PACKAGE BODY: APPS.GME_RESCHEDULE_STEP_PVT

Source


1 PACKAGE BODY gme_reschedule_step_pvt AS
2    /* $Header: GMEVRSSB.pls 120.9.12000000.3 2007/03/12 20:58:40 pxkumar ship $ */
3    g_debug               VARCHAR2 (5)  := fnd_profile.VALUE ('AFLOG_LEVEL');
4    g_pkg_name   CONSTANT VARCHAR2 (30) := 'GME_RESCHEDULE_STEP_PVT';
5 
6 /*================================================================================
7         Procedure
8         Reschedule Step
9         Description
10         This particular procedure call reschedules the batch steps.
11         Parameters
12         p_batch_step_rec        The batch step row to identify the step.
13         p_reschedule_preceding  Whether to reschedule preceding dependent steps
14         p_reschedule_succeeding Whether to reschedule succeeding dependent steps
15         p_source_step_id        Since this is recursive procedure, we need to know,
16                                 Where it is coming from.  So this really is a table
17                                 which holds all the steps rescheduled so far.
18         p_use_workday_cal       Whether to use workday calendar or not.
19                                 T - Use it
20                                 F - Do not use it
21         p_contiguity_override   Whether to override contiguity check and reschedule
22                                 step anyway.
23                                 T - Override it
24                                 F - DO not override it.
25         x_batch_step_rec        The batch step returned.
26         x_return_status         outcome of the API call
27                                 S - Success
28                                 E - Error
29                                 U - Unexpected error
30         HISTORY
31  ================================================================================*/
32    PROCEDURE reschedule_step (
33       p_batch_step_rec          IN              gme_batch_steps%ROWTYPE
34      ,p_source_step_id_tbl      IN              step_tab
35      ,p_contiguity_override     IN              VARCHAR2
36      ,p_reschedule_preceding    IN              VARCHAR2
37      ,p_reschedule_succeeding   IN              VARCHAR2
38      ,p_use_workday_cal         IN              VARCHAR2
39      ,x_batch_step_rec          OUT NOCOPY      gme_batch_steps%ROWTYPE
40      ,x_return_status           OUT NOCOPY      VARCHAR2)
41    IS
42       /* Buffers for database reads/writes */
43       l_api_name          CONSTANT VARCHAR2 (30)         := 'RESCHEDULE_STEP';
44       l_batch_header_rec           gme_batch_header%ROWTYPE;
45       l_batch_header2_rec          gme_batch_header%ROWTYPE;
46       l_batch_step_rec             gme_batch_steps%ROWTYPE;
47       l_batch_step_m_rec           gme_batch_steps%ROWTYPE;
48       l_material_detail_id_tbl     gme_common_pvt.number_tab;
49       l_rel_type                   NUMBER;
50       l_contig_period_tbl          gmp_calendar_api.contig_period_tbl;
51       l_loop_count_get_material    NUMBER;
52       --Bug#5606089
53       l_batch_step2_rec            gme_batch_steps%ROWTYPE;
54       x_batch_step2_rec            gme_batch_steps%ROWTYPE;
55       TYPE l_line_type_tbl_typ IS TABLE OF gme_material_details.line_type%TYPE
56          INDEX BY BINARY_INTEGER;
57 
58       l_line_type_tbl              l_line_type_tbl_typ;
59       l_material_date              DATE;
60       /* Exception definitions */
61       batch_step_fetch_error       EXCEPTION;
62       no_dates_passed              EXCEPTION;
63       no_date_change               EXCEPTION;
64       invalid_step_status          EXCEPTION;
65       batch_header_fetch_error     EXCEPTION;
66       save_data_error              EXCEPTION;
67       child_step_resch_error       EXCEPTION;
68       parent_step_resch_error      EXCEPTION;
69       prev_step_err                EXCEPTION;
70       mtl_dt_chg_error             EXCEPTION;
71       date_overlap_error           EXCEPTION;
72       trun_date_error              EXCEPTION;
73       cal_dates_error              EXCEPTION;
74       step_start_date_low          EXCEPTION;
75       error_cont_period            EXCEPTION;
76       error_non_contiguious        EXCEPTION;
77       date_exceed_validity_rule    EXCEPTION;
78       invalid_schedule_status      EXCEPTION;
79       clear_chg_dates_error        EXCEPTION;
80       /* Local variables */
81       l_return_status              VARCHAR2 (1);
82       l_max_end_date               DATE;
83       l_min_start_date             DATE;
84       l_change                     BOOLEAN                           := FALSE;
85       l_doc_type                   VARCHAR2 (4);
86       l_cal_count                  NUMBER;
87       l_duration                   NUMBER;
88       l_date                       DATE;
89 
90       --FPBug#4585491
91       l_R_count                       NUMBER := 0;
92       l_M_count                       NUMBER := 0;
93       l_B_count                       NUMBER := 0;
94 
95       CURSOR cur_get_max (v_batch_id NUMBER)
96       IS
97          SELECT MAX (plan_cmplt_date)
98            FROM gme_batch_steps
99           WHERE batch_id = v_batch_id;
100 
101       CURSOR cur_get_min (v_batch_id NUMBER)
102       IS
103          SELECT MIN (plan_start_date)
104            FROM gme_batch_steps
105           WHERE batch_id = v_batch_id;
106 
107       CURSOR cur_get_material (v_batch_id NUMBER)
108       IS
109          SELECT material_detail_id, line_type
110            FROM gme_material_details
111           WHERE batch_id = v_batch_id;
112 
113       CURSOR cur_get_prec_steps (v_batch_id NUMBER, v_batchstep_id NUMBER)
114       IS
115          SELECT   s.batchstep_id, d.dep_type, d.standard_delay
116                  ,s.step_status
117              FROM gme_batch_step_dependencies d, gme_batch_steps s
118             WHERE d.batchstep_id = v_batchstep_id
119               AND s.batchstep_id = d.dep_step_id
120               AND s.batch_id = v_batch_id
121               AND d.batch_id = s.batch_id
122          ORDER BY s.plan_start_date;
123 
124       CURSOR cur_get_succ_steps (v_batch_id NUMBER, v_batchstep_id NUMBER)
125       IS
126          SELECT   d.batchstep_id, d.dep_type, d.standard_delay, s.step_status
127              FROM gme_batch_step_dependencies d, gme_batch_steps s
128             WHERE d.batchstep_id = s.batchstep_id
129               AND d.dep_step_id = v_batchstep_id
130               AND s.batch_id = v_batch_id
131               AND d.batch_id = s.batch_id
132          ORDER BY s.plan_cmplt_date;
133 
134       CURSOR cur_get_dep_step_times (v_batchstep_id NUMBER)
135       IS
136          SELECT batchstep_id, plan_start_date, plan_cmplt_date
137            FROM gme_batch_steps
138           WHERE batchstep_id = v_batchstep_id;
139 
140       CURSOR cur_get_max_date_from_prev (
141          v_batch_id       NUMBER
142         ,v_batchstep_id   NUMBER)
143       IS
144          SELECT MAX (  DECODE (d.dep_type
145                               ,1, s.plan_start_date
146                               ,0, s.plan_cmplt_date)
147                      + d.standard_delay / 24) max_date
148            FROM gme_batch_step_dependencies d, gme_batch_steps s
149           WHERE d.batchstep_id = v_batchstep_id
150             AND s.batchstep_id = d.dep_step_id
151             AND s.batch_id = v_batch_id
152             AND d.batch_id = s.batch_id;
153 
154       CURSOR cur_is_charge_associated (v_batch_id NUMBER, v_batchstep_id NUMBER)
155       IS
156          SELECT 1
157            FROM DUAL
158           WHERE EXISTS (
