[Home] [Help]
PACKAGE BODY: APPS.PQH_ACC_DEL
Source
1 Package Body pqh_acc_del as
2 /* $Header: pqaccrhi.pkb 115.4 2004/03/15 23:54:54 svorugan noship $ */
3 --
4 -- ----------------------------------------------------------------------------
5 -- | Private Global Definitions |
6 -- ----------------------------------------------------------------------------
7 --
8 g_package varchar2(33) := ' pqh_acc_del.'; -- Global package name
9 --
10 -- ----------------------------------------------------------------------------
11 -- |----------------------------< dt_delete_dml >-----------------------------|
12 -- ----------------------------------------------------------------------------
13 -- {Start Of Comments}
14 --
15 -- Description:
16 -- This procedure controls the actual dml delete logic for the datetrack
17 -- delete modes: ZAP, DELETE, FUTURE_CHANGE and DELETE_NEXT_CHANGE. The
18 -- execution is as follows:
19 -- 1) To set and unset the g_api_dml status as required (as we are about to
20 -- perform dml).
21 -- 2) If the delete mode is DELETE_NEXT_CHANGE then delete where the
22 -- effective start date is equal to the validation start date.
23 -- 3) If the delete mode is not DELETE_NEXT_CHANGE then delete
24 -- all rows for the entity where the effective start date is greater
25 -- than or equal to the validation start date.
26 -- 4) To raise any errors.
27 --
28 -- Prerequisites:
29 -- This is an internal private procedure which must be called from the
30 -- delete_dml procedure.
31 --
32 -- In Parameters:
33 -- A Pl/Sql record structure.
34 --
35 -- Post Success:
36 -- The specified row will be delete from the schema.
37 --
38 -- Post Failure:
39 -- On the delete dml failure it is important to note that we always reset the
40 -- g_api_dml status to false.
41 -- If any other error is reported, the error will be raised after the
42 -- g_api_dml status is reset.
43 --
44 -- Developer Implementation Notes:
45 -- This is an internal private procedure which must be called from the
46 -- delete_dml procedure.
47 --
48 -- Access Status:
49 -- Internal Row Handler Use Only.
50 --
51 -- {End Of Comments}
52 -- ----------------------------------------------------------------------------
53 Procedure dt_delete_dml
54 (p_rec in out nocopy pqh_acc_shd.g_rec_type
55 ,p_effective_date in date
56 ,p_datetrack_mode in varchar2
57 ,p_validation_start_date in date
58 ,p_validation_end_date in date
59 ) is
60 --
61 l_proc varchar2(72) := g_package||'dt_delete_dml';
62 --
63 Begin
64 hr_utility.set_location('Entering:'||l_proc, 5);
65 If (p_datetrack_mode = hr_api.g_delete_next_change) then
66 --
67 --
68 -- Delete the where the effective start date is equal
69 -- to the validation end date.
70 --
71 delete from pqh_accommodations_f
72 where accommodation_id = p_rec.accommodation_id
73 and effective_start_date = p_validation_start_date;
74 --
75 --
76 Else
77 --
78 --
79 -- Delete the row(s) where the effective start date is greater than
80 -- or equal to the validation start date.
81 --
82 delete from pqh_accommodations_f
83 where accommodation_id = p_rec.accommodation_id
84 and effective_start_date >= p_validation_start_date;
85 --
86 --
87 End If;
88 --
89 hr_utility.set_location(' Leaving:'||l_proc, 20);
90 --
91 End dt_delete_dml;
92 --
93 -- ----------------------------------------------------------------------------
94 -- |------------------------------< delete_dml >------------------------------|
95 -- ----------------------------------------------------------------------------
96 Procedure delete_dml
97 (p_rec in out nocopy pqh_acc_shd.g_rec_type
98 ,p_effective_date in date
99 ,p_datetrack_mode in varchar2
100 ,p_validation_start_date in date
101 ,p_validation_end_date in date
102 ) is
103 --
104 l_proc varchar2(72) := g_package||'delete_dml';
105 --
106 Begin
107 hr_utility.set_location('Entering:'||l_proc, 5);
108 --
109 pqh_acc_del.dt_delete_dml
110 (p_rec => p_rec
111 ,p_effective_date => p_effective_date
112 ,p_datetrack_mode => p_datetrack_mode
113 ,p_validation_start_date => p_validation_start_date
114 ,p_validation_end_date => p_validation_end_date
115 );
116 --
117 hr_utility.set_location(' Leaving:'||l_proc, 10);
118 End delete_dml;
119 --
120 -- ----------------------------------------------------------------------------
121 -- |----------------------------< dt_pre_delete >-----------------------------|
122 -- ----------------------------------------------------------------------------
123 -- {Start Of Comments}
124 --
125 -- Description:
126 -- The dt_pre_delete process controls the execution of dml
127 -- for the datetrack modes: DELETE, FUTURE_CHANGE
128 -- and DELETE_NEXT_CHANGE only.
