RESOURCE_CLASS_CODE | VARCHAR2 | (30) | Indicates the code of the resource class. | |
RESOURCE_CLASS | VARCHAR2 | (240) | Yes | Indicates the resource class. |
RBS_ELEMENT_ID | NUMBER | (15) | Yes | Indicates the resource breakdown structure element id. |
PERSON_ID | NUMBER | (15) | Indicates the person. | |
PROGRESS_COMMENT | VARCHAR2 | (4000) | Progress Comments. | |
PROGRESS_OVERVIEW | VARCHAR2 | (250) | The progress overview of the task. | |
PRIORITY_DESCRIPTION | VARCHAR2 | (0) | The priority of the task. | |
SUMMARY_ELEMENT_FLAG | VARCHAR2 | (4000) | Flag to indicate lowest ot summary level task. | |
RESOURCES | VARCHAR2 | (0) | Link to navigate to planning resource details page. | |
RATE_BASED_FLAG | VARCHAR2 | (1) | Indicates whether transactional is rate based. | |
ACTUAL_QUANTITY | NUMBER | Actual effort incurred to date. | ||
ACTUAL_COST_THIS_PERIOD | NUMBER | Actual effort incurred during the progress cycle. | ||
LATEST_PROGRESS_DATE | DATE | Last published progress date. | ||
STRUCTURE_VERSION_ID | NUMBER | (15) | Structure version Id. | |
SPREAD_CURVE_ID | NUMBER | (15) | Indicates the spread curve id. | |
SPREAD_CURVE_NAME | VARCHAR2 | (4000) | Indicates the spread curve used to spread the periodic amounts. | |
ASSIGNMENT_DESCRIPTION | VARCHAR2 | (240) | It stores the description of the assignment. | |
PLANNED_BUR_COST_PROJFUNC | NUMBER | Indicates the planned burdened cost in project functional currency | ||
PLANNED_QUANTITY | NUMBER | Total quantity for the relevant task assignment. | ||
ROLE_NAME | VARCHAR2 | (4000) | Indicates the project role name. | |
PM_RES_ASSIGNMENT_REFERENCE | VARCHAR2 | (25) | The identifier of the resource assignment in the external project management system from which the resource assignment was imported. | |
PM_PROJECT_REFERENCE | VARCHAR2 | (25) | The identifier of the project in the external project management system from which the project was imported. | |
PM_PRODUCT_CODE | VARCHAR2 | (30) | The identifier of the external project management system from which the project was imported. | |
PM_TASK_REFERENCE | VARCHAR2 | (25) | The identifier of the task in the source system from which the task was imported. | |
RESOURCE_CLASS_FLAG | VARCHAR2 | (1) | Indicates whether the resource is a resource class | |
UNPLANNED_FLAG | VARCHAR2 | (1) | Indicates that the planning transaction was created by the system as a result of actual costs being incurred | |
RESOURCE_NAME | VARCHAR2 | (4000) | The resource name of the assignment | |
RES_TYPE_CODE | VARCHAR2 | (30) | The resource type code of the assignment | |
BOM_RESOURCE_ID | NUMBER | (15) | The identifier of the BOM resource of the assignment | |
JOB_ID | NUMBER | (15) | The identifier of the job of the assignment | |
PERSON_TYPE_CODE | VARCHAR2 | (30) | The person type code of the assignment | |
NON_LABOR_RESOURCE | VARCHAR2 | (20) | The non-labor resource of the assignment | |
INVENTORY_ITEM_ID | NUMBER | (15) | The identifier of the inventory item of the assignment | |
RESOURCE_CLASS_ID | NUMBER | (15) | Yes | The identifier of the resource class of the assignment |
ITEM_CATEGORY_ID | NUMBER | (15) | The identifier of the item category of the assignment | |
FINANCIAL_CATEGORY_NAME | VARCHAR2 | (4000) | The financial category of the assignment | |