159                    SELECT 1
160                      FROM gme_batch_step_charges
161                     WHERE batch_id = v_batch_id
162                       AND batchstep_id = v_batchstep_id);
163 
164       l_cur_is_charge_associated   cur_is_charge_associated%ROWTYPE;
165       l_dep_step_rec               cur_get_succ_steps%ROWTYPE;
166       l_max_date                   DATE;
167       l_found                      BOOLEAN;
168       l_source_step_id_tbl         step_tab;
169       l_calendar_code              VARCHAR2 (10);
170    BEGIN
171       IF (NVL (g_debug, 0) IN
172                        (gme_debug.g_log_statement, gme_debug.g_log_procedure) ) THEN
173          gme_debug.put_line (g_pkg_name || '.' || l_api_name || ':'
174                              || 'Entering');
175       END IF;
176 
177       /* Set the return status to success initially */
178       x_return_status := fnd_api.g_ret_sts_success;
179 
180       /* Ensure that either a start_date or end_date has been passed. */
181       IF (    p_batch_step_rec.plan_start_date IS NULL
182           AND p_batch_step_rec.plan_cmplt_date IS NULL) THEN
183          RAISE no_dates_passed;
184       END IF;
185 
186       x_batch_step_rec := p_batch_step_rec;
187 
188       /* The current Step Status must be Pending */
189       IF NOT (x_batch_step_rec.step_status in (1,2)) THEN
190          RAISE invalid_step_status;
191       END IF;
192 
193       l_batch_header_rec.batch_id := x_batch_step_rec.batch_id;
194       l_calendar_code := gme_common_pvt.g_calendar_code;
195 
196       /* Initialize local batch header */
197       IF NOT (gme_batch_header_dbl.fetch_row (l_batch_header_rec
198                                              ,l_batch_header_rec) ) THEN
199          RAISE batch_header_fetch_error;
200       END IF;
201 
202       IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
203          gme_debug.put_line (   'trying to reschedule steps to '
204                              || TO_CHAR (p_batch_step_rec.plan_start_date
205                                         ,'DD-MON-YYYY HH24:MI:SS') );
206          gme_debug.put_line (   'trying to reschedule steps cmp to '
207                              || TO_CHAR (p_batch_step_rec.plan_cmplt_date
208                                         ,'DD-MON-YYYY HH24:MI:SS') );
209          gme_debug.put_line (   'Going to check previous step of '
210                              || TO_CHAR (x_batch_step_rec.batchstep_no) );
211          gme_debug.put_line (   'p_source_step_id_tbl '
212                              || TO_CHAR (p_source_step_id_tbl.COUNT) );
213       END IF;
214 
215       IF (l_batch_header_rec.batch_type = 0) THEN
216          l_doc_type := 'PROD';
217       ELSE
218          l_doc_type := 'FPO';
219       END IF;
220 
221       IF l_batch_header_rec.update_inventory_ind = 'Y' THEN
222          IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
223             gme_debug.put_line (   'deleting transactions for  '
224                                 || x_batch_step_rec.batchstep_id);
225          END IF;
226 
227          DELETE FROM gme_resource_txns
228                WHERE doc_type = l_doc_type
229                  AND doc_id = x_batch_step_rec.batch_id
230                  AND line_id IN (
231                         SELECT batchstep_resource_id
232                           FROM gme_batch_step_resources
233                          WHERE batch_id = x_batch_step_rec.batch_id
234                            AND batchstep_id = x_batch_step_rec.batchstep_id);
235 
236          -- Navin Added as part of Reschedule Batch/Step Build.
237          DELETE FROM gme_resource_txns_gtmp
238                WHERE doc_type = l_doc_type
239                  AND doc_id = x_batch_step_rec.batch_id
240                  AND line_id IN (
241                         SELECT batchstep_resource_id
242                           FROM gme_batch_step_resources
243                          WHERE batch_id = x_batch_step_rec.batch_id
244                            AND batchstep_id = x_batch_step_rec.batchstep_id);
245       END IF;
246 
247       gme_create_step_pvt.calc_dates
248                        (p_gme_batch_header_rec      => l_batch_header_rec
249                        ,p_use_workday_cal           => p_use_workday_cal
250                        ,p_contiguity_override       => p_contiguity_override
251                        ,p_return_status             => l_return_status
252                        ,p_step_id                   => p_batch_step_rec.batchstep_id
253                        ,p_plan_start_date           => p_batch_step_rec.plan_start_date
254                        ,p_plan_cmplt_date           => p_batch_step_rec.plan_cmplt_date);
255 
256       IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
257          gme_debug.put_line (   'Return status from calc_dates '
258                              || l_return_status);
259       END IF;
260 
261       IF l_return_status <> x_return_status THEN
262          RAISE cal_dates_error;
263       END IF;
264 
265       IF NOT (gme_batch_steps_dbl.fetch_row (p_batch_step_rec
266                                             ,x_batch_step_rec) ) THEN
267          RAISE batch_step_fetch_error;
268       END IF;
269 
270       /* System always recalculate plan completion date
271          based on plan start date, but If user has passed in both the
272          dates then we also need to honor whatever user had passed in,
273          that means there will be truncation or gap
274       */
275       IF NVL (p_batch_step_rec.plan_cmplt_date
276              ,x_batch_step_rec.plan_cmplt_date) <
277                                               x_batch_step_rec.plan_cmplt_date THEN
278          l_batch_header_rec.plan_cmplt_date :=
279                                              p_batch_step_rec.plan_cmplt_date;
280          gme_reschedule_batch_pvt.truncate_date
281                             (p_batch_header_rec      => l_batch_header_rec
282                             ,p_batchstep_id          => p_batch_step_rec.batchstep_id
283                             ,p_date                  => 1
284                             ,x_return_status         => l_return_status);
285          x_batch_step_rec.plan_cmplt_date := p_batch_step_rec.plan_cmplt_date;
286 
287          IF l_return_status <> x_return_status THEN
288             RAISE trun_date_error;
289          END IF;
290       ELSIF NVL (p_batch_step_rec.plan_cmplt_date
291                 ,x_batch_step_rec.plan_cmplt_date) >
292                                               x_batch_step_rec.plan_cmplt_date THEN
293          x_batch_step_rec.plan_cmplt_date := p_batch_step_rec.plan_cmplt_date;
294 
295          IF NOT (gme_batch_steps_dbl.update_row (x_batch_step_rec) ) THEN
296             RAISE save_data_error;
297          END IF;
298       END IF;
299         --Bug#4543875 (port 4416699) Update the changed step due date in the procedure calc_dates with the original due date
300        UPDATE gme_batch_steps
301        SET due_date = p_batch_step_rec.due_date
302            ,last_updated_by = gme_common_pvt.g_user_ident
303            ,last_update_date = gme_common_pvt.g_timestamp
304            ,last_update_login = gme_common_pvt.g_login_id
305        WHERE batch_id = p_batch_step_rec.batch_id
306        AND batchstep_id = p_batch_step_rec.batchstep_id;
307        --Bug#4543875
308 
309       IF (NVL (g_debug, 0) = gme_debug.g_log_statement) THEN
310          gme_debug.put_line (   g_pkg_name
311                              || '.'
