1 Package Body pqp_shp_del as
2 /* $Header: pqshprhi.pkb 115.8 2003/02/17 22:14:48 tmehra noship $ */
3 --
4 -- ----------------------------------------------------------------------------
5 -- | Private Global Definitions |
6 -- ----------------------------------------------------------------------------
7 --
8 g_package varchar2(33) := ' pqp_shp_del.'; -- Global package name
9 --
10 -- ----------------------------------------------------------------------------
11 -- |------------------------------< delete_dml >------------------------------|
12 -- ----------------------------------------------------------------------------
13 -- {Start Of Comments}
14 --
15 -- Description:
16 -- This procedure controls the actual dml delete logic. The functions of
17 -- this procedure are as follows:
18 -- 1) To set and unset the g_api_dml status as required (as we are about to
19 -- perform dml).
20 -- 2) To delete the specified row from the schema using the primary key in
21 -- the predicates.
22 -- 3) To trap any constraint violations that may have occurred.
23 -- 4) To raise any other errors.
24 --
25 -- Prerequisites:
26 -- This is an internal private procedure which must be called from the del
27 -- procedure.
28 --
29 -- In Parameters:
30 -- A Pl/Sql record structre.
31 --
32 -- Post Success:
33 -- The specified row will be delete from the schema.
34 --
35 -- Post Failure:
36 -- On the delete dml failure it is important to note that we always reset the
37 -- g_api_dml status to false.
38 -- If a child integrity constraint violation is raised the
39 -- constraint_error procedure will be called.
40 -- If any other error is reported, the error will be raised after the
41 -- g_api_dml status is reset.
42 --
43 -- Developer Implementation Notes:
44 -- None.
45 --
46 -- Access Status:
47 -- Internal Row Handler Use Only.
48 --
49 -- {End Of Comments}
50 -- ----------------------------------------------------------------------------
51 Procedure delete_dml
52 (p_rec in pqp_shp_shd.g_rec_type
53 ) is
54 --
55 l_proc varchar2(72) := g_package||'delete_dml';
56 --
57 Begin
58 hr_utility.set_location('Entering:'||l_proc, 5);
59 --
60 pqp_shp_shd.g_api_dml := true; -- Set the api dml status
61 --
62 -- Delete the pqp_service_history_periods row.
63 --
64 delete from pqp_service_history_periods
65 where service_history_period_id = p_rec.service_history_period_id;
66 --
67 pqp_shp_shd.g_api_dml := false; -- Unset the api dml status
68 --
69 hr_utility.set_location(' Leaving:'||l_proc, 10);
70 --
71 Exception
72 When hr_api.child_integrity_violated then
73 -- Child integrity has been violated
74 pqp_shp_shd.g_api_dml := false; -- Unset the api dml status
75 pqp_shp_shd.constraint_error
76 (p_constraint_name => hr_api.strip_constraint_name(SQLERRM));
77 When Others Then
78 pqp_shp_shd.g_api_dml := false; -- Unset the api dml status
79 Raise;
80 End delete_dml;
81 --
82 -- ----------------------------------------------------------------------------
83 -- |------------------------------< pre_delete >------------------------------|
84 -- ----------------------------------------------------------------------------
85 -- {Start Of Comments}
86 --
87 -- Description:
88 -- This private procedure contains any processing which is required before
89 -- the delete dml.
90 --
91 -- Prerequisites:
92 -- This is an internal procedure which is called from the del procedure.
93 --
94 -- In Parameters:
95 -- A Pl/Sql record structre.
96 --
97 -- Post Success:
98 -- Processing continues.
99 --
100 -- Post Failure:
101 -- If an error has occurred, an error message and exception will be raised
102 -- but not handled.
103 --
104 -- Developer Implementation Notes:
105 -- Any pre-processing required before the delete dml is issued should be
106 -- coded within this procedure. It is important to note that any 3rd party
107 -- maintenance should be reviewed before placing in this procedure.
108 --
109 -- Access Status:
110 -- Internal Row Handler Use Only.
111 --
112 -- {End Of Comments}
113 -- ----------------------------------------------------------------------------
114 Procedure pre_delete(p_rec in pqp_shp_shd.g_rec_type) is
115 --
116 l_proc varchar2(72) := g_package||'pre_delete';
117 --
118 Begin
119 hr_utility.set_location('Entering:'||l_proc, 5);
120 --
121 hr_utility.set_location(' Leaving:'||l_proc, 10);
122 End pre_delete;
123 --
124 -- ----------------------------------------------------------------------------
125 -- |-----------------------------< post_delete >------------------------------|
126 -- ----------------------------------------------------------------------------
127 -- {Start Of Comments}
128 --
129 -- Description:
130 -- This private procedure contains any processing which is required after the
131 -- delete dml.
