Line: 22

PROCEDURE update_schedule
( p_project_id                    IN  NUMBER
 ,p_mass_update_flag              IN  VARCHAR2         := FND_API.G_FALSE
 ,p_exception_type_code           IN  VARCHAR2
 ,p_record_version_number         IN  NUMBER           := NULL
 ,p_assignment_id                 IN  NUMBER           := NULL
 ,p_assignment_id_array           IN  SYSTEM.PA_NUM_TBL_TYPE := NULL
 ,p_change_start_date             IN  DATE             := NULL
 ,p_change_end_date               IN  DATE             := NULL
 ,p_requirement_status_code       IN  VARCHAR2         := NULL
 ,p_assignment_status_code        IN  VARCHAR2         := NULL
 ,p_monday_hours                  IN  NUMBER           := NULL
 ,p_tuesday_hours                 IN  NUMBER           := NULL
 ,p_wednesday_hours               IN  NUMBER           := NULL
 ,p_thursday_hours                IN  NUMBER           := NULL
 ,p_friday_hours                  IN  NUMBER           := NULL
 ,p_saturday_hours                IN  NUMBER           := NULL
 ,p_sunday_hours                  IN  NUMBER           := NULL
 ,p_non_working_day_flag          IN  VARCHAR2         := 'N'
 ,p_change_hours_type_code        IN  VARCHAR2         := NULL
 ,p_hrs_per_day                   IN  NUMBER           := NULL
 ,p_calendar_percent              IN  NUMBER           := NULL
 ,p_change_calendar_type_code     IN  VARCHAR2         := NULL
 ,p_change_calendar_name          IN  VARCHAR2         := NULL
 ,p_change_calendar_id            IN  NUMBER           := NULL
 ,p_duration_shift_type_code      IN  VARCHAR2         := NULL
 ,p_duration_shift_unit_code      IN  VARCHAR2         := NULL
 ,p_number_of_shift               IN  NUMBER           := NULL
 ,p_last_row_flag                 IN  VARCHAR2         := 'Y'
 ,p_change_start_date_tbl         IN  SYSTEM.PA_DATE_TBL_TYPE := NULL
 ,p_change_end_date_tbl           IN  SYSTEM.PA_DATE_TBL_TYPE := NULL
 ,p_monday_hours_tbl              IN  SYSTEM.PA_NUM_TBL_TYPE  := NULL
 ,p_tuesday_hours_tbl             IN  SYSTEM.PA_NUM_TBL_TYPE  := NULL
 ,p_wednesday_hours_tbl           IN  SYSTEM.PA_NUM_TBL_TYPE  := NULL
 ,p_thursday_hours_tbl            IN  SYSTEM.PA_NUM_TBL_TYPE  := NULL
 ,p_friday_hours_tbl              IN  SYSTEM.PA_NUM_TBL_TYPE  := NULL
 ,p_saturday_hours_tbl            IN  SYSTEM.PA_NUM_TBL_TYPE  := NULL
 ,p_sunday_hours_tbl              IN  SYSTEM.PA_NUM_TBL_TYPE  := NULL
 ,p_commit                        IN  VARCHAR2         := FND_API.G_FALSE
 ,p_validate_only                 IN  VARCHAR2         := FND_API.G_TRUE
 ,x_return_status                 OUT NOCOPY VARCHAR2       --File.Sql.39 bug 4440895
 ,x_msg_count                     OUT NOCOPY NUMBER         --File.Sql.39 bug 4440895
 ,x_msg_data                      OUT NOCOPY VARCHAR2 ) --File.Sql.39 bug 4440895
IS

  l_err_msg_code             fnd_new_messages.message_name%TYPE;
Line: 68

  l_updated_calendar_id      NUMBER;
Line: 84

  PA_DEBUG.init_err_stack('PA_SCHEDULE_PUB.update_schedule');
Line: 88

    SAVEPOINT SCH_PUB_UPDATE_SCH;
Line: 143

        p_mass_update_flag = FND_API.G_TRUE) ) THEN
      PA_UTILS.Add_Message ('PA', 'PA_SCH_ASGN_STATUS_NULL');
Line: 266

  IF (p_mass_update_flag = FND_API.G_TRUE AND p_last_row_flag = 'Y') THEN
       --start the mass WF
       PA_MASS_ASGMT_TRX.Start_Mass_Asgmt_Trx_Wf(
          p_mode                        => PA_MASS_ASGMT_TRX.G_MASS_UPDATE_SCHEDULE
         ,p_action                      => PA_MASS_ASGMT_TRX.G_SAVE
         ,p_project_id                  => p_project_id
         ,p_exception_type_code         => p_exception_type_code
         ,p_assignment_id_tbl           => p_assignment_id_array
         ,p_change_start_date           => p_change_start_date
         ,p_change_end_date             => p_change_end_date
         ,p_change_rqmt_status_code     => p_requirement_status_code
         ,p_change_asgmt_status_code    => p_assignment_status_code
         ,p_change_start_date_tbl       => p_change_start_date_tbl
         ,p_change_end_date_tbl         => p_change_end_date_tbl
         ,p_monday_hours_tbl            => p_monday_hours_tbl
         ,p_tuesday_hours_tbl           => p_tuesday_hours_tbl
         ,p_wednesday_hours_tbl         => p_wednesday_hours_tbl
         ,p_thursday_hours_tbl          => p_thursday_hours_tbl
         ,p_friday_hours_tbl            => p_friday_hours_tbl
         ,p_saturday_hours_tbl          => p_saturday_hours_tbl
         ,p_sunday_hours_tbl            => p_sunday_hours_tbl
         ,p_non_working_day_flag        => p_non_working_day_flag
         ,p_change_hours_type_code      => p_change_hours_type_code
         ,p_hrs_per_day                 => p_hrs_per_day
         ,p_calendar_percent            => p_calendar_percent
         ,p_change_calendar_type_code   => p_change_calendar_type_code
         ,p_change_calendar_name        => p_change_calendar_name
         ,p_change_calendar_id          => p_change_calendar_id
         ,p_duration_shift_type_code    => p_duration_shift_type_code
         ,p_duration_shift_unit_code    => p_duration_shift_unit_code
         ,p_num_of_shift                => p_number_of_shift
         ,x_return_status               => l_x_return_status  );
Line: 307

  ELSIF (p_mass_update_flag = FND_API.G_FALSE) THEN
     -- call execute_update_schedule procedure for single schedule update.