129 --
130 -- Prerequisites:
131 -- This is an internal procedure which is called from the pre_delete
132 -- procedure.
133 --
134 -- In Parameters:
135 -- A Pl/Sql record structure.
136 --
137 -- Post Success:
138 -- Processing continues.
139 --
140 -- Post Failure:
141 -- If an error has occurred, an error message and exception will be raised
142 -- but not handled.
143 --
144 -- Developer Implementation Notes:
145 -- This is an internal procedure which is required by Datetrack. Don't
146 -- remove or modify.
147 --
148 -- Access Status:
149 -- Internal Row Handler Use Only.
150 --
151 -- {End Of Comments}
152 -- ----------------------------------------------------------------------------
153 Procedure dt_pre_delete
154 (p_rec in out nocopy pqh_acc_shd.g_rec_type
155 ,p_effective_date in date
156 ,p_datetrack_mode in varchar2
157 ,p_validation_start_date in date
158 ,p_validation_end_date in date
159 ) is
160 --
161 l_proc varchar2(72) := g_package||'dt_pre_delete';
162 --
163 Begin
164 hr_utility.set_location('Entering:'||l_proc, 5);
165 --
166 If (p_datetrack_mode <> hr_api.g_zap) then
167 --
168 p_rec.effective_start_date
169 := pqh_acc_shd.g_old_rec.effective_start_date;
170 --
171 If (p_datetrack_mode = hr_api.g_delete) then
172 p_rec.effective_end_date := p_validation_start_date - 1;
173 Else
174 p_rec.effective_end_date := p_validation_end_date;
175 End If;
176 --
177 -- Update the current effective end date record
178 --
179 pqh_acc_shd.upd_effective_end_date
180 (p_effective_date => p_effective_date
181 ,p_base_key_value => p_rec.accommodation_id
182 ,p_new_effective_end_date => p_rec.effective_end_date
183 ,p_validation_start_date => p_validation_start_date
184 ,p_validation_end_date => p_validation_end_date
185 ,p_object_version_number => p_rec.object_version_number
186 );
187 Else
188 p_rec.effective_start_date := null;
189 p_rec.effective_end_date := null;
190 End If;
191 hr_utility.set_location(' Leaving:'||l_proc, 10);
192 End dt_pre_delete;
193 --
194 -- ----------------------------------------------------------------------------
195 -- |------------------------------< pre_delete >------------------------------|
196 -- ----------------------------------------------------------------------------
197 -- {Start Of Comments}
198 --
199 -- Description:
200 -- This private procedure contains any processing which is required before
201 -- the delete dml.
202 --
203 -- Prerequisites:
204 -- This is an internal procedure which is called from the del procedure.
205 --
206 -- In Parameters:
207 -- A Pl/Sql record structure.
208 --
209 -- Post Success:
210 -- Processing continues.
211 --
212 -- Post Failure:
213 -- If an error has occurred, an error message and exception will be raised
214 -- but not handled.
215 --
216 -- Developer Implementation Notes:
217 -- Any pre-processing required before the delete dml is issued should be
218 -- coded within this procedure. It is important to note that any 3rd party
219 -- maintenance should be reviewed before placing in this procedure. The call
220 -- to the dt_delete_dml procedure should NOT be removed.
221 --
222 -- Access Status:
223 -- Internal Row Handler Use Only.