FC_RES_TYPE_CODE | VARCHAR2 | (30) | The financial category resource type code of the assignment | |
EXPENDITURE_TYPE | VARCHAR2 | (30) | The expenditure type of the assignment | |
EXPENDITURE_CATEGORY | VARCHAR2 | (30) | The expenditure category of the assignment | |
EVENT_TYPE | VARCHAR2 | (30) | The event_type of the assignment | |
REVENUE_CATEGORY_CODE | VARCHAR2 | (30) | The revenue category code of the assignment | |
ORGANIZATION_NAME | VARCHAR2 | (4000) | The organization of the assignment | |
ORGANIZATION_ID | NUMBER | (15) | The identifier of the organization of the assignment | |
SUPPLIER_NAME | VARCHAR2 | (4000) | The supplier of the assignment | |
SUPPLIER_ID | NUMBER | (15) | The identifier of the supplier of the assignment | |
TEAM_ROLE | VARCHAR2 | (80) | The team role of the assignment | |
INCURRED_BY_RESOURCE_NAME | VARCHAR2 | (4000) | The incurred by resource of the assignment | |
INCUR_BY_ROLE_ID | NUMBER | (15) | The identifier of the incurred by role of the assignment | |
INCUR_BY_RES_CLASS_CODE | VARCHAR2 | (30) | The incurred by resource class code of the assignment | |
INCURRED_BY_RES_FLAG | VARCHAR2 | (1) | Indicates whether the resource is an incurred by resource of the assignment | |
PROCURE_RESOURCE_FLAG | VARCHAR2 | (1) | Indicates the procure resource of the assignment | |
ROLE_ID | NUMBER | (15) | The identifier of the role of the assignment | |
PLANNING_START_DATE | DATE | Indicates the planning start date | ||
PLANNING_END_DATE | DATE | Indicates the planning end date | ||
USE_TASK_SCHEDULE_FLAG | VARCHAR2 | (1) | Indicates whether the assignment uses task schedule | |
DELAY | NUMBER | The delay of the assignment | ||
DURATION | NUMBER | The duration of the assignment | ||
MANUFACTURING_COST_TYPE | VARCHAR2 | (4000) | The manufacturing cost type of the assignment | |
MFC_COST_TYPE_ID | NUMBER | (15) | The identifier of the manufacturing cost type of the assignment | |
ETC_METHOD_NAME | VARCHAR2 | (4000) | The forecast ETC method of the assignment | |
ETC_METHOD_CODE | VARCHAR2 | (30) | The forecast ETC method code of the assignment | |
BILLABLE_WORK_PERCENT | NUMBER | The billable work percent of the assignment | ||
PLANNED_BUR_COST_PROJ_CUR | NUMBER | Indicates the planned burdened cost in project currency | ||
PLANNED_RAW_COST_TXN_CUR | NUMBER | Indicates the planned raw cost in transaction currency | ||
PLANNED_RAW_COST_PROJ_CUR | NUMBER | Indicates the planned raw cost in project currency | ||
PLANNED_RAW_COST_PROJFUNC | NUMBER | Indicates the planned raw cost in project functional currency | ||
ACT_BUR_COST_TXN_CUR | NUMBER | Indicates the actual burdened cost in transaction currency | ||
ACT_BUR_COST_PROJ_CUR | NUMBER | Indicates the actual burdened cost in project currency | ||
ACT_BUR_COST_PROJFUNC | NUMBER | Indicates the actual burdened cost in project functional currency | ||
ACT_RAW_COST_TXN_CUR | NUMBER | Indicates the actual raw cost in transaction currency | ||
ACT_RAW_COST_PROJ_CUR | NUMBER | Indicates the actual raw cost in project currency | ||
ACT_RAW_COST_PROJFUNC | NUMBER | Indicates the actual raw cost in project functional currency | ||
AVG_RAW_COST_RATE | NUMBER | Indicates the average raw cost rate | ||
AVG_BUR_COST_RATE | NUMBER | Indicates the average burdened cost rate | ||
SCHEDULED_DELAY | NUMBER | Scheduled delay for assignment |