     pa_schedule_utils.debug('pa.plsql.pa_schedule_pub', 'Calling single_update_schedule', 6);
Line: 311

     single_update_schedule (
			  p_project_id                 => p_project_id
       ,p_exception_type_code        => p_exception_type_code
			 ,p_record_version_number      => p_record_version_number
			 ,p_assignment_id              => p_assignment_id
			 ,p_change_start_date          => p_change_start_date
			 ,p_change_end_date            => p_change_end_date
			 ,p_assignment_status_code     => p_assignment_status_code
			 ,p_monday_hours               => p_monday_hours
			 ,p_tuesday_hours              => p_tuesday_hours
	 		 ,p_wednesday_hours            => p_wednesday_hours
	 		 ,p_thursday_hours             => p_thursday_hours
			 ,p_friday_hours               => p_friday_hours
			 ,p_saturday_hours             => p_saturday_hours
	 		 ,p_sunday_hours               => p_sunday_hours
			 ,p_non_working_day_flag       => p_non_working_day_flag
	 		 ,p_change_hours_type_code     => p_change_hours_type_code
	 		 ,p_hrs_per_day                => p_hrs_per_day
	 		 ,p_calendar_percent           => p_calendar_percent
			 ,p_change_calendar_type_code  => p_change_calendar_type_code
			 --,p_change_calendar_name       => p_change_calendar_name
			 ,p_change_calendar_id         => l_change_calendar_id
       ,p_duration_shift_type_code   => p_duration_shift_type_code
       ,p_duration_shift_unit_code   => p_duration_shift_unit_code
       ,p_number_of_shift            => p_number_of_shift
       ,p_last_row_flag              => p_last_row_flag
       ,p_init_msg_list              => FND_API.G_TRUE
       ,p_commit                     => FND_API.G_FALSE
			 ,x_return_status              => l_x_return_status
			 ,x_msg_count                  => l_msg_count
			 ,x_msg_data                   => l_msg_data);
Line: 382

           ROLLBACK TO SCH_PUB_UPDATE_SCH;
Line: 390

                                ,p_procedure_name => 'execute_update_schedule'
				,p_error_text	  => x_msg_data ); -- 4537865
Line: 398

END update_schedule;
Line: 412

PROCEDURE single_update_schedule
( p_project_id                    IN  NUMBER
 ,p_exception_type_code           IN  VARCHAR2
 ,p_record_version_number         IN  NUMBER           := NULL
 ,p_assignment_id                 IN  NUMBER           := NULL
 ,p_change_start_date             IN  DATE             := NULL
 ,p_change_end_date               IN  DATE             := NULL
 ,p_assignment_status_code        IN  VARCHAR2         := NULL
 ,p_monday_hours                  IN  NUMBER           := NULL
 ,p_tuesday_hours                 IN  NUMBER           := NULL
 ,p_wednesday_hours               IN  NUMBER           := NULL
 ,p_thursday_hours                IN  NUMBER           := NULL
 ,p_friday_hours                  IN  NUMBER           := NULL
 ,p_saturday_hours                IN  NUMBER           := NULL
 ,p_sunday_hours                  IN  NUMBER           := NULL
 ,p_non_working_day_flag          IN  VARCHAR2         := 'N'
 ,p_change_hours_type_code        IN  VARCHAR2         := NULL
 ,p_hrs_per_day                   IN  NUMBER           := NULL
 ,p_calendar_percent              IN  NUMBER           := NULL
 ,p_change_calendar_type_code     IN  VARCHAR2         := NULL
 --,p_change_calendar_name          IN  VARCHAR2         := NULL
 ,p_change_calendar_id            IN  NUMBER           := NULL
 ,p_duration_shift_type_code      IN  VARCHAR2         := NULL
 ,p_duration_shift_unit_code      IN  VARCHAR2         := NULL
 ,p_number_of_shift               IN  NUMBER           := NULL
 ,p_last_row_flag                 IN  VARCHAR2         := 'Y'
 ,p_init_msg_list                 IN  VARCHAR2         := FND_API.G_FALSE
 ,p_commit                        IN  VARCHAR2         := FND_API.G_FALSE
 ,x_return_status                 OUT NOCOPY VARCHAR2       --File.Sql.39 bug 4440895
 ,x_msg_count                     OUT NOCOPY NUMBER         --File.Sql.39 bug 4440895
 ,x_msg_data                      OUT NOCOPY VARCHAR2 ) --File.Sql.39 bug 4440895
IS

  l_err_msg_code             fnd_new_messages.message_name%TYPE;
Line: 446

  l_updated_calendar_id      NUMBER;
Line: 458

  	 SELECT assignment_type,
                status_code,
                calendar_id,
                start_date,
                end_date
	 FROM  pa_project_assignments
	 WHERE assignment_id = p_assignment_id;
Line: 476

  PA_DEBUG.init_err_stack('PA_SCHEDULE_PUB.single_update_schedule');
Line: 480

    SAVEPOINT SCH_PUB_SINGLE_UPDATE_SCH;
Line: 606

           ROLLBACK TO SCH_PUB_SINGLE_UPDATE_SCH;
Line: 614

                                ,p_procedure_name => 'single_update_schedule',
				p_error_text	  => x_msg_data  ); -- 4537865
Line: 622

END single_update_schedule;
Line: 634

PROCEDURE mass_update_schedule
( p_project_id                    IN  NUMBER
 ,p_exception_type_code           IN  VARCHAR2
 ,p_assignment_id_array           IN  SYSTEM.PA_NUM_TBL_TYPE
 ,p_change_start_date             IN  DATE             := NULL
 ,p_change_end_date               IN  DATE             := NULL
 ,p_change_rqmt_status_code       IN  VARCHAR2         := NULL
 ,p_change_asgmt_status_code      IN  VARCHAR2         := NULL
 ,p_change_start_date_tbl         IN  SYSTEM.PA_DATE_TBL_TYPE := NULL
 ,p_change_end_date_tbl           IN  SYSTEM.PA_DATE_TBL_TYPE := NULL
 ,p_monday_hours_tbl              IN  SYSTEM.PA_NUM_TBL_TYPE  := NULL
 ,p_tuesday_hours_tbl             IN  SYSTEM.PA_NUM_TBL_TYPE  := NULL
 ,p_wednesday_hours_tbl           IN  SYSTEM.PA_NUM_TBL_TYPE  := NULL
 ,p_thursday_hours_tbl            IN  SYSTEM.PA_NUM_TBL_TYPE  := NULL
 ,p_friday_hours_tbl              IN  SYSTEM.PA_NUM_TBL_TYPE  := NULL
 ,p_saturday_hours_tbl            IN  SYSTEM.PA_NUM_TBL_TYPE  := NULL
 ,p_sunday_hours_tbl              IN  SYSTEM.PA_NUM_TBL_TYPE  := NULL
 ,p_non_working_day_flag          IN  VARCHAR2         := 'N'
 ,p_change_hours_type_code        IN  VARCHAR2         := NULL
 ,p_hrs_per_day                   IN  NUMBER           := NULL
 ,p_calendar_percent              IN  NUMBER           := NULL
 ,p_change_calendar_type_code     IN  VARCHAR2         := NULL
 ,p_change_calendar_name          IN  VARCHAR2         := NULL
 ,p_change_calendar_id            IN  NUMBER           := NULL
 ,p_duration_shift_type_code      IN  VARCHAR2         := NULL
 ,p_duration_shift_unit_code      IN  VARCHAR2         := NULL
 ,p_number_of_shift               IN  NUMBER           := NULL
 ,p_init_msg_list                 IN  VARCHAR2         := FND_API.G_TRUE
 ,p_validate_only                 IN  VARCHAR2         := FND_API.G_TRUE
 ,p_commit                        IN  VARCHAR2         := FND_API.G_FALSE
 ,x_success_assignment_id_tbl     OUT NOCOPY SYSTEM.PA_NUM_TBL_TYPE /* Added NOCOPY for bug#2674619 */
 ,x_return_status                 OUT NOCOPY VARCHAR2       --File.Sql.39 bug 4440895
 ,x_msg_count                     OUT NOCOPY NUMBER         --File.Sql.39 bug 4440895
 ,x_msg_data                      OUT NOCOPY VARCHAR2 ) --File.Sql.39 bug 4440895
IS