312                              || l_api_name
313                              || ':'
314                              || 'Calling Save_all_data');
315       END IF;
316 
317       l_batch_step_m_rec := x_batch_step_rec;
318       save_all_data (p_batch_step_rec
319                     ,p_use_workday_cal
320                     ,p_contiguity_override
321                     ,x_batch_step_rec.plan_start_date
322                     ,x_batch_step_rec.plan_cmplt_date
323                     ,l_return_status);
324 
325       IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
326          gme_debug.put_line (   'Came back from save all data with status '
327                              || l_return_status);
328       END IF;
329 
330       IF l_return_status <> x_return_status THEN
331          RAISE save_data_error;
332       END IF;
333 
334       /*******************************************************************************
335       Since this step has been rescheduled now let's reschedule dependent steps
336       p_source_step_id_tbl tells us which step we are coming from in the tree.
337       Let's assume that we have steps dependency set-up as
338        10 - 20 - 30  and 10 - 40  All Finish to start.
339       Now user is rescheduling step 20 and dependent steps are getting rescheduled
340       as well.  The way logic works is  we are going to call this very procedure
341       for all the succeding steps to 20 and all precceding steps to 20.
342       That means we call reschedule_step (30, p_source_step_is as 20),
343       then in reschedule of 30 we will call succeding steps to 30 there is NONE.
344       SO we look at precceding steps to 30 and there is 20, but we do not want to
345       reschedule 20 again, because that is where we are coming from.
346       This is where p_source_step_id_tbl is used.  If you follow the logic it will
347       look like the following:
348                               20
349                                30
350                                10
351                                 40
352       *******************************************************************************/
353    --   IF l_batch_header_rec.enforce_step_dependency = 1 THEN
354          /* Enforce step dependency on or scheduleing set to TRUE */
355          -- rescheduling a batch step  in WIP status when one or more steps is in pending status raises an error.
356          FOR i IN 1 .. p_source_step_id_tbl.COUNT LOOP
357             l_source_step_id_tbl (i) := p_source_step_id_tbl (i);
358          END LOOP;
359 
360          /* Call the reschedule step recursive routine for the children of the current step */
361          /* Reschedule succeding steps */
362          IF p_reschedule_succeeding = fnd_api.g_true  OR
363             l_batch_header_rec.enforce_step_dependency = 1 THEN
364             OPEN cur_get_succ_steps (p_batch_step_rec.batch_id
365                                     ,p_batch_step_rec.batchstep_id);
366 
367             FETCH cur_get_succ_steps
368              INTO l_dep_step_rec;
369 
370             WHILE cur_get_succ_steps%FOUND LOOP
371                l_found := FALSE;
372 
373                IF (p_source_step_id_tbl.COUNT > 0) THEN
374                   FOR i IN 1 .. p_source_step_id_tbl.COUNT LOOP
375                      IF l_dep_step_rec.batchstep_id =
376                                                      p_source_step_id_tbl (i) THEN
377                         l_found := TRUE;
378                         EXIT WHEN l_found;
379                      END IF;
380                   END LOOP;
381                END IF;
382 
383                IF     l_found = FALSE
384                   AND l_dep_step_rec.step_status <> gme_common_pvt.g_step_wip THEN
385                   /* Continue only if the succeeding step is not the same as the step which initiated the reschedule and is not WIP */
386                   l_batch_step_rec.batchstep_id :=
387                                                   l_dep_step_rec.batchstep_id;
388                   l_batch_step_rec.batch_id := p_batch_step_rec.batch_id;
389                    --  Rework 4543875 Pawan Kumar added for fetching the data for succeding step
390                   IF NOT (gme_batch_steps_dbl.fetch_row (l_batch_step_rec
391                                             ,l_batch_step_rec) ) THEN
392                       RAISE batch_step_fetch_error;
393                   END IF;
394                   l_max_date :=
395                      gme_create_step_pvt.get_max_step_date
396                         (p_use_workday_cal       => p_use_workday_cal
397                         ,p_calendar_code         => l_calendar_code
398                         ,p_batchstep_id          => l_batch_step_rec.batchstep_id
399                         ,p_batch_id              => l_batch_step_m_rec.batch_id
400                         ,p_batch_start_date      => l_batch_step_m_rec.plan_start_date);
401 
402                   IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
403                      gme_debug.put_line
404                                  (   'MAX date '
405                                   || TO_CHAR (l_max_date
406                                              ,'DD-MON-YYYY HH24:MI:SS')
407                                   || ' plan start '
408                                   || TO_CHAR
409                                             (x_batch_step_rec.plan_start_date
410                                             ,'DD-MON-YYYY HH24:MI:SS') );
411                   END IF;
412 
413                   l_batch_step_rec.plan_start_date := l_max_date;
414                   l_batch_step_rec.plan_cmplt_date := NULL;
415                   l_source_step_id_tbl (l_source_step_id_tbl.COUNT + 1) :=
416                                                  p_batch_step_rec.batchstep_id;
417 
418                   IF (NVL (g_debug, 0) = gme_debug.g_log_statement) THEN
419                      gme_debug.put_line
420                             (   g_pkg_name
421                              || '.'