132 --
133 -- Prerequistes:
134 -- This is an internal procedure which is called from the del procedure.
135 --
136 -- In Parameters:
137 -- A Pl/Sql record structure.
138 --
139 -- Post Success:
140 -- Processing continues.
141 --
142 -- Post Failure:
143 -- If an error has occurred, an error message and exception will be raised
144 -- but not handled.
145 --
146 -- Developer Implementation Notes:
147 -- Any post-processing required after the delete dml is issued should be
148 -- coded within this procedure. It is important to note that any 3rd party
149 -- maintenance should be reviewed before placing in this procedure.
150 --
151 -- Access Status:
152 -- Internal Row Handler Use Only.
153 --
154 -- {End Of Comments}
155 -- -----------------------------------------------------------------------------
156 Procedure post_delete(p_rec in pqp_shp_shd.g_rec_type) is
157 --
158 l_proc varchar2(72) := g_package||'post_delete';
159 --
160 Begin
161 hr_utility.set_location('Entering:'||l_proc, 5);
162 begin
163 --
164 pqp_shp_rkd.after_delete
165 (p_service_history_period_id
166 => p_rec.service_history_period_id
167 ,p_business_group_id_o
168 => pqp_shp_shd.g_old_rec.business_group_id
169 ,p_assignment_id_o
170 => pqp_shp_shd.g_old_rec.assignment_id
171 ,p_start_date_o
172 => pqp_shp_shd.g_old_rec.start_date
173 ,p_end_date_o
174 => pqp_shp_shd.g_old_rec.end_date
175 ,p_employer_name_o
176 => pqp_shp_shd.g_old_rec.employer_name
177 ,p_employer_address_o
178 => pqp_shp_shd.g_old_rec.employer_address
179 ,p_employer_type_o
180 => pqp_shp_shd.g_old_rec.employer_type
181 ,p_employer_subtype_o
182 => pqp_shp_shd.g_old_rec.employer_subtype
183 ,p_period_years_o
184 => pqp_shp_shd.g_old_rec.period_years
185 ,p_period_days_o
186 => pqp_shp_shd.g_old_rec.period_days
187 ,p_description_o
188 => pqp_shp_shd.g_old_rec.description
189 ,p_continuous_service_o
190 => pqp_shp_shd.g_old_rec.continuous_service
191 ,p_all_assignments_o
192 => pqp_shp_shd.g_old_rec.all_assignments
193 ,p_object_version_number_o
194 => pqp_shp_shd.g_old_rec.object_version_number
195 ,p_shp_attribute_category_o
196 => pqp_shp_shd.g_old_rec.shp_attribute_category
197 ,p_shp_attribute1_o
198 => pqp_shp_shd.g_old_rec.shp_attribute1
199 ,p_shp_attribute2_o
200 => pqp_shp_shd.g_old_rec.shp_attribute2
201 ,p_shp_attribute3_o
202 => pqp_shp_shd.g_old_rec.shp_attribute3
203 ,p_shp_attribute4_o
204 => pqp_shp_shd.g_old_rec.shp_attribute4
205 ,p_shp_attribute5_o
206 => pqp_shp_shd.g_old_rec.shp_attribute5
207 ,p_shp_attribute6_o
208 => pqp_shp_shd.g_old_rec.shp_attribute6
209 ,p_shp_attribute7_o
210 => pqp_shp_shd.g_old_rec.shp_attribute7
211 ,p_shp_attribute8_o
212 => pqp_shp_shd.g_old_rec.shp_attribute8
213 ,p_shp_attribute9_o
214 => pqp_shp_shd.g_old_rec.shp_attribute9
215 ,p_shp_attribute10_o
216 => pqp_shp_shd.g_old_rec.shp_attribute10
217 ,p_shp_attribute11_o
218 => pqp_shp_shd.g_old_rec.shp_attribute11
219 ,p_shp_attribute12_o
220 => pqp_shp_shd.g_old_rec.shp_attribute12
221 ,p_shp_attribute13_o
222 => pqp_shp_shd.g_old_rec.shp_attribute13
223 ,p_shp_attribute14_o
224 => pqp_shp_shd.g_old_rec.shp_attribute14
225 ,p_shp_attribute15_o
226 => pqp_shp_shd.g_old_rec.shp_attribute15
227 ,p_shp_attribute16_o
228 => pqp_shp_shd.g_old_rec.shp_attribute16
229 ,p_shp_attribute17_o
230 => pqp_shp_shd.g_old_rec.shp_attribute17
231 ,p_shp_attribute18_o
232 => pqp_shp_shd.g_old_rec.shp_attribute18
233 ,p_shp_attribute19_o
234 => pqp_shp_shd.g_old_rec.shp_attribute19
235 ,p_shp_attribute20_o
236 => pqp_shp_shd.g_old_rec.shp_attribute20
237 ,p_shp_information_category_o
238 => pqp_shp_shd.g_old_rec.shp_information_category
239 ,p_shp_information1_o
240 => pqp_shp_shd.g_old_rec.shp_information1
241 ,p_shp_information2_o
242 => pqp_shp_shd.g_old_rec.shp_information2
243 ,p_shp_information3_o