  l_err_msg_code             fnd_new_messages.message_name%TYPE;
Line: 671

  l_updated_calendar_id      NUMBER;
Line: 689

  	 SELECT assignment_type,
                status_code,
                resource_id
	 FROM  pa_project_assignments
	 WHERE assignment_id = l_assignment_id;
Line: 706

  PA_DEBUG.init_err_stack('PA_SCHEDULE_PUB.mass_update_schedule');
Line: 721

          SAVEPOINT SCH_PUB_MASS_UPDATE_SCH;
Line: 770

                single_update_schedule (
        			    p_project_id                 => p_project_id
                 ,p_exception_type_code        => p_exception_type_code
				         ,p_record_version_number      => NULL
				         ,p_assignment_id              => p_assignment_id_array(i)
				         ,p_change_start_date          => p_change_start_date_tbl(j)
				         ,p_change_end_date            => p_change_end_date_tbl(j)
				         ,p_assignment_status_code     => l_change_asgmt_status_code
				         ,p_monday_hours               => p_monday_hours_tbl(j)
				         ,p_tuesday_hours              => p_tuesday_hours_tbl(j)
	 			         ,p_wednesday_hours            => p_wednesday_hours_tbl(j)
			 	         ,p_thursday_hours             => p_thursday_hours_tbl(j)
				         ,p_friday_hours               => p_friday_hours_tbl(j)
				         ,p_saturday_hours             => p_saturday_hours_tbl(j)
	 			         ,p_sunday_hours               => p_sunday_hours_tbl(j)
				         ,p_non_working_day_flag       => p_non_working_day_flag
	 			         ,p_change_hours_type_code     => p_change_hours_type_code
			 	         ,p_hrs_per_day                => p_hrs_per_day
				         ,p_calendar_percent           => p_calendar_percent
				         ,p_change_calendar_type_code  => p_change_calendar_type_code
				         --,p_change_calendar_name       => p_change_calendar_name
				         ,p_change_calendar_id         => p_change_calendar_id
		             ,p_duration_shift_type_code   => p_duration_shift_type_code
                 ,p_duration_shift_unit_code   => p_duration_shift_unit_code
                 ,p_number_of_shift            => p_number_of_shift
                 ,p_last_row_flag              => l_last_row_flag
                 ,p_init_msg_list              => FND_API.G_TRUE
		             ,p_commit                     => FND_API.G_FALSE
	               ,x_return_status              => l_x_return_status
				         ,x_msg_count                  => l_msg_count
				         ,x_msg_data                   => l_msg_data);
Line: 808

            single_update_schedule (
   			    p_project_id                 => p_project_id
           ,p_exception_type_code        => p_exception_type_code
				   ,p_record_version_number      => NULL
				   ,p_assignment_id              => p_assignment_id_array(i)
				   ,p_change_start_date          => p_change_start_date
				   ,p_change_end_date            => p_change_end_date
				   ,p_assignment_status_code     => l_change_asgmt_status_code
				   ,p_monday_hours               => NULL
				   ,p_tuesday_hours              => NULL
	 			   ,p_wednesday_hours            => NULL
			 	   ,p_thursday_hours             => NULL
				   ,p_friday_hours               => NULL
				   ,p_saturday_hours             => NULL
	 			   ,p_sunday_hours               => NULL
				   ,p_non_working_day_flag       => p_non_working_day_flag
	 			   ,p_change_hours_type_code     => p_change_hours_type_code
			 	   ,p_hrs_per_day                => p_hrs_per_day
	 			   ,p_calendar_percent           => p_calendar_percent
				   ,p_change_calendar_type_code  => p_change_calendar_type_code
				   --,p_change_calendar_name       => p_change_calendar_name
				   ,p_change_calendar_id         => p_change_calendar_id
		       ,p_duration_shift_type_code   => p_duration_shift_type_code
           ,p_duration_shift_unit_code   => p_duration_shift_unit_code
           ,p_number_of_shift            => p_number_of_shift
           ,p_last_row_flag              => l_last_row_flag
           ,p_init_msg_list              => FND_API.G_TRUE
		       ,p_commit                     => FND_API.G_FALSE
	         ,x_return_status              => l_x_return_status
				   ,x_msg_count                  => l_msg_count
				   ,x_msg_data                   => l_msg_data);
Line: 839

         END IF; -- end if for calling single_update_schedule
Line: 857

                    ROLLBACK TO SCH_PUB_MASS_UPDATE_SCH;
Line: 874

                                       p_source_type2       =>  PA_MASS_ASGMT_TRX.G_MASS_UPDATE_SCHEDULE,
                                       p_source_identifier1 =>  PA_MASS_ASGMT_TRX.G_WORKFLOW_ITEM_TYPE,
                                       p_source_identifier2 =>  PA_MASS_ASGMT_TRX.G_WORKFLOW_ITEM_KEY,
                                       p_context1           =>  p_project_id,
                                       p_context2           =>  p_assignment_id_array(i),
                                       p_context3           =>  NULL,
                                       p_commit             =>  FND_API.G_TRUE,
                                       x_return_status      =>  l_return_status);
Line: 889

                                       p_source_type2       =>  PA_MASS_ASGMT_TRX.G_MASS_UPDATE_SCHEDULE,
                                       p_source_identifier1 =>  PA_MASS_ASGMT_TRX.G_WORKFLOW_ITEM_TYPE,
                                       p_source_identifier2 =>  PA_MASS_ASGMT_TRX.G_WORKFLOW_ITEM_KEY,
                                       p_context1           =>  p_project_id,
                                       p_context2           =>  p_assignment_id_array(i),
                                       p_context3           =>  NULL,
                                       p_commit             =>  FND_API.G_TRUE,
                                       x_return_status      =>  l_return_status);
Line: 918