224 --
225 -- {End Of Comments}
226 -- ----------------------------------------------------------------------------
227 Procedure pre_delete
228 (p_rec in out nocopy pqh_acc_shd.g_rec_type
229 ,p_effective_date in date
230 ,p_datetrack_mode in varchar2
231 ,p_validation_start_date in date
232 ,p_validation_end_date in date
233 ) is
234 --
235 l_proc varchar2(72) := g_package||'pre_delete';
236 --
237 --
238 --
239 Begin
240 hr_utility.set_location('Entering:'||l_proc, 5);
241 --
242 --
243 --
244 pqh_acc_del.dt_pre_delete
245 (p_rec => p_rec
246 ,p_effective_date => p_effective_date
247 ,p_datetrack_mode => p_datetrack_mode
248 ,p_validation_start_date => p_validation_start_date
249 ,p_validation_end_date => p_validation_end_date
250 );
251 --
252 hr_utility.set_location(' Leaving:'||l_proc, 10);
253 End pre_delete;
254 --
255 -- ----------------------------------------------------------------------------
256 -- |----------------------------< post_delete >-------------------------------|
257 -- ----------------------------------------------------------------------------
258 -- {Start Of Comments}
259 --
260 -- Description:
261 -- This private procedure contains any processing which is required after
262 -- the delete dml.
263 --
264 -- Prerequisites:
265 -- This is an internal procedure which is called from the del procedure.
266 --
267 -- In Parameters:
268 -- A Pl/Sql record structure.
269 --
270 -- Post Success:
271 -- Processing continues.
272 --
273 -- Post Failure:
274 -- If an error has occurred, an error message and exception will be raised
275 -- but not handled.
276 --
277 -- Developer Implementation Notes:
278 -- Any post-processing required after the delete dml is issued should be
279 -- coded within this procedure. It is important to note that any 3rd party
280 -- maintenance should be reviewed before placing in this procedure.
281 --
282 -- Access Status:
283 -- Internal Row Handler Use Only.
284 --
285 -- {End Of Comments}
286 -- ----------------------------------------------------------------------------
287 Procedure post_delete
288 (p_rec in pqh_acc_shd.g_rec_type
289 ,p_effective_date in date
290 ,p_datetrack_mode in varchar2
291 ,p_validation_start_date in date
292 ,p_validation_end_date in date
293 ) is
294 --
295 l_proc varchar2(72) := g_package||'post_delete';
296 --
297 Begin
298 hr_utility.set_location('Entering:'||l_proc, 5);
299 begin
300 --
301 pqh_acc_rkd.after_delete
302 (p_effective_date
303 => p_effective_date
304 ,p_datetrack_mode
305 => p_datetrack_mode
306 ,p_validation_start_date
307 => p_validation_start_date
308 ,p_validation_end_date
309 => p_validation_end_date
310 ,p_accommodation_id
311 => p_rec.accommodation_id
312 ,p_effective_start_date
313 => p_rec.effective_start_date
314 ,p_effective_end_date
315 => p_rec.effective_end_date
316 ,p_accommodation_name_o
317 => pqh_acc_shd.g_old_rec.accommodation_name
318 ,p_effective_start_date_o
319 => pqh_acc_shd.g_old_rec.effective_start_date
320 ,p_effective_end_date_o
321 => pqh_acc_shd.g_old_rec.effective_end_date
322 ,p_business_group_id_o
323 => pqh_acc_shd.g_old_rec.business_group_id
324 ,p_location_id_o
325 => pqh_acc_shd.g_old_rec.location_id
326 ,p_accommodation_desc_o
327 => pqh_acc_shd.g_old_rec.accommodation_desc
328 ,p_accommodation_type_o
329 => pqh_acc_shd.g_old_rec.accommodation_type