422                              || l_api_name
423                              || ':'
424                              || 'Calling Reschedule_step for batchstep_id : '
425                              || p_batch_step_rec.batchstep_id);
426                   END IF;
427 
428                   reschedule_step
429                           (p_batch_step_rec             => l_batch_step_rec
430                           ,p_source_step_id_tbl         => l_source_step_id_tbl
431                           ,p_contiguity_override        => p_contiguity_override
432                           ,p_reschedule_preceding       => p_reschedule_preceding
433                           ,p_reschedule_succeeding      => p_reschedule_succeeding
434                           ,p_use_workday_cal            => p_use_workday_cal
435                           ,x_batch_step_rec             => x_batch_step_rec
436                           ,x_return_status              => l_return_status);
437 
438                   IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
439                      gme_debug.put_line
440                         (   'Back from reschedule_succeeding_steps with status '
441                          || l_return_status
442                          || ' for step ID '
443                          || p_batch_step_rec.batchstep_id);
444                   END IF;
445 
446                   IF l_return_status <> x_return_status THEN
447                      CLOSE cur_get_succ_steps;
448 
449                      RAISE child_step_resch_error;
450                   END IF;
451                END IF;                                   /* l_found = FALSE */
452 
453                FETCH cur_get_succ_steps
454                 INTO l_dep_step_rec;
455             END LOOP;                     /* WHILE cur_get_succ_steps%FOUND */
456 
457             CLOSE cur_get_succ_steps;
458          END IF;                /* p_reschedule_succeeding = FND_API.G_TRUE */
459 
460          /* Reschedule preceding steps */
461          IF p_reschedule_preceding = fnd_api.g_true OR
462             l_batch_header_rec.enforce_step_dependency = 1 THEN
463             OPEN cur_get_prec_steps (p_batch_step_rec.batch_id
464                                     ,p_batch_step_rec.batchstep_id);
465 
466             FETCH cur_get_prec_steps
467              INTO l_dep_step_rec;
468 
469             WHILE cur_get_prec_steps%FOUND LOOP
470                l_found := FALSE;
471 
472                IF (p_source_step_id_tbl.COUNT > 0) THEN
473                   FOR i IN 1 .. p_source_step_id_tbl.COUNT LOOP
474                      IF l_dep_step_rec.batchstep_id =
475                                                      p_source_step_id_tbl (i) THEN
476                         l_found := TRUE;
477                         EXIT WHEN l_found;
478                      END IF;
479                   END LOOP;
480                END IF;
481 
482                IF     l_found = FALSE
483                   AND l_dep_step_rec.step_status <> gme_common_pvt.g_step_wip THEN
484                   /* Continue only if the preceeding step is not the same as the step which initiated the reschedule and is not WIP */
485                   l_batch_step_rec.batchstep_id :=
486                                                   l_dep_step_rec.batchstep_id;
487                   l_batch_step_rec.batch_id := p_batch_step_rec.batch_id;
488                   --  Rework 4543875 Pawan Kumar added for fetching the data for succeding step
489                   IF NOT (gme_batch_steps_dbl.fetch_row (l_batch_step_rec
490                                             ,l_batch_step_rec) ) THEN
491                       RAISE batch_step_fetch_error;
492                   END IF;
493                   /* Standard Delay should always be divided by 24 if used in date calculations */
494                   IF p_use_workday_cal = fnd_api.g_false THEN
495                      IF l_dep_step_rec.dep_type = 0 THEN
496                         l_batch_step_rec.plan_cmplt_date :=
497                              l_batch_step_m_rec.plan_start_date
498                            - l_dep_step_rec.standard_delay / 24;
499                         l_batch_step_rec.plan_start_date := NULL;
500                      ELSE
501                         l_batch_step_rec.plan_start_date :=
502                              l_batch_step_m_rec.plan_start_date
503                            - l_dep_step_rec.standard_delay / 24;
504                         l_batch_step_rec.plan_cmplt_date := NULL;
505                      END IF;
506                   ELSE
507         /* Use workday calendar */
508     /* Pass in the plan start date
509        of the current step as plan completion date to this procedure as we
510        want to find out the start or completion date of the preceeding step */
511                      IF l_dep_step_rec.standard_delay >= 0 THEN
512                         gmp_calendar_api.get_contiguous_periods
513                            (p_api_version        => 1
514                            ,p_init_msg_list      => TRUE
515                            ,p_start_date         => NULL
516                            ,p_end_date           => l_batch_step_m_rec.plan_start_date
517                            ,p_calendar_code      => l_calendar_code
518                            ,p_duration           => l_dep_step_rec.standard_delay
519                            ,p_output_tbl         => l_contig_period_tbl
520                            ,x_return_status      => l_return_status);
521                         l_cal_count := l_contig_period_tbl.COUNT;
522                         l_date := l_contig_period_tbl (l_cal_count).start_date;
523                      ELSE                     /* Standard delay is negative */
524                         gmp_calendar_api.get_contiguous_periods
525                            (p_api_version        => 1
526                            ,p_init_msg_list      => TRUE
527                            ,p_start_date         => l_batch_step_m_rec.plan_start_date
528                            ,p_end_date           => NULL
529                            ,p_calendar_code      => l_calendar_code
530                            ,p_duration           => ABS
531                                                        (l_dep_step_rec.standard_delay)
532                            ,p_output_tbl         => l_contig_period_tbl
533                            ,x_return_status      => l_return_status);
534                         l_cal_count := l_contig_period_tbl.COUNT;
535                         l_date := l_contig_period_tbl (l_cal_count).end_date;
536                      END IF;          /* l_dep_step_rec.standard_delay >= 0 */
537 
538                      IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
539                         gme_debug.put_line
540                            (   'Called to get the cmplt date for step prior to '
541                             || l_batch_step_m_rec.batchstep_id
542                             || ' '
543                             || TO_CHAR (l_batch_step_m_rec.plan_start_date
544                                        ,'DD-MON-YYYY HH24:MI:SS')
545                             || ' with duration of '
546                             || l_dep_step_rec.standard_delay
547                             || ' Got back '
548                             || TO_CHAR (l_date, 'DD-MON-YYYY HH24:MI:SS') );
549                      END IF;
550 
551                      IF l_return_status <> fnd_api.g_ret_sts_success THEN
552                         NULL;
553                      ELSE
554                         IF l_dep_step_rec.dep_type = 0 THEN
555                            l_batch_step_rec.plan_cmplt_date := l_date;
556                            l_batch_step_rec.plan_start_date := NULL;
557                         ELSE
558                            l_batch_step_rec.plan_start_date := l_date;
559                            l_batch_step_rec.plan_cmplt_date := NULL;
560                         END IF;
561                      END IF;
562                            /* l_return_status <> FND_API.G_RET_STS_SUCCESS  */
563                   END IF;                          /* p_use_workday_cal = 0 */
564 
565                   l_source_step_id_tbl (l_source_step_id_tbl.COUNT + 1) :=
566                                                  p_batch_step_rec.batchstep_id;
567 
568                   IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
569                      gme_debug.put_line
570                                    (   'Calling reschedule for batchstep_id '
571                                     || l_batch_step_rec.batchstep_id);
572                   END IF;
573 
574                   IF (NVL (g_debug, 0) = gme_debug.g_log_statement) THEN
575                      gme_debug.put_line
576                             (   g_pkg_name
577                              || '.'