                                ,p_procedure_name => 'mass_update_schedule'
				,p_error_text	  => x_msg_data ); -- 4537865
Line: 925

END mass_update_schedule;
Line: 993

		 SELECT a.person_id, b.resource_id
			 FROM   pa_resource_txn_attributes a, pa_project_assignments b
			 WHERE  a.resource_id = b.resource_id
			 AND b.assignment_id = p_assignment_id;
Line: 1010

			 SELECT pps.project_status_name
				 FROM pa_projects_all ppa, pa_project_statuses pps
				 WHERE ppa.project_id = p_project_id
         AND   ppa.project_status_code = pps.project_status_code;
Line: 1126

	    	     SELECT project_status_name
	   	     INTO l_assignment_status_name
	   	     FROM pa_project_statuses
	  	     WHERE project_status_code = p_assignment_status_code;
Line: 1199

                           ,p_calling_mode => 'UPDATE'
                           ,p_project_id   => p_project_id
                           ,p_person_id    => l_resource_source_id
                           ,x_error_message_code => l_error_message_code
                           ,x_return_status => x_return_status);
Line: 1211

	 -- Insert row to PA_SCHEDULE_EXCEPTIONS
         --
 	 PA_SCHEDULE_UTILS.log_message(1,'Start of the change_duration API ..... ');
Line: 1214

	 PA_SCH_EXCEPT_PKG.Insert_Rows(
				p_calendar_id               => p_calendar_id
			       ,p_assignment_id             => p_assignment_id
			       ,p_project_id                => p_project_id
			       ,p_schedule_type_code        => p_assignment_type
			       ,p_assignment_status_code    => p_assignment_status_code
			       ,p_exception_type_code       => p_exception_type_code
			       ,p_start_date                => l_start_date
			       ,p_end_date                  => l_end_date
                     	       ,p_duration_shift_type_code  => p_duration_shift_type_code
			       ,p_duration_shift_unit_code  => p_duration_shift_unit_code
			       ,p_number_of_shift           => p_number_of_shift
			       ,x_exception_id              => l_exception_id
			       ,x_return_status             => l_x_return_status
			       ,x_msg_count                 => x_msg_count
			       ,x_msg_data                  => x_msg_data               );
Line: 1262

     PA_CANDIDATE_UTILS.Update_No_Of_Active_Candidates (
                            p_assignment_id => p_assignment_id,
                            x_return_status => l_x_return_status);
Line: 1536

	 PA_SCH_EXCEPT_PKG.Insert_Rows(
		 p_calendar_id              => p_calendar_id            ,
		 p_assignment_id            => p_assignment_id          ,
		 p_project_id               => p_project_id             ,
		 p_schedule_type_code       => p_assignment_type        ,
		 p_assignment_status_code   => p_assignment_status_code ,
		 p_exception_type_code      => 'CHANGE_HOURS'           ,
		 p_start_date               => p_start_date             ,
		 p_end_date                 => p_end_date               ,
		 p_resource_calendar_percent=> p_calendar_percent       ,
		 p_non_working_day_flag     => p_non_working_day_flag   ,
		 p_change_hours_type_code   => p_change_hours_type_code ,
                 p_change_calendar_type_code => p_change_calendar_type_code ,
                -- p_change_calendar_name     => p_change_calendar_name   ,
                 p_change_calendar_id       => p_change_calendar_id     ,
		 p_monday_hours             => p_hrs_per_day            ,
		 p_tuesday_hours            => p_hrs_per_day            ,
		 p_wednesday_hours          => p_hrs_per_day            ,
		 p_thursday_hours           => p_hrs_per_day            ,
		 p_friday_hours             => p_hrs_per_day            ,
		 p_saturday_hours           => p_hrs_per_day            ,
		 p_sunday_hours             => p_hrs_per_day            ,
		 x_exception_id             => l_t_exception_id         ,
		 x_return_status            => l_x_return_status        ,
		 x_msg_count                => x_msg_count              ,
		 x_msg_data                 => x_msg_data               );
Line: 1801

   pa_schedule_utils.debug('pa.plsql.pa_schedule_pub', 'Calling pa_sch_except_pkg.insert_rows', 6);
Line: 1803

	 PA_SCH_EXCEPT_PKG.Insert_Rows(
		 p_calendar_id              => p_calendar_id            ,
		 p_assignment_id            => p_assignment_id          ,
		 p_project_id               => p_project_id             ,
		 p_schedule_type_code       => p_assignment_type        ,
			 p_exception_type_code      => 'CHANGE_WORK_PATTERN'    ,
			 p_start_date               => p_start_date             ,
			 p_end_date                 => p_end_date               ,
			 p_monday_hours             => l_p_monday_hours         ,
			 p_tuesday_hours            => l_p_tuesday_hours        ,
			 p_wednesday_hours          => l_p_wednesday_hours      ,
			 p_thursday_hours           => l_p_thursday_hours       ,
			 p_friday_hours             => l_p_friday_hours         ,
			 p_saturday_hours           => l_p_saturday_hours       ,
			 p_sunday_hours             => l_p_sunday_hours         ,
			 x_exception_id             => l_t_exception_id         ,
			 x_return_status            => l_x_return_status        ,
			 x_msg_count                => x_msg_count              ,
			 x_msg_data                 => x_msg_data               );
Line: 1960

			 SELECT pps.project_status_name
				 FROM pa_projects_all ppa, pa_project_statuses pps
				 WHERE ppa.project_id = p_project_id
         AND   ppa.project_status_code = pps.project_status_code;
Line: 2012

	  			SELECT project_status_name
						INTO l_assignment_status_name
						FROM pa_project_statuses
						WHERE project_status_code = p_assignment_status_code;
Line: 2063

	 PA_SCH_EXCEPT_PKG.Insert_Rows(
		 p_calendar_id              => p_calendar_id            ,
		 p_assignment_id            => p_assignment_id          ,
		 p_project_id               => p_project_id             ,
		 p_schedule_type_code       => p_assignment_type        ,
			 p_assignment_status_code   => p_assignment_status_code ,
				 p_exception_type_code      => 'CHANGE_STATUS'          ,
				 p_start_date               => p_start_date             ,
				 p_end_date                 => p_end_date               ,
				 x_exception_id             => l_exception_id         ,
				 x_return_status            => l_x_return_status        ,
				 x_msg_count                => x_msg_count              ,
				 x_msg_data                 => x_msg_data               );
Line: 2276

	 -- If the user select  calendar name only then taking the calendar id
	 IF (p_calendar_id IS NULL ) THEN
BEGIN
				 SELECT calendar_id
					 INTO l_calendar_id
					 FROM jtf_calendars_vl
					 WHERE calendar_name = p_calendar_name;
Line: 2308