244 => pqp_shp_shd.g_old_rec.shp_information3
245 ,p_shp_information4_o
246 => pqp_shp_shd.g_old_rec.shp_information4
247 ,p_shp_information5_o
248 => pqp_shp_shd.g_old_rec.shp_information5
249 ,p_shp_information6_o
250 => pqp_shp_shd.g_old_rec.shp_information6
251 ,p_shp_information7_o
252 => pqp_shp_shd.g_old_rec.shp_information7
253 ,p_shp_information8_o
254 => pqp_shp_shd.g_old_rec.shp_information8
255 ,p_shp_information9_o
256 => pqp_shp_shd.g_old_rec.shp_information9
257 ,p_shp_information10_o
258 => pqp_shp_shd.g_old_rec.shp_information10
259 ,p_shp_information11_o
260 => pqp_shp_shd.g_old_rec.shp_information11
261 ,p_shp_information12_o
262 => pqp_shp_shd.g_old_rec.shp_information12
263 ,p_shp_information13_o
264 => pqp_shp_shd.g_old_rec.shp_information13
265 ,p_shp_information14_o
266 => pqp_shp_shd.g_old_rec.shp_information14
267 ,p_shp_information15_o
268 => pqp_shp_shd.g_old_rec.shp_information15
269 ,p_shp_information16_o
270 => pqp_shp_shd.g_old_rec.shp_information16
271 ,p_shp_information17_o
272 => pqp_shp_shd.g_old_rec.shp_information17
273 ,p_shp_information18_o
274 => pqp_shp_shd.g_old_rec.shp_information18
275 ,p_shp_information19_o
276 => pqp_shp_shd.g_old_rec.shp_information19
277 ,p_shp_information20_o
278 => pqp_shp_shd.g_old_rec.shp_information20
279 );
280 --
281 exception
282 --
283 when hr_api.cannot_find_prog_unit then
284 --
285 hr_api.cannot_find_prog_unit_error
286 (p_module_name => 'PQP_SERVICE_HISTORY_PERIODS'
287 ,p_hook_type => 'AD');
288 --
289 end;
290 --
291 hr_utility.set_location(' Leaving:'||l_proc, 10);
292 End post_delete;
293 --
294 -- ----------------------------------------------------------------------------
295 -- |---------------------------------< del >----------------------------------|
296 -- ----------------------------------------------------------------------------
297 Procedure del
298 (p_rec in pqp_shp_shd.g_rec_type
299 ) is
300 --
301 l_proc varchar2(72) := g_package||'del';
302 --
303 Begin
304 hr_utility.set_location('Entering:'||l_proc, 5);
305 --
306 -- We must lock the row which we need to delete.
307 --
308 pqp_shp_shd.lck
309 (p_rec.service_history_period_id
310 ,p_rec.object_version_number
311 );
312 --
313 -- Call the supporting delete validate operation
314 --
315 pqp_shp_bus.delete_validate(p_rec);
316 --
317 -- Call the supporting pre-delete operation
318 --
319 pqp_shp_del.pre_delete(p_rec);
320 --
321 -- Delete the row.
322 --
323 pqp_shp_del.delete_dml(p_rec);
324 --
325 -- Call the supporting post-delete operation
326 --
327 pqp_shp_del.post_delete(p_rec);
328 --
329 End del;
330 --
331 -- ----------------------------------------------------------------------------
332 -- |---------------------------------< del >----------------------------------|
333 -- ----------------------------------------------------------------------------
334 Procedure del
335 (p_service_history_period_id in number
336 ,p_object_version_number in number
337 ) is
338 --
339 l_rec pqp_shp_shd.g_rec_type;
340 l_proc varchar2(72) := g_package||'del';
341 --
342 Begin
343 hr_utility.set_location('Entering:'||l_proc, 5);
344 --
348 -- only need a few attributes.
345 -- As the delete procedure accepts a plsql record structure we do need to
346 -- convert the arguments into the record structure.
347 -- We don't need to call the supplied conversion argument routine as we
349 --
350 l_rec.service_history_period_id := p_service_history_period_id;
351 l_rec.object_version_number := p_object_version_number;
352 --
353 -- Having converted the arguments into the pqp_shp_rec
354 -- plsql record structure we must call the corresponding entity
355 -- business process
356 --
357 pqp_shp_del.del(l_rec);
358 --
359 hr_utility.set_location(' Leaving:'||l_proc, 10);
360 End del;
361 --
362 end pqp_shp_del;