578                              || l_api_name
579                              || ':'
580                              || 'Calling Reschedule_step for batchstep_id : '
581                              || l_batch_step_rec.batchstep_id);
582                   END IF;
583 
584                   reschedule_step
585                           (p_batch_step_rec             => l_batch_step_rec
586                           ,p_source_step_id_tbl         => l_source_step_id_tbl
587                           ,p_contiguity_override        => p_contiguity_override
588                           ,p_reschedule_preceding       => p_reschedule_preceding
589                           ,p_reschedule_succeeding      => p_reschedule_succeeding
590                           ,p_use_workday_cal            => p_use_workday_cal
591                           ,x_batch_step_rec             => x_batch_step_rec
592                           ,x_return_status              => l_return_status);
593 
594                   IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
595                      gme_debug.put_line
596                          (   'Back from reschedule source steps with status '
597                           || l_return_status
598                           || ' Steps IDs COUNT '
599                           || l_source_step_id_tbl.COUNT
600                           || ' Source Step ID '
601                           || l_batch_step_rec.batchstep_id);
602                   END IF;
603 
604                   IF l_return_status <> x_return_status THEN
605                      CLOSE cur_get_prec_steps;
606 
607                      RAISE child_step_resch_error;
608                   END IF;
609                END IF;                                   /* l_found = FALSE */
610 
611                FETCH cur_get_prec_steps
612                 INTO l_dep_step_rec;
613             END LOOP;                           /* cur_get_prec_steps%FOUND */
614 
615             CLOSE cur_get_prec_steps;
616          END IF;                 /* p_reschedule_preceding = FND_API.G_TRUE */
617    --   END IF;          /* l_batch_header_rec.enforce_step_dependency = 1 OR */
618 
619       IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
620          gme_debug.put_line (   'Done with succ as well as prec for '
621                              || p_batch_step_rec.batchstep_id);
622       END IF;
623 
624       IF p_source_step_id_tbl.COUNT = 0 THEN
625          /* Update the batch dates etc. only when this procedure is in for the
626             main step and not during the recursive calls */
627          OPEN cur_get_max (l_batch_header_rec.batch_id);
628 
629          FETCH cur_get_max
630           INTO l_max_end_date;
631 
632          IF l_max_end_date <> l_batch_header_rec.plan_cmplt_date THEN
633             l_batch_header_rec.plan_cmplt_date := l_max_end_date;
634             l_change := TRUE;
635          END IF;
636 
637          CLOSE cur_get_max;
638 
639          OPEN cur_get_min (l_batch_header_rec.batch_id);
640 
641          FETCH cur_get_min
642           INTO l_min_start_date;
643 
644          CLOSE cur_get_min;
645 
646          IF l_batch_header_rec.batch_status = 1 THEN
647             IF l_min_start_date <> l_batch_header_rec.plan_start_date THEN
648                l_batch_header_rec.plan_start_date := l_min_start_date;
649                l_change := TRUE;
650             END IF;
651          END IF;
652 
653          IF l_batch_header_rec.batch_status = 2 THEN
654             IF l_batch_header_rec.enforce_step_dependency = 1 THEN
655                IF l_min_start_date < l_batch_header_rec.plan_start_date THEN
656                   RAISE step_start_date_low;
657                END IF;
658             ELSE          /* l_batch_header_rec.enforce_step_dependency = 1 */
659                IF l_min_start_date < l_batch_header_rec.plan_start_date THEN
660                   gme_reschedule_batch_pvt.truncate_date
661                                    (p_batch_header_rec      => l_batch_header_rec
662                                    ,p_date                  => 0
663                                    ,x_return_status         => l_return_status);
664 
665                   IF l_return_status <> x_return_status THEN
666                      RAISE trun_date_error;
667                   END IF;
668                END IF;
669                    /* l_min_start_date < l_batch_header_rec.plan_start_date */
670             END IF;       /* l_batch_header_rec.enforce_step_dependency = 1 */
671          END IF;                     /* l_batch_header_rec.batch_status = 2 */
672 
673          IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
674             gme_debug.put_line
675                              (   'New min/max Dates are '
676                               || TO_CHAR (l_min_start_date
677                                          ,'DD-MON-YYYY HH24:MI:SS')
678                               || ' and '
679                               || TO_CHAR (l_max_end_date
680                                          ,'DD-MON-YYYY HH24:MI:SS')
681                               || ' and '
682                               || ' Batch dates are '
683                               || TO_CHAR (l_batch_header_rec.plan_start_date
684                                          ,'DD-MON-YYYY HH24:MI:SS')
685                               || ' and '
686                               || TO_CHAR (l_batch_header_rec.plan_cmplt_date
687                                          ,'DD-MON-YYYY HH24:MI:SS') );
688          END IF;
689 
690          /* This is to check the contiguity in case of step_start date is passed only*/
691          IF     p_use_workday_cal = fnd_api.g_true
692             AND p_contiguity_override = fnd_api.g_false THEN
693             l_duration :=
694                  (  l_batch_header_rec.plan_cmplt_date
695                   - l_batch_header_rec.plan_start_date)
696                * 24;
697             gmp_calendar_api.get_contiguous_periods
698                           (p_api_version        => 1
699                           ,p_init_msg_list      => TRUE
700                           ,p_start_date         => l_batch_header_rec.plan_start_date
701                           ,p_end_date           => NULL
702                           ,p_calendar_code      => l_calendar_code
703                           ,p_duration           => l_duration
704                           ,p_output_tbl         => l_contig_period_tbl
705                           ,x_return_status      => l_return_status);
706 
707             IF (l_return_status <> x_return_status) THEN
708                RAISE error_cont_period;
709             END IF;
710 
711             l_cal_count := l_contig_period_tbl.COUNT;
712 
713             IF l_cal_count > 1 THEN
714                RAISE error_non_contiguious;
715             END IF;
716          END IF;
717 
718          /* Since we update the batch dates in the code else where
719             we want to fetch the row, so that the timestamps are most
720             current, which is what is used to make sure that someone
721             else has not updated this batch during processing of this
722             program execution. That is why l_batch_header_rec is introduced.*/
723          IF NOT (gme_batch_header_dbl.fetch_row (l_batch_header_rec
724                                                 ,l_batch_header2_rec) ) THEN
725             RAISE batch_header_fetch_error;
726          END IF;
727 
728          l_batch_header2_rec.plan_start_date :=
729                                             l_batch_header_rec.plan_start_date;
730          l_batch_header2_rec.plan_cmplt_date :=
731                                             l_batch_header_rec.plan_cmplt_date;
732 
733          IF NOT (gme_batch_header_dbl.update_row (l_batch_header2_rec) ) THEN
734             RAISE save_data_error;
735          END IF;
736 
737          --Bug#5365527 added the validity rule check for LCF Batches
738 	 IF l_batch_header2_rec.recipe_validity_rule_id IS NOT NULL THEN
739             -- Checking of batch dates with validity rules dates after teh reschedule
740             IF NOT gme_common_pvt.check_validity_rule_dates
741                                   (l_batch_header2_rec.recipe_validity_rule_id
742                                   ,l_batch_header2_rec.plan_start_date
743                                   ,l_batch_header2_rec.plan_cmplt_date) THEN
744              x_return_status := fnd_api.g_ret_sts_error;
745              RAISE date_exceed_validity_rule;
746             END IF;
747         ELSE
748 	     IF (NVL (g_debug, 0) = gme_debug.g_log_statement) THEN
749                gme_debug.put_line (   g_pkg_name
750                                || '.'