	 PA_SCH_EXCEPT_PKG.Insert_Rows(
		 p_calendar_id              => l_calendar_id            ,
		 p_assignment_id            => p_assignment_id          ,
		 p_project_id               => p_project_id             ,
		 p_schedule_type_code       => p_assignment_type        ,
		 p_exception_type_code      => 'CHANGE_CALENDAR'        ,
		 p_start_date               => p_start_date             ,
		 p_end_date                 => p_end_date               ,
		 x_exception_id             => l_t_exception_id           ,
		 x_return_status            => l_x_return_status          ,
		 x_msg_count                => x_msg_count              ,
		 x_msg_data                 => x_msg_data               );
Line: 2414

	 -- This cursor will select the distinct assignment id
	 CURSOR csr_sch_excp IS
		 SELECT distinct a.assignment_id, b.record_version_number, b.project_id
			 FROM pa_schedule_exceptions a , pa_project_assignments b
			 WHERE a.assignment_id = b.assignment_id
			 ORDER by a.assignment_id;
Line: 2524

		 SELECT calendar_id,
			 schedule_exception_id,
			 assignment_id,
			 project_id,
			 status_code,
			 schedule_type_code,
			 exception_type_code,
			 resource_calendar_percent,
			 non_working_day_flag,
			 change_hours_type_code,
                         change_calendar_type_code,
                        -- change_calendar_name,
 			 change_calendar_id,
 		         duration_shift_type_code,
                         duration_shift_unit_code,
                         number_of_shift,
			 start_date,
			 end_date,
			 Monday_hours,
			 Tuesday_hours,
			 Wednesday_hours,
			 Thursday_hours,
			 Friday_hours,
			 saturday_hours,
			 Sunday_hours
			 FROM   pa_schedule_exceptions
			 WHERE  assignment_id = p_assignment_id
			 AND    ((p_exception_id   IS NULL)  OR
			 (schedule_exception_id = p_exception_id))
			 ORDER BY schedule_exception_id;
Line: 2600

			   pa_assignment_approval_pvt.update_approval_status(
				   p_assignment_id => p_assignment_id,
				   p_action_code => PA_ASSIGNMENT_APPROVAL_PUB.g_update_action,
				   p_record_version_number => p_record_version_number,
				   x_record_version_number => l_record_version_number,
				   x_change_id => l_change_id,
				   x_apprvl_status_code => l_temp_status_code,
				   x_return_status => l_x_return_status,
				   x_msg_count => x_msg_count,
				   x_msg_data => x_msg_data);
Line: 2690

				 l_tr_sch_rec_tab.delete;
Line: 2749

				 -- seperating the deleted or non deleted record i.e inserted or updated
				 PA_SCHEDULE_UTILS.sep_del_sch_rec_tab(l_out_tr_sch_rec_tab,
					 l_del_tr_sch_rec_tab,
					 l_chg_tr_sch_rec_tab,
					 l_x_return_status,
					 x_msg_count,
					 x_msg_data
																							);
Line: 2761

			PA_SCHEDULE_UTILS.log_message(1,'after delete seperate (change ) : ',l_chg_tr_sch_rec_tab );
Line: 2762

			PA_SCHEDULE_UTILS.log_message(1,'after delete seperate (delete ) : ',l_del_tr_sch_rec_tab );
Line: 2767

	 PA_SCHEDULE_UTILS.log_message(1,'FINAL (delete ) : ',l_del_tr_sch_rec_tab );
Line: 2788

                    select start_date, end_date, resource_id, record_version_number -- Unilog Selected record_version_number too
                    into l_old_start_date, l_old_end_date, l_resource_id, l_record_version_number_wo_chg
                    from pa_project_assignments
                    where assignment_id = p_assignment_id;
Line: 2811

			PA_SCHEDULE_UTILS.log_message(1, 'Before Calling the API delete_rows ....');
Line: 2815

				 PA_SCH_EXCEPT_PKG.delete_rows(l_sch_except_record_tab,
					 l_x_return_status,
					 x_msg_count,
					 x_msg_data
																			);
Line: 2822

			PA_SCHEDULE_UTILS.log_message(1, 'After Calling the API delete_rows ..');
Line: 2824

			-- inserting  the rows from schedule except history table
			IF (l_x_return_status = FND_API.G_RET_STS_SUCCESS ) THEN
				 IF (FND_API.TO_BOOLEAN(NVL(l_save_to_hist,FND_API.G_TRUE))) THEN
						PA_SCH_EXCEPT_HIST_PKG.insert_rows(
							l_sch_except_record_tab,
							l_change_id,
							l_x_return_status,
							x_msg_count,
							x_msg_data
																							);
Line: 2837

			PA_SCHEDULE_UTILS.log_message(1, 'After Calling the API insert_rows ....');
Line: 2977

			--  Inserting the records in PA_SCHEDULES table
			PA_SCHEDULE_PKG.insert_rows(l_x_sch_record_tab,l_x_return_status,x_msg_count,x_msg_data);
Line: 2981

         /** Added call to update_wp_calendar for all projects **/
    -- Start Of Bug No :4666318
    --Commented for Bug No:4666318
    -- This functionality was originally introduced in FP.K .But It was removed in FP.M.
   /*   PA_PROJECT_STRUCTURE_PVT1.update_all_wp_calendar
                                    (     p_calendar_id      => p_calendar_id
                                         ,x_return_status    => x_return_status
                                         ,x_msg_count        => x_msg_count
                                         ,x_msg_data         => x_msg_data
                                     );*/
Line: 3077

				 SELECT carrying_out_organization_id
					 INTO l_t_carrying_out_org_id
					 FROM PA_PROJECTS_ALL
					 WHERE project_id = p_project_id;
Line: 3092

			PA_SCHEDULE_UTILS.log_message(1,'before select on hr_org.... ');
Line: 3099

			--SELECT TO_NUMBER(hr1.org_information2) ,
			SELECT TO_NUMBER(hr1.org_information1) ,
			       cal1.calendar_name
			INTO   x_calendar_id ,
			       x_calendar_name
			FROM   hr_organization_information hr1,
			       jtf_calendars_vl cal1
	--WHERE cal1.calendar_id = TO_NUMBER(hr1.org_information2) BUG 3530529
		-- WHERE TO_CHAR(cal1.calendar_id)  = hr1.org_information2
			WHERE TO_CHAR(cal1.calendar_id)  = hr1.org_information1
			AND   hr1.organization_id  = l_t_carrying_out_org_id
		--AND hr1.org_information_context = 'Exp Organization Defaults';
Line: 3113

			PA_SCHEDULE_UTILS.log_message(1,'after select on hr_org.... ');
Line: 3116

				PA_SCHEDULE_UTILS.log_message(1,'inside no data found for  select on hr_org.... ');
Line: 3119

				PA_SCHEDULE_UTILS.log_message(1,'ERROR while excuting select on hr_org.... '||sqlerrm);
Line: 3139