330 ,p_style_o
331 => pqh_acc_shd.g_old_rec.style
332 ,p_address_line_1_o
333 => pqh_acc_shd.g_old_rec.address_line_1
334 ,p_address_line_2_o
335 => pqh_acc_shd.g_old_rec.address_line_2
336 ,p_address_line_3_o
337 => pqh_acc_shd.g_old_rec.address_line_3
338 ,p_town_or_city_o
339 => pqh_acc_shd.g_old_rec.town_or_city
340 ,p_country_o
341 => pqh_acc_shd.g_old_rec.country
342 ,p_postal_code_o
343 => pqh_acc_shd.g_old_rec.postal_code
344 ,p_region_1_o
345 => pqh_acc_shd.g_old_rec.region_1
346 ,p_region_2_o
347 => pqh_acc_shd.g_old_rec.region_2
348 ,p_region_3_o
349 => pqh_acc_shd.g_old_rec.region_3
350 ,p_telephone_number_1_o
351 => pqh_acc_shd.g_old_rec.telephone_number_1
352 ,p_telephone_number_2_o
353 => pqh_acc_shd.g_old_rec.telephone_number_2
354 ,p_telephone_number_3_o
355 => pqh_acc_shd.g_old_rec.telephone_number_3
356 ,p_floor_number_o
357 => pqh_acc_shd.g_old_rec.floor_number
358 ,p_floor_area_o
359 => pqh_acc_shd.g_old_rec.floor_area
360 ,p_floor_area_measure_unit_o
361 => pqh_acc_shd.g_old_rec.floor_area_measure_unit
362 ,p_main_rooms_o
363 => pqh_acc_shd.g_old_rec.main_rooms
364 ,p_family_size_o
365 => pqh_acc_shd.g_old_rec.family_size
366 ,p_suitability_disabled_o
367 => pqh_acc_shd.g_old_rec.suitability_disabled
368 ,p_rental_value_o
369 => pqh_acc_shd.g_old_rec.rental_value
370 ,p_rental_value_currency_o
371 => pqh_acc_shd.g_old_rec.rental_value_currency
372 ,p_owner_o
373 => pqh_acc_shd.g_old_rec.owner
374 ,p_comments_o
375 => pqh_acc_shd.g_old_rec.comments
376 ,p_information_category_o
377 => pqh_acc_shd.g_old_rec.information_category
378 ,p_information1_o
379 => pqh_acc_shd.g_old_rec.information1
380 ,p_information2_o
381 => pqh_acc_shd.g_old_rec.information2
382 ,p_information3_o
383 => pqh_acc_shd.g_old_rec.information3
384 ,p_information4_o
385 => pqh_acc_shd.g_old_rec.information4
386 ,p_information5_o
387 => pqh_acc_shd.g_old_rec.information5
388 ,p_information6_o
389 => pqh_acc_shd.g_old_rec.information6
390 ,p_information7_o
391 => pqh_acc_shd.g_old_rec.information7
392 ,p_information8_o
393 => pqh_acc_shd.g_old_rec.information8
394 ,p_information9_o
395 => pqh_acc_shd.g_old_rec.information9
396 ,p_information10_o
397 => pqh_acc_shd.g_old_rec.information10
398 ,p_information11_o
399 => pqh_acc_shd.g_old_rec.information11
400 ,p_information12_o
401 => pqh_acc_shd.g_old_rec.information12
402 ,p_information13_o
403 => pqh_acc_shd.g_old_rec.information13
404 ,p_information14_o
405 => pqh_acc_shd.g_old_rec.information14
406 ,p_information15_o
407 => pqh_acc_shd.g_old_rec.information15
408 ,p_information16_o
409 => pqh_acc_shd.g_old_rec.information16
410 ,p_information17_o
411 => pqh_acc_shd.g_old_rec.information17
412 ,p_information18_o
413 => pqh_acc_shd.g_old_rec.information18
414 ,p_information19_o
415 => pqh_acc_shd.g_old_rec.information19
416 ,p_information20_o
417 => pqh_acc_shd.g_old_rec.information20
418 ,p_information21_o
419 => pqh_acc_shd.g_old_rec.information21
420 ,p_information22_o
421 => pqh_acc_shd.g_old_rec.information22
422 ,p_information23_o
423 => pqh_acc_shd.g_old_rec.information23
424 ,p_information24_o
425 => pqh_acc_shd.g_old_rec.information24
426 ,p_information25_o
427 => pqh_acc_shd.g_old_rec.information25
428 ,p_information26_o
429 => pqh_acc_shd.g_old_rec.information26
430 ,p_information27_o