751                                || l_api_name
752                                || ':'
753                                || 'Do not Check Validity Rule Dates as this is LCF batch');
754              END IF;
755 	END IF; /* recipe_validity_rule_id IS NOT NULL */
756       END IF;                             /* p_source_step_id_tbl.COUNT = 0 */
757 
758       /* Re-query output batch step row */
759       IF NOT (gme_batch_steps_dbl.fetch_row (p_batch_step_rec
760                                             ,x_batch_step_rec) ) THEN
761          RAISE batch_step_fetch_error;
762       END IF;
763 
764       -- Checking of batch dates with validity rules dates after teh reschedule
765       IF l_change = TRUE THEN
766          /* Now we have to update the transaction dates of pending transactions */
767          /* for the material lines which are not of step release type           */
768          OPEN cur_get_material (x_batch_step_rec.batch_id);
769 
770          FETCH cur_get_material
771          BULK COLLECT INTO l_material_detail_id_tbl, l_line_type_tbl;
772 
773          l_loop_count_get_material := cur_get_material%ROWCOUNT;
774 
775          CLOSE cur_get_material;
776 
777          FOR i IN 1 .. l_loop_count_get_material LOOP
778             -- stamp manual and incremental with step dates as well...
779             l_rel_type :=
780                gme_common_pvt.is_material_auto_release
781                                                 (l_material_detail_id_tbl (i) );
782 --Bug#5606089 Start. Added the following code.
783        /*     SELECT batchstep_id INTO l_batch_step2_rec.batchstep_id FROM GME_BATCH_STEP_ITEMS
784             WHERE material_detail_id = l_material_detail_id_tbl(i);
785 
786             IF NOT (gme_batch_steps_dbl.fetch_row (l_batch_step2_rec
787                                             ,x_batch_step2_rec) ) THEN
788                    RAISE batch_step_fetch_error;
789             END IF;*/
790 --Bug#5606089 End.
791 
792 -- Modified the if condition.
793               IF ( gme_common_pvt.is_material_assoc_to_step (l_material_detail_id_tbl (i) ) = TRUE
794                   AND
795                   l_rel_type IN
796                           (gme_common_pvt.g_mtl_manual_release
797                           ,gme_common_pvt.g_mtl_incremental_release
798                           ,gme_common_pvt.g_mtl_autobystep_release)) THEN
799 
800              -- pawan kumar start  bug 5929323  -- moved the fetch of batchstep_id  only when step is assoc
801 
802                   SELECT batchstep_id INTO l_batch_step2_rec.batchstep_id FROM GME_BATCH_STEP_ITEMS
803                    WHERE material_detail_id = l_material_detail_id_tbl(i);
804 
805                      IF NOT (gme_batch_steps_dbl.fetch_row (l_batch_step2_rec
806                                             ,x_batch_step2_rec) ) THEN
807                          RAISE batch_step_fetch_error;
808                       END IF;
809               -- pawan kumar end  bug 5929323
810 
811 
812                 IF l_line_type_tbl (i) = gme_common_pvt.g_line_type_ing THEN
813                   -- Update the material_required_date with the associated plan_start_Date;
814                   --Bug#5606089
815                   l_material_date := x_batch_step2_rec.plan_start_date;
816                   --l_material_date := x_batch_step_rec.plan_start_date;
817                ELSE
818                   -- Update the material required date with the associated plan cmplt Date;
819                   --Bug#5606089
820                   l_material_date := x_batch_step2_rec.plan_cmplt_date;
821                   --l_material_date := x_batch_step_rec.plan_cmplt_date;
822                END IF;
823                IF (NVL (g_debug, 0) = gme_debug.g_log_statement) THEN
824                   gme_debug.put_line
825                           (   'Calling Material Date Change for batchstep_id : '
826                            || x_batch_step2_rec.batchstep_id
827                            || ' Material_detail_id : '
828                            || l_material_detail_id_tbl (i)
829                            || 'for date'||l_material_date );
830                END IF;
831                gme_common_pvt.material_date_change
832                          (p_material_detail_id      => l_material_detail_id_tbl
833                                                                            (i)
834                          ,p_material_date           => l_material_date
835                          ,x_return_status           => l_return_status);
836 
837                IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
838                   gme_debug.put_line
839                        (   'Came back from material_date_change with status for step '
840                         || l_return_status);
841                END IF;
842 
843                --FPBug#4585491 commented out the following lines and added new checks
844                /*IF l_return_status <> x_return_status THEN
845                   RAISE mtl_dt_chg_error;
846                END IF; */
847 
848 	       IF (l_return_status = fnd_api.g_ret_sts_error) THEN
849                  RAISE mtl_dt_chg_error;
850                ELSIF (l_return_status = fnd_api.g_ret_sts_unexp_error) THEN
851                  RAISE fnd_api.g_exc_unexpected_error;
852                END IF;
853 
854             ELSE
855             	  gme_debug.put_line('3');
856                -- Navin Added as part of Reschedule Batch/Step Build.
857                IF l_line_type_tbl (i) = gme_common_pvt.g_line_type_ing THEN
858                   -- Update the material_required_date with the associated plan_start_Date;
859                   l_material_date := l_batch_header_rec.plan_start_date;
860                ELSE
861                   -- Update the material required date with the associated plan cmplt Date;
862                   l_material_date := l_batch_header_rec.plan_cmplt_date;
863                END IF;
864 
865                IF (NVL (g_debug, 0) = gme_debug.g_log_statement) THEN
866                   gme_debug.put_line
867                           (   'Calling Material Date Change for batch_id : '
868                            || l_batch_header_rec.batch_id
869                            || ' Material_detail_id : '
870                            || l_material_detail_id_tbl (i)
871                            || 'for date'||l_material_date  );
872                END IF;
873 
874                gme_common_pvt.material_date_change
875                          (p_material_detail_id      => l_material_detail_id_tbl
876                                                                            (i)
877                          ,p_material_date           => l_material_date
878                          ,x_return_status           => l_return_status);
879 
880                IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
881                   gme_debug.put_line
882                        (   'Came back from material_date_change with status '
883                         || l_return_status);
884                END IF;
885                --FPBug#4585491 Begin
886                /*IF l_return_status <> x_return_status THEN
887                   RAISE mtl_dt_chg_error;
888                END IF;*/
889 	       IF (l_return_status = fnd_api.g_ret_sts_error) THEN
890                  RAISE mtl_dt_chg_error;
891                ELSIF (l_return_status = fnd_api.g_ret_sts_unexp_error) THEN
892                  RAISE fnd_api.g_exc_unexpected_error;
893                END IF;
894             END IF; /* If material is not associted to steps */
895 	       /*
896 	      The above material_date_change returns different status as described below
897     	      R: When reservations are deleted for a material line
898 	      M: When MO Allocations are deleted for a material line
899 	      B: When Both reservations and material lines are deleted for a material line
900 	     */
901 	    IF x_return_status = 'R' THEN
902  	       l_R_count := l_R_count + 1;
903 	    ELSIF x_return_status = 'M' THEN
904                l_M_count := l_M_count + 1;
905 	    ELSIF x_return_status = 'B' THEN
906       	       l_B_count := l_B_count + 1;
907 	    END IF;
908          --FPBug#4585491 End
909          END LOOP;                 /* FOR i IN 1..l_loop_count_get_material */
910       END IF;                                            /* l_change = TRUE */
911 
912       --FPBug#4585491 Begin
913       IF (l_B_count > 0) OR (l_R_count > 0 AND l_M_count > 0) THEN
914        --atleast for one material line MO allocations and reservations are deleted
915        gme_common_pvt.log_message('GME_EXPIRED_RESERV_MO_DELETED');
916       ELSIF l_R_count > 0 THEN
917        ----atleast for one material line reservations are deleted
918        gme_common_pvt.log_message('GME_EXPIRED_RESERV_DELETED');
919       ELSIF l_M_count > 0 THEN
920        ----atleast for one material line MO allocations are deleted
921        gme_common_pvt.log_message('GME_EXPIRED_MO_DELETED');
922       END IF;
923       x_return_status := fnd_api.g_ret_sts_success;
924       --FPBug#4585491 End
925 
926       --Clearing the dates of the associated charges.