					 SELECT
						 calendar_name
							 INTO  x_calendar_name
							 FROM  jtf_calendars_vl
							 WHERE calendar_id = TO_NUMBER(l_temp_calendar_id);
Line: 3152

						 PA_SCHEDULE_UTILS.log_message(1,'ERROR while excuting select on jtf_calendars_vl.... '||sqlerrm);
Line: 3253

	 -- This cursor will select only those records which are matching in the start and end calendar name
	 -- or coming between them
	 CURSOR C1 IS SELECT calendar_id,calendar_name
		 FROM JTF_CALENDARS_VL
		 WHERE calendar_name BETWEEN l_t_start_calendar_name AND l_t_end_calendar_name;
Line: 3281

			SELECT MIN(calendar_name)
				INTO l_t_start_calendar_name
				FROM JTF_CALENDARS_VL;
Line: 3291

			SELECT MAX(calendar_name)
				INTO l_t_end_calendar_name
				FROM JTF_CALENDARS_VL;
Line: 3303

			SELECT 1
				INTO l_I
				FROM JTF_CALENDARS_B
				WHERE calendar_id=v_c1.calendar_id
				FOR UPDATE ;
Line: 3310

			DELETE FROM PA_SCHEDULES
				WHERE calendar_id = v_c1.calendar_id
				AND schedule_type_code = 'CALENDAR';
Line: 3334

			-- Inserting the calendars in session level temp table to pupulate the report
			INSERT INTO PA_CAL_GEN_STATUS_TEMP(calendar_id,calendar_name,generate_status_flag,message_code)
				VALUES(v_c1.calendar_id,v_c1.calendar_name,l_flag,l_code);
Line: 3473

  l_update_work_zero_start_date		DATE;
Line: 3474

  l_update_work_zero_end_date		DATE;
Line: 3559

	-- l_update_work_zero_start_date : Start date for the Gap created in the assignment
	-- l_update_work_zero_end_date : End date for the Gap created in the assignment
	-- x_call_timeline_st_date : The start date from which timeline	should be regenerated.
	-- x_call_timeline_end_date : The end date till	which timeline should be regenerated.

	IF ((p_start_date BETWEEN p_asgn_start_date AND	p_asgn_end_date) AND (p_end_date BETWEEN p_asgn_start_date AND p_asgn_end_date)) THEN
		-- Changes are Within Assignment Date Range
		PA_SCHEDULE_UTILS.log_message(1,'Changes are Within Assignment Date Range');
Line: 3629

		l_update_work_zero_start_date := l_actual_end_date+1;
Line: 3630

		l_update_work_zero_end_date := p_asgn_start_date-1;
Line: 3634

		IF  l_update_work_zero_end_date	>= l_update_work_zero_start_date THEN
			l_call_cng_work_patt_out_range := true;
Line: 3637

			x_call_timeline_end_date := l_update_work_zero_end_date;
Line: 3642

		-- l_update_work_zero_start_date is 15-Oct-2003	and l_update_work_zero_end_date	is 19-Oct-2003
		-- for which change_work_pattern should	be called with all 0 hours in monday to	sunday
		-- x_call_timeline_st_date, and	x_call_timeline_end_date for which forecast should be regenerated

		-- Example 2 Results : l_new_assgn_start_date is 04-Oct-2003 and l_new_assgn_end_date is 10-Nov-2003
		-- So now new assignment date is 04-Oct-2003 to	10-Nov-2003 for	which change_duration should be	called.
		-- l_update_work_zero_start_date is 15-Oct-2003	and l_update_work_zero_end_date	is 14-Oct-2003
		-- so change_work_pattern should not be	called with all	0 hours	in monday to sunday. Hence
		-- l_call_cng_work_patt_out_range will remain false
		-- x_call_timeline_st_date, and	x_call_timeline_end_date for which forecast should be regenerated

		/*  Commented and moved above for Bug 4183479
		FOR i IN (l_actual_start_date-p_start_date+1) .. p_hours_table.LAST LOOP
			IF p_hours_table(i) IS NULL THEN
				l_hours_table(i-(l_actual_start_date-p_start_date+1)+1) := 0; -- Bug 3234786 : To make sure that it starts from 1
Line: 3712

		l_update_work_zero_start_date := p_asgn_end_date+1;
Line: 3713

		l_update_work_zero_end_date := l_actual_start_date-1;
Line: 3717

		IF  l_update_work_zero_end_date	>= l_update_work_zero_start_date THEN
			l_call_cng_work_patt_out_range := true;
Line: 3719

			x_call_timeline_st_date	:= l_update_work_zero_start_date;
Line: 3725

		-- l_update_work_zero_start_date is 11-Nov-2003	and l_update_work_zero_end_date	is 14-Nov-2003
		-- for which change_work_pattern should	be called with all 0 hours in monday to	sunday

		-- Example 2 Results : l_new_assgn_start_date is 20-Oct-2003 and l_new_assgn_end_date is 25-Nov-2003
		-- So now new assignment date is 04-Oct-2003 to	10-Nov-2003 for	which change_duration should be	called.
		-- l_update_work_zero_start_date is 15-Nov-2003	and l_update_work_zero_end_date	is 14-Nov-2003
		-- so change_work_pattern should not be	called with all	0 hours	in monday to sunday. Hence
		-- l_call_cng_work_patt_out_range will remain false

		/*  Commented and moved above for Bug 4183479
		FOR i IN p_hours_table.FIRST ..	(l_actual_end_date-p_start_date+1) LOOP
			IF p_hours_table(i) IS NULL THEN
				l_hours_table(i) := 0;
Line: 3906

	PA_SCHEDULE_UTILS.log_message(1,'l_update_work_zero_start_date='||l_update_work_zero_start_date);
Line: 3907

	PA_SCHEDULE_UTILS.log_message(1,'l_update_work_zero_end_date='||l_update_work_zero_end_date);
Line: 3965

					 p_start_date		 => l_update_work_zero_start_date	,
					 p_end_date		 => l_update_work_zero_end_date		,
					 p_monday_hours		 => 0					,
					 p_tuesday_hours	 => 0					,
					 p_wednesday_hours	 => 0					,
					 p_thursday_hours	 => 0					,
					 p_friday_hours		 => 0					,
					 p_saturday_hours	 => 0					,
					 p_sunday_hours		 => 0					,
					 p_asgn_start_date	 => l_new_assgn_start_date		,
					 p_asgn_end_date	 => l_new_assgn_end_date		,
					 p_init_msg_list	 => FND_API.G_FALSE			,
					 p_last_row_flag	 => 'Y'					, --Changed 'N' to 'Y' for Bug 4165970.
					 p_generate_timeline_flag => 'N'				,
					 x_return_status	 => x_return_status			,
					 x_msg_count		 => x_msg_count				,
					 x_msg_data		 => x_msg_data)				;
Line: 4028