Cut, paste (and edit) the following text to query this object:
SELECT ACT_SCH_FINISH_VAR
, ACT_SCH_START_VAR
, ACTUAL_COST
, ACTUAL_EFFORT
, ACTUAL_FINISH_DATE
, ACTUAL_START_DATE
, ACTUAL_WORK_QUANTITY
, AS_OF_DATE
, BASELINE_COST
, BASELINE_FINISH_DATE
, BASELINE_START_DATE
, BASELINED_EFFORT
, DAYS_UNTIL_PROGRESS_DUE
, DAYS_UNTIL_SCHEDULED_FINISH
, DAYS_UNTIL_START
, EARNED_VALUE
, ETC_COST
, EST_AT_COMPLETION_EFFORT
, EST_BAS_FINISH_VAR
, EST_BAS_START_VAR
, EST_REMAINING_EFFORT
, EST_SCH_FINISH_VAR
, ESTIMATED_FINISH_DATE
, ESTIMATED_START_DATE
, ETC_COST_TC
, ETC_EFFORT
, ETC_WORK_QUANTITY
, NEXT_PROGRESS_DUE_DATE
, DEFAULT_AS_OF_DATE
, PERCENT_COMPLETE_COST
, PERCENT_COMPLETE_EFFORT
, PERCENT_COMPLETE_ID
, PERCENT_SPENT_COST
, PERCENT_SPENT_EFFORT
, PLANNED_COST
, PLANNED_COST_PER_UNIT
, PLANNED_EFFORT
, PLANNED_WORK_QUANTITY
, PREDECESSORS
, PRIORITY_CODE
, SCH_BASE_FINISH_VAR
, SCH_BASE_START_VAR
, SCH_PERFORMANCE_INDEX
, ASSIGNMENT_END_DATE
, ASSIGNMENT_START_DATE
, TASK_ID
, TASK_MANAGER_NAME
, TASK_MANAGER_PERSON_ID
, TASK_NAME
, TASK_NUMBER
, TASK_TYPE
, TO_COMPLETE_PERFORMANCE_INDEX
, UNIT_OF_MEASURE
, VAR_AT_COMPLETION_COST
, VAR_AT_COMPLETION_EFFORT
, WBS_NUMBER
, WORK_ITEM_CODE
, WORK_TYPE
, RESOURCE_ASSIGNMENT_ID
, CURRENT_FLAG
, DISPLAY_SEQUENCE
, ELEMENT_VERSION_ID
, LONG_NAME
, OBJECT_TYPE
, PROJ_ELEMENT_ID
, PROJECT_ID
, PROJECT_NAME
, PROJECT_NUMBER
, PUBLISHED_BY_NAME
, PUBLISHED_BY_PARTY_ID
, PUBLISHED_FLAG
, RECORD_VERSION_NUMBER
, UOM_CODE
, UOM_DESCRIPTION
, WBS_LEVEL
, WORK_ITEM_DESCRIPTION
, TXN_CURRENCY_CODE
, EFFORT_ENABLED_FLAG
, PROG_ENTRY_ENABLE_FLAG
, RESOURCE_ALIAS
, RESOURCE_LIST_MEMBER_ID
, RESOURCE_CLASS_CODE
, RESOURCE_CLASS
, RBS_ELEMENT_ID
, PERSON_ID
, PROGRESS_COMMENT
, PROGRESS_OVERVIEW
, PRIORITY_DESCRIPTION
, SUMMARY_ELEMENT_FLAG
, RESOURCES
, RATE_BASED_FLAG
, ACTUAL_QUANTITY
, ACTUAL_COST_THIS_PERIOD
, LATEST_PROGRESS_DATE
, STRUCTURE_VERSION_ID
, SPREAD_CURVE_ID
, SPREAD_CURVE_NAME
, ASSIGNMENT_DESCRIPTION
, PLANNED_BUR_COST_PROJFUNC
, PLANNED_QUANTITY
, ROLE_NAME
, PM_RES_ASSIGNMENT_REFERENCE
, PM_PROJECT_REFERENCE
, PM_PRODUCT_CODE
, PM_TASK_REFERENCE
, RESOURCE_CLASS_FLAG
, UNPLANNED_FLAG
, RESOURCE_NAME
, RES_TYPE_CODE
, BOM_RESOURCE_ID
, JOB_ID
, PERSON_TYPE_CODE
, NON_LABOR_RESOURCE
, INVENTORY_ITEM_ID
, RESOURCE_CLASS_ID
, ITEM_CATEGORY_ID
, FINANCIAL_CATEGORY_NAME
, FC_RES_TYPE_CODE
, EXPENDITURE_TYPE
, EXPENDITURE_CATEGORY
, EVENT_TYPE
, REVENUE_CATEGORY_CODE
, ORGANIZATION_NAME
, ORGANIZATION_ID
, SUPPLIER_NAME
, SUPPLIER_ID
, TEAM_ROLE
, INCURRED_BY_RESOURCE_NAME
, INCUR_BY_ROLE_ID
, INCUR_BY_RES_CLASS_CODE
, INCURRED_BY_RES_FLAG
, PROCURE_RESOURCE_FLAG
, ROLE_ID
, PLANNING_START_DATE
, PLANNING_END_DATE
, USE_TASK_SCHEDULE_FLAG
, DELAY
, DURATION
, MANUFACTURING_COST_TYPE
, MFC_COST_TYPE_ID
, ETC_METHOD_NAME
, ETC_METHOD_CODE
, BILLABLE_WORK_PERCENT
, PLANNED_BUR_COST_PROJ_CUR
, PLANNED_RAW_COST_TXN_CUR
, PLANNED_RAW_COST_PROJ_CUR
, PLANNED_RAW_COST_PROJFUNC
, ACT_BUR_COST_TXN_CUR
, ACT_BUR_COST_PROJ_CUR
, ACT_BUR_COST_PROJFUNC
, ACT_RAW_COST_TXN_CUR
, ACT_RAW_COST_PROJ_CUR
, ACT_RAW_COST_PROJFUNC
, AVG_RAW_COST_RATE
, AVG_BUR_COST_RATE
, SCHEDULED_DELAY
FROM APPS.PA_TASK_ASSIGNMENTS_AMG_V;
APPS.PA_TASK_ASSIGNMENTS_AMG_V is not referenced by any database object
|
|
|