927       OPEN cur_is_charge_associated (l_batch_header_rec.batch_id
928                                     ,p_batch_step_rec.batchstep_id);
929 
930       FETCH cur_is_charge_associated
931        INTO l_cur_is_charge_associated;
932 
933       IF cur_is_charge_associated%FOUND THEN
934          CLOSE cur_is_charge_associated;
935 
936          IF (NVL (g_debug, 0) = gme_debug.g_log_statement) THEN
937             gme_debug.put_line (   g_pkg_name
938                                 || '.'
939                                 || l_api_name
940                                 || ':'
941                                 || 'Calling Clear charge dates for Batch_id:'
942                                 || l_batch_header_rec.batch_id
943                                 || ' Batchstep_id: '
944                                 || p_batch_step_rec.batchstep_id);
945          END IF;
946 
947          gme_batch_step_chg_pvt.clear_charge_dates
948                              (p_batch_id           => l_batch_header_rec.batch_id
949                              ,p_batchstep_id       => p_batch_step_rec.batchstep_id
950                              ,x_return_status      => l_return_status);
951 
952          IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
953             gme_debug.put_line
954                          (   'Came back from Clear charge dates with status '
955                           || l_return_status);
956          END IF;
957 
958          IF l_return_status <> x_return_status THEN
959             RAISE clear_chg_dates_error;
960          END IF;
961       ELSE
962          CLOSE cur_is_charge_associated;
963       END IF;
964 
965       --OM-GME integration - NOTIFY_CSR Action (Batch completion date may have changed)
966        /*Punit Kumar
967        gme_trans_engine_pvt.inform_om
968                    ( p_action              => 'NOTIFY_CSR'
969                    , p_trans_id            => NULL
970                    , p_trans_id_reversed   => NULL
971                    , p_gme_batch_hdr       => l_batch_header_rec
972                    , p_gme_matl_dtl        => NULL
973                    );
974          */
975       IF (NVL (g_debug, 0) IN
976                        (gme_debug.g_log_statement, gme_debug.g_log_procedure) ) THEN
977          gme_debug.put_line (   g_pkg_name
978                              || '.'
979                              || l_api_name
980                              || ':'
981                              || 'Exiting with '
982                              || x_return_status);
983       END IF;
984    EXCEPTION
985       WHEN batch_step_fetch_error THEN
986          x_return_status := fnd_api.g_ret_sts_error;
987          gme_common_pvt.log_message ('GME_API_BATCH_STEP_FETCH_ERR');
988       WHEN no_dates_passed THEN
989          x_return_status := fnd_api.g_ret_sts_error;
990          gme_common_pvt.log_message ('GME_API_RESCH_STEP_NO_DATES');
991       WHEN no_date_change THEN
992          x_return_status := fnd_api.g_ret_sts_error;
993          gme_common_pvt.log_message ('GME_API_RESCH_STEP_NO_DATE_CHG');
994       WHEN invalid_step_status THEN
995          x_return_status := fnd_api.g_ret_sts_error;
996          gme_common_pvt.log_message ('GME_API_INV_STEP_STAT_RESCH');
997       WHEN invalid_schedule_status THEN
998          x_return_status := fnd_api.g_ret_sts_error;
999          gme_common_pvt.log_message ('GME_API_INV_STEP_RESCH');
1000       WHEN date_overlap_error THEN
1001          x_return_status := fnd_api.g_ret_sts_error;
1002          gme_common_pvt.log_message ('GME_STEP_OVERLAP_ERROR');
1003       WHEN batch_header_fetch_error THEN
1004          x_return_status := fnd_api.g_ret_sts_error;
1005          gme_common_pvt.log_message ('GME_API_BATCH_FETCH_ERROR');
1006       WHEN date_exceed_validity_rule THEN
1007          x_return_status := fnd_api.g_ret_sts_error;
1008       WHEN step_start_date_low THEN
1009          x_return_status := fnd_api.g_ret_sts_error;
1010          gme_common_pvt.log_message ('GME_ESD_PLAN_DATE');
1011       WHEN error_cont_period THEN
1012          IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
1013             gme_debug.put_line ('Contiguity period ... _failed');
1014          END IF;
1015 
1016          x_return_status := l_return_status;
1017       WHEN error_non_contiguious THEN
1018          IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
1019             gme_debug.put_line ('Contiguity period ... not found');
1020          END IF;
1021 
1022          gme_common_pvt.log_message ('GME_NON_CONTIGUOUS_TIME');
1023          x_return_status := 'C';
1024       WHEN save_data_error OR mtl_dt_chg_error THEN
1025          x_return_status := l_return_status;
1026       WHEN child_step_resch_error THEN
1027          x_return_status := l_return_status;
1028       WHEN cal_dates_error THEN
1029          x_return_status := l_return_status;
1030       WHEN parent_step_resch_error THEN
1031          x_return_status := l_return_status;
1032       WHEN prev_step_err THEN
1033          x_return_status := l_return_status;
1034       WHEN clear_chg_dates_error THEN
1035          x_return_status := fnd_api.g_ret_sts_error;
1036       WHEN OTHERS THEN
1037          IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
1038             gme_debug.put_line (l_api_name || ':OTHERS ' || SQLERRM);
1039          END IF;
1040 
1041          x_return_status := fnd_api.g_ret_sts_unexp_error;
1042          fnd_msg_pub.add_exc_msg (g_pkg_name, l_api_name);
1043    END reschedule_step;
1044 
1045    /**************************************************************************************
1046         Procedure
1047         save_all_data
1048         Description
1049         This particular procedure updates all necessary tables.
1050         Parameters
1051         p_batch_step_rec       The batch step row to identify the step.