		  select decode(l_global_week_start_day,1,1,2,0,3,6,4,5,5,4,6,3,7,2,0) into l_days_to_inc from dual;
Line: 4384

					 p_start_date		 => l_update_work_zero_start_date	,
					 p_end_date		 => l_update_work_zero_end_date		,
					 p_monday_hours		 => 0					,
					 p_tuesday_hours	 => 0					,
					 p_wednesday_hours	 => 0					,
					 p_thursday_hours	 => 0					,
					 p_friday_hours		 => 0					,
					 p_saturday_hours	 => 0					,
					 p_sunday_hours		 => 0					,
					 p_asgn_start_date	 => l_new_assgn_start_date		,
					 p_asgn_end_date	 => l_new_assgn_end_date		,
					 p_init_msg_list	 => FND_API.G_FALSE			,
					 p_last_row_flag	 => 'N'					,
					 p_generate_timeline_flag => 'N'				,
					 x_return_status	 => x_return_status			,
					 x_msg_count		 => x_msg_count				,
					 x_msg_data		 => x_msg_data)				;
Line: 4489

		-- assignment_effort also has to be updated.
		-- For performance we can call create_forecast_item, but we need to add/subtract
		-- the extra effort. This can be done later.

		IF ((l_call_change_work_pattern	= true)	OR(l_call_change_duration = true)) THEN
			PA_TIMELINE_PVT.Create_Timeline(
				p_assignment_id	=> p_assignment_id	,
				x_return_status	=> x_return_status	,
				x_msg_count	=> x_msg_count		,
				x_msg_data	=> x_msg_data)		;
Line: 4613

	    p_delete_flag	     IN	VARCHAR2 := 'Y'		,
	    x_show_start_date	     OUT NOCOPY DATE			, --File.Sql.39 bug 4440895
	    x_return_status	     OUT NOCOPY VARCHAR2		, --File.Sql.39 bug 4440895
	    x_msg_count		     OUT NOCOPY NUMBER			, --File.Sql.39 bug 4440895
	    x_msg_data		     OUT NOCOPY VARCHAR2) --File.Sql.39 bug 4440895
AS

l_work_pattern_table		WORK_PATTERN_TAB_TYPE;
Line: 4639

SELECT
	project_id,
	project_name,
	assignment_name,
	start_date,
	end_date,
	status_name,
	assignment_id,
	resource_id,
	status_code,
	record_version_number,
	assignment_type,
	calendar_id,
	calendar_type,
	project_role_name,
	apprvl_status_name,
	assignment_effort,
	assignment_duration,
	project_system_status_code,
	--decode(decode(assignment_type, 'STAFFED_ASSIGNMENT', pa_security_pvt.check_user_privilege
	--('PA_ASN_SCHEDULE_ED', 'PA_PROJECTS', project_id), 'STAFFED_ADMIN_ASSIGNMENT',
	-- pa_security_pvt.check_user_privilege('PA_ADM_ASN_SCHEDULE_ED', 'PA_PROJECTS',project_id)),'Y',1,0) read_only_flag
--	1 read_only_flag -- Here we are	selecting read_only_flag as 0, actual value will be poulated Java side bcoz it does caching
	DECODE(mass_wf_in_progress_flag, 'Y', 1,
	       DECODE(pending_approval_flag, 'Y', 1,
	               DECODE(apprvl_status_code, 'ASGMT_APPRVL_CANCELED', 1, -- Bug 3235731
		               DECODE(status_code, null, 0, -- 3235675 This is needed as  is_asgmt_allow_stus_ctl_check returns N if status_code is null
		                    DECODE(pa_assignment_utils.is_asgmt_allow_stus_ctl_check(status_code, project_id, 'N'), 'N', 1, 0))))) read_only_flag
FROM pa_project_assignments_v asgn
WHERE asgn.resource_id = l_res_id
AND (
	  ((p_assgn_range_start_date IS	NOT NULL AND p_assgn_range_end_date IS NOT NULL)
	     AND
	    (((asgn.start_date between p_assgn_range_start_date	AND p_assgn_range_end_date)OR(asgn.end_date between p_assgn_range_start_date AND p_assgn_range_end_date))
	      OR
	     ((p_assgn_range_start_date	between	asgn.start_date	AND asgn.end_date)OR(p_assgn_range_end_date between asgn.start_date AND	asgn.end_date))
	    )
	   )
	   OR -- Get all assignments excpet those who are end dated before p_assgn_range_start_date
	   ( p_assgn_range_start_date IS NOT NULL AND p_assgn_range_end_date IS	NULL AND asgn.end_date >= p_assgn_range_start_date
	   )
	   OR -- Get all assignments excpet those who are started after	p_assgn_range_end_date
	   ( p_assgn_range_start_date IS NULL AND p_assgn_range_end_date IS NOT	NULL AND asgn.start_date <= p_assgn_range_end_date
	   )
     )
--AND asgn.status_code=nvl(p_status_code, asgn.status_code) 3235675 This is not needed, Also this is incorrect if status_code is null
AND 'STAFFED_ASGMT_CANCEL' <> nvl(project_system_status_code, 'XYZ') -- Bug 3235731
ORDER BY resource_id, assignment_id; --	This is	very important.	Logic is woven depending on this order
Line: 4693

SELECT
	item_date,
	capacity_quantity quantity,
	--capacity_quantity-(decode(availability_flag,
	--  'Y', decode(sign(capacity_quantity-availability_quantity), 1, 0, availability_quantity),
	--  'N', decode(sign(capacity_quantity-overcommitment_quantity), 1, 0, overcommitment_quantity))) quantity,
	resource_id,
	forecast_item_type,
	-1 assignment_id
FROM pa_forecast_items
WHERE resource_id = l_res_id
AND forecast_item_type = 'U'
AND item_date between l_actual_display_start_date and l_actual_display_start_date+14
AND delete_flag	= 'N'
UNION ALL
SELECT
	fi.item_date,
	fi.item_quantity quantity,
	fi.resource_id,
	fi.forecast_item_type,
	asgn.assignment_id
FROM pa_project_assignments asgn,
     pa_forecast_items fi
WHERE asgn.resource_id = l_res_id
AND fi.resource_id = l_res_id
AND fi.delete_flag = 'N'
AND fi.item_date between l_actual_display_start_date and l_actual_display_start_date+13
AND fi.forecast_item_type = 'A'
AND fi.assignment_id  =	 asgn.assignment_id
AND (
	  ((p_assgn_range_start_date IS	NOT NULL AND p_assgn_range_end_date IS NOT NULL)
	     AND
	    (((asgn.start_date between p_assgn_range_start_date	AND p_assgn_range_end_date)OR(asgn.end_date between p_assgn_range_start_date AND p_assgn_range_end_date))
	      OR
	     ((p_assgn_range_start_date	between	asgn.start_date	AND asgn.end_date)OR(p_assgn_range_end_date between asgn.start_date AND	asgn.end_date))
	    )
	   )
	   OR -- Get all assignments excpet those who are end dated before p_assgn_range_start_date
	   ( p_assgn_range_start_date IS NOT NULL AND p_assgn_range_end_date IS	NULL AND asgn.end_date >= p_assgn_range_start_date
	   )
	   OR -- Get all assignments excpet those who are started after	p_assgn_range_end_date
	   ( p_assgn_range_start_date IS NULL AND p_assgn_range_end_date IS NOT	NULL AND asgn.start_date <= p_assgn_range_end_date
	   )
     )
--AND asgn.status_code=nvl(p_status_code, asgn.status_code) 3235675 This is not needed, Also this is incorrect if status_code is null
ORDER BY resource_id, assignment_id, item_date,	forecast_item_type desc;
Line: 4748