431 => pqh_acc_shd.g_old_rec.information27
432 ,p_information28_o
433 => pqh_acc_shd.g_old_rec.information28
434 ,p_information29_o
435 => pqh_acc_shd.g_old_rec.information29
436 ,p_information30_o
437 => pqh_acc_shd.g_old_rec.information30
438 ,p_attribute_category_o
439 => pqh_acc_shd.g_old_rec.attribute_category
440 ,p_attribute1_o
441 => pqh_acc_shd.g_old_rec.attribute1
442 ,p_attribute2_o
443 => pqh_acc_shd.g_old_rec.attribute2
444 ,p_attribute3_o
445 => pqh_acc_shd.g_old_rec.attribute3
446 ,p_attribute4_o
447 => pqh_acc_shd.g_old_rec.attribute4
448 ,p_attribute5_o
449 => pqh_acc_shd.g_old_rec.attribute5
450 ,p_attribute6_o
451 => pqh_acc_shd.g_old_rec.attribute6
452 ,p_attribute7_o
453 => pqh_acc_shd.g_old_rec.attribute7
454 ,p_attribute8_o
455 => pqh_acc_shd.g_old_rec.attribute8
456 ,p_attribute9_o
457 => pqh_acc_shd.g_old_rec.attribute9
458 ,p_attribute10_o
459 => pqh_acc_shd.g_old_rec.attribute10
460 ,p_attribute11_o
461 => pqh_acc_shd.g_old_rec.attribute11
462 ,p_attribute12_o
463 => pqh_acc_shd.g_old_rec.attribute12
464 ,p_attribute13_o
465 => pqh_acc_shd.g_old_rec.attribute13
466 ,p_attribute14_o
467 => pqh_acc_shd.g_old_rec.attribute14
468 ,p_attribute15_o
469 => pqh_acc_shd.g_old_rec.attribute15
470 ,p_attribute16_o
471 => pqh_acc_shd.g_old_rec.attribute16
472 ,p_attribute17_o
473 => pqh_acc_shd.g_old_rec.attribute17
474 ,p_attribute18_o
475 => pqh_acc_shd.g_old_rec.attribute18
476 ,p_attribute19_o
477 => pqh_acc_shd.g_old_rec.attribute19
478 ,p_attribute20_o
479 => pqh_acc_shd.g_old_rec.attribute20
480 ,p_attribute21_o
481 => pqh_acc_shd.g_old_rec.attribute21
482 ,p_attribute22_o
483 => pqh_acc_shd.g_old_rec.attribute22
484 ,p_attribute23_o
485 => pqh_acc_shd.g_old_rec.attribute23
486 ,p_attribute24_o
487 => pqh_acc_shd.g_old_rec.attribute24
488 ,p_attribute25_o
489 => pqh_acc_shd.g_old_rec.attribute25
490 ,p_attribute26_o
491 => pqh_acc_shd.g_old_rec.attribute26
492 ,p_attribute27_o
493 => pqh_acc_shd.g_old_rec.attribute27
494 ,p_attribute28_o
495 => pqh_acc_shd.g_old_rec.attribute28
496 ,p_attribute29_o
497 => pqh_acc_shd.g_old_rec.attribute29
498 ,p_attribute30_o
499 => pqh_acc_shd.g_old_rec.attribute30
500 ,p_object_version_number_o
501 => pqh_acc_shd.g_old_rec.object_version_number
502 );
503 --
504 exception
505 --
506 when hr_api.cannot_find_prog_unit then
507 --
508 hr_api.cannot_find_prog_unit_error
509 (p_module_name => 'PQH_ACCOMMODATIONS_F'
510 ,p_hook_type => 'AD');
511 --
512 end;
513 --
514 hr_utility.set_location(' Leaving:'||l_proc, 10);
515 End post_delete;
516 --
517 -- ----------------------------------------------------------------------------
518 -- |---------------------------------< del >----------------------------------|
519 -- ----------------------------------------------------------------------------
520 Procedure del
521 (p_effective_date in date
522 ,p_datetrack_mode in varchar2
523 ,p_rec in out nocopy pqh_acc_shd.g_rec_type
524 ) is
525 --
526 l_proc varchar2(72) := g_package||'del';
527 l_validation_start_date date;
528 l_validation_end_date date;
529 --
530 Begin
531 hr_utility.set_location('Entering:'||l_proc, 5);
532 --
533 -- Ensure that the DateTrack delete mode is valid
534 --
535 dt_api.validate_dt_del_mode(p_datetrack_mode => p_datetrack_mode);
536 --
537 -- We must lock the row which we need to delete.
538 --
539 pqh_acc_shd.lck
540 (p_effective_date => p_effective_date
541 ,p_datetrack_mode => p_datetrack_mode
542 ,p_accommodation_id => p_rec.accommodation_id
543 ,p_object_version_number => p_rec.object_version_number
544 ,p_validation_start_date => l_validation_start_date
545 ,p_validation_end_date => l_validation_end_date
546 );
547 --
548 -- Call the supporting delete validate operation
549 --
550 pqh_acc_bus.delete_validate
551 (p_rec => p_rec
552 ,p_effective_date => p_effective_date
553 ,p_datetrack_mode => p_datetrack_mode
554 ,p_validation_start_date => l_validation_start_date
555 ,p_validation_end_date => l_validation_end_date
556 );
557 --
558 -- Call to raise any errors on multi-message list
559 hr_multi_message.end_validation_set;
560 --
561 -- Call the supporting pre-delete operation
562 --
563 pqh_acc_del.pre_delete
564 (p_rec => p_rec
565 ,p_effective_date => p_effective_date
566 ,p_datetrack_mode => p_datetrack_mode
567 ,p_validation_start_date => l_validation_start_date
568 ,p_validation_end_date => l_validation_end_date
569 );
570 --
571 -- Delete the row.
572 --
573 pqh_acc_del.delete_dml
574 (p_rec => p_rec
575 ,p_effective_date => p_effective_date
576 ,p_datetrack_mode => p_datetrack_mode
577 ,p_validation_start_date => l_validation_start_date
578 ,p_validation_end_date => l_validation_end_date
579 );
580 -- Call the supporting post-delete operation
581 --
582 pqh_acc_del.post_delete
583 (p_rec => p_rec
584 ,p_effective_date => p_effective_date
585 ,p_datetrack_mode => p_datetrack_mode
586 ,p_validation_start_date => l_validation_start_date
587 ,p_validation_end_date => l_validation_end_date
588 );
589 --
590 -- Call to raise any errors on multi-message list
591 hr_multi_message.end_validation_set;
592 --
593 hr_utility.set_location(' Leaving:'||l_proc, 5);
594 End del;
595 --
596 -- ----------------------------------------------------------------------------
597 -- |--------------------------------< del >-----------------------------------|
598 -- ----------------------------------------------------------------------------
599 Procedure del
600 (p_effective_date in date
601 ,p_datetrack_mode in varchar2
602 ,p_accommodation_id in number
603 ,p_object_version_number in out nocopy number
604 ,p_effective_start_date out nocopy date
605 ,p_effective_end_date out nocopy date
606 ) is
607 --
608 l_rec pqh_acc_shd.g_rec_type;
609 l_proc varchar2(72) := g_package||'del';
610 --
611 Begin
612 hr_utility.set_location('Entering:'||l_proc, 5);
613 --
614 -- As the delete procedure accepts a plsql record structure we do need to
615 -- convert the arguments into the record structure.
616 -- We don't need to call the supplied conversion argument routine as we
617 -- only need a few attributes.
618 --
619 l_rec.accommodation_id := p_accommodation_id;
620 l_rec.object_version_number := p_object_version_number;
621 --
622 -- Having converted the arguments into the pqh_acc_rec
623 -- plsql record structure we must call the corresponding entity
624 -- business process
625 --
626 pqh_acc_del.del
627 (p_effective_date
628 ,p_datetrack_mode
629 ,l_rec
630 );
631 --
632 --
633 -- Set the out arguments
634 --
635 p_object_version_number := l_rec.object_version_number;
636 p_effective_start_date := l_rec.effective_start_date;
637 p_effective_end_date := l_rec.effective_end_date;
638 --
639 hr_utility.set_location(' Leaving:'||l_proc, 10);
640 End del;
641 --
642 end pqh_acc_del;