1052         p_diff             Duration used to reschedule the start date with.
1053         p_diff_end         Duration used to reschedule the end date with.
1054         x_return_status    outcome of the API call
1055                S - Success
1056                E - Error
1057                U - Unexpected error
1058         HISTORY
1059         G.Kelly     22-Feb-2002  Bug - Rewrote the  code.
1060         A Newbury   05-Aug-2003  B3045672 Modified cursor to include manual and incremental
1061         Pawan Kuamr 01-26-2004   For rework of bug 3010444
1062    ***************************************************************************************/
1063    PROCEDURE save_all_data (
1064       p_batch_step_rec        IN              gme_batch_steps%ROWTYPE
1065      ,p_use_workday_cal       IN              VARCHAR2
1066      ,p_contiguity_override   IN              VARCHAR2
1067      ,p_start_date            IN              DATE
1068      ,p_end_date              IN              DATE
1069      ,x_return_status         OUT NOCOPY      VARCHAR2)
1070    IS
1071       l_api_name         CONSTANT VARCHAR2 (30)            := 'SAVE_ALL_DATA';
1072       l_material_detail_id_tbl    gme_common_pvt.number_tab;
1073       l_phantom_ids               gme_common_pvt.number_tab;
1074       l_return_status             VARCHAR2 (1);
1075       l_batch_header_rec          gme_batch_header%ROWTYPE;
1076       l_in_batch_header_rec       gme_batch_header%ROWTYPE;
1077       x_batch_header_rec          gme_batch_header%ROWTYPE;
1078 
1079       TYPE l_line_type_tbl_typ IS TABLE OF gme_material_details.line_type%TYPE
1080          INDEX BY BINARY_INTEGER;
1081 
1082       l_line_type_tbl             l_line_type_tbl_typ;
1083       l_material_date             DATE;
1084       l_loop_count_get_material   NUMBER;
1085       /* Exception definitions */
1086       resched_phant_error         EXCEPTION;
1087       mtl_dt_chg_error            EXCEPTION;
1088       invalid_batch               EXCEPTION;
1089       invalid_prior_dates         EXCEPTION;
1090 
1091       --FPBug#4585491
1092       l_R_count                       NUMBER := 0;
1093       l_M_count                       NUMBER := 0;
1094       l_B_count                       NUMBER := 0;
1095 
1096       CURSOR cur_get_material (v_batch_id NUMBER, v_batchstep_id NUMBER)
1097       IS
1098          SELECT material_detail_id, line_type
1099            FROM gme_material_details det
1100           WHERE batch_id = v_batch_id
1101             AND release_type IN (1, 2, 3)
1102             AND EXISTS (
1103                    SELECT 1
1104                      FROM gme_batch_step_items
1105                     WHERE batch_id = v_batch_id
1106                       AND batchstep_id = v_batchstep_id
1107                       AND material_detail_id = det.material_detail_id);
1108    BEGIN
1109       IF (NVL (g_debug, 0) IN
1110                        (gme_debug.g_log_statement, gme_debug.g_log_procedure) ) THEN
1111          gme_debug.put_line (g_pkg_name || '.' || l_api_name || ':'
1112                              || 'Entering');
1113       END IF;
1114 
1115       /* Initialize return status to success */
1116       x_return_status := fnd_api.g_ret_sts_success;
1117       l_batch_header_rec.batch_id := p_batch_step_rec.batch_id;
1118 
1119       IF NOT (gme_batch_header_dbl.fetch_row (l_batch_header_rec
1120                                              ,x_batch_header_rec) ) THEN
1121          RAISE invalid_batch;
1122       END IF;
1123 
1124       OPEN cur_get_material (p_batch_step_rec.batch_id
1125                             ,p_batch_step_rec.batchstep_id);
1126 
1127       FETCH cur_get_material
1128       BULK COLLECT INTO l_material_detail_id_tbl, l_line_type_tbl;
1129 
1130       l_loop_count_get_material := cur_get_material%ROWCOUNT;
1131 
1132       CLOSE cur_get_material;
1133 
1134       FOR i IN 1 .. l_loop_count_get_material LOOP
1135          -- Navin Added as part of Reschedule Batch/Step Build.
1136          IF l_line_type_tbl (i) = gme_common_pvt.g_line_type_ing THEN
1137             -- Update the material_required_date with the associated plan_start_Date;
1138             l_material_date := p_start_date;
1139          ELSE
1140             -- Update the material required date with the associated plan cmplt Date;
1141             l_material_date := p_end_date;
1142          END IF;
1143 
1144          IF (NVL (g_debug, 0) = gme_debug.g_log_statement) THEN
1145             gme_debug.put_line
1146                           (   'Calling Material Date Change for batch_id : '
1147                            || l_batch_header_rec.batch_id
1148                            || ' Material_detail_id : '
1149                            || l_material_detail_id_tbl (i) );
1150          END IF;
1151 
1152          gme_common_pvt.material_date_change
1153                          (p_material_detail_id      => l_material_detail_id_tbl
1154                                                                            (i)
1155                          ,p_material_date           => l_material_date
1156                          ,x_return_status           => l_return_status);
1157 
1158          IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
1159             gme_debug.put_line
1160                        (   'Came back from Material Date Change with status '
1161                         || l_return_status);
1162          END IF;
1163          --FPBug#4585491 Begin
1164          /*IF l_return_status <> x_return_status THEN
1165             RAISE mtl_dt_chg_error;
1166          END IF;*/
1167 
1168 	 IF (l_return_status = fnd_api.g_ret_sts_error) THEN
1169              RAISE mtl_dt_chg_error;
1170           ELSIF (l_return_status = fnd_api.g_ret_sts_unexp_error) THEN
1171              RAISE fnd_api.g_exc_unexpected_error;
1172           END IF;
1173 
1174 	  /*
1175 	  The above material_date_change returns different status as described below
1176 	  R: When reservations are deleted for a material line
1177 	  M: When MO Allocations are deleted for a material line
1178 	  B: When Both reservations and material lines are deleted for a material line
1179 	 */
1180 	 IF x_return_status = 'R' THEN
1181  	   l_R_count := l_R_count + 1;
1182 	 ELSIF x_return_status = 'M' THEN
1183            l_M_count := l_M_count + 1;
1184 	 ELSIF x_return_status = 'B' THEN
1185       	   l_B_count := l_B_count + 1;
1186 	 END IF;
1187          --FPBug#4585491 End
1188       END LOOP;                    /* FOR i IN 1..l_loop_count_get_material */
1189 
1190       --FPBug#4585491 Begin
1191       IF (l_B_count > 0) OR (l_R_count > 0 AND l_M_count > 0) THEN
1192        --atleast for one material line MO allocations and reservations are deleted
1193        gme_common_pvt.log