	PA_SCHEDULE_UTILS.log_message(1,'p_delete_flag='||p_delete_flag);
Line: 4758

	Select (to_number(to_char((to_date('01-01-1950','dd-mm-yyyy')+(l_global_week_start_day - 1)),'D')))
        into l_global_week_start_day_new
        from dual;
Line: 4767

		SELECT next_day(p_display_start_date,decode(l_global_week_start_day,1,'SUNDAY',2,'MONDAY',3,'TUESDAY',4,'WEDNESDAY',5,'THURSDAY',6,'FRIDAY',7,'SATURDAY'))-7
			INTO l_actual_display_start_date
		FROM dual;*/
Line: 4771

         SELECT to_char(p_display_start_date,'D') INTO l_display_start_day FROM dual;
Line: 4795

	IF p_delete_flag = 'Y' then
		DELETE FROM pa_work_pattern_temp_table;
Line: 4823

		SELECT meaning into l_capacity_label from pa_lookups where lookup_type='PA_CAPC_AVL_LABELS' and	lookup_code ='CAPACITY';
Line: 4824

		SELECT meaning into l_availability_label from pa_lookups where lookup_type='PA_CAPC_AVL_LABELS'	and lookup_code	='AVAILABILITY';
Line: 4903

        SELECT MOD(l_where_to_place_counter,10)
        INTO l_counter_mod
        FROM dual;
Line: 5220

	PA_SCHEDULE_UTILS.log_message(1,'Inserting data	in pa_work_pattern_temp_table');
Line: 5223

	  INSERT INTO pa_work_pattern_temp_table
	  (
		  PROJECT_ID ,
		  PROJECT_NAME,
		  ASSIGNMENT_NAME,
		  START_DATE,
		  END_DATE,
		  STATUS_NAME,
		  ASSIGNMENT_ID,
		  RESOURCE_ID,
		  STATUS_CODE,
		  RECORD_VERSION_NUMBER,
		  ASSIGNMENT_TYPE,
		  CALENDAR_ID,
		  CALENDAR_TYPE,
		  PROJECT_ROLE_NAME,
		  APPRVL_STATUS_NAME,
		  ASSIGNMENT_EFFORT,
		  ASSIGNMENT_DURATION,
		  PROJECT_SYSTEM_STATUS_CODE,
		  DAY1,
		  DAY2,
		  DAY3,
		  DAY4,
		  DAY5,
		  DAY6,
		  DAY7,
		  DAY8,
		  DAY9,
		  DAY10,
		  DAY11,
		  DAY12,
		  DAY13,
		  DAY14,
		  QTY1,
		  QTY2,
		  QTY3,
		  QTY4,
		  QTY5,
		  QTY6,
		  QTY7,
		  QTY8,
		  QTY9,
		  QTY10,
		  QTY11,
		  QTY12,
		  QTY13,
		  QTY14,
		  row_type_code,
		  read_only_flag)
		values
		(
		  l_work_pattern_table(j).l_PROJECT_ID ,
		  l_work_pattern_table(j).l_PROJECT_NAME,
		  l_work_pattern_table(j).l_ASSIGNMENT_NAME,
		  l_work_pattern_table(j).l_START_DATE,
		  l_work_pattern_table(j).l_END_DATE,
		  l_work_pattern_table(j).l_STATUS_NAME,
		  l_work_pattern_table(j).l_ASSIGNMENT_ID,
		  l_work_pattern_table(j).l_RESOURCE_ID,
		  l_work_pattern_table(j).l_STATUS_CODE,
		  l_work_pattern_table(j).l_RECORD_VERSION_NUMBER,
		  l_work_pattern_table(j).l_ASSIGNMENT_TYPE,
		  l_work_pattern_table(j).l_CALENDAR_ID,
		  l_work_pattern_table(j).l_CALENDAR_TYPE,
		  l_work_pattern_table(j).l_PROJECT_ROLE_NAME,
		  l_work_pattern_table(j).l_APPRVL_STATUS_NAME,
		  l_work_pattern_table(j).l_ASSIGNMENT_EFFORT,
		  l_work_pattern_table(j).l_ASSIGNMENT_DURATION,
		  l_work_pattern_table(j).l_PROJECT_SYSTEM_STATUS_CODE,
		  l_work_pattern_table(j).l_DAY1,
		  l_work_pattern_table(j).l_DAY2,
		  l_work_pattern_table(j).l_DAY3,
		  l_work_pattern_table(j).l_DAY4,
		  l_work_pattern_table(j).l_DAY5,
		  l_work_pattern_table(j).l_DAY6,
		  l_work_pattern_table(j).l_DAY7,
		  l_work_pattern_table(j).l_DAY8,
		  l_work_pattern_table(j).l_DAY9,
		  l_work_pattern_table(j).l_DAY10,
		  l_work_pattern_table(j).l_DAY11,
		  l_work_pattern_table(j).l_DAY12,
		  l_work_pattern_table(j).l_DAY13,
		  l_work_pattern_table(j).l_DAY14,
		  l_work_pattern_table(j).l_QTY1,
		  l_work_pattern_table(j).l_QTY2,
		  l_work_pattern_table(j).l_QTY3,
		  l_work_pattern_table(j).l_QTY4,
		  l_work_pattern_table(j).l_QTY5,
		  l_work_pattern_table(j).l_QTY6,
		  l_work_pattern_table(j).l_QTY7,
		  l_work_pattern_table(j).l_QTY8,
		  l_work_pattern_table(j).l_QTY9,
		  l_work_pattern_table(j).l_QTY10,
		  l_work_pattern_table(j).l_QTY11,
		  l_work_pattern_table(j).l_QTY12,
		  l_work_pattern_table(j).l_QTY13,
		  l_work_pattern_table(j).l_QTY14,
		  l_work_pattern_table(j).l_row_type_code,
		  l_work_pattern_table(j).l_read_only_flag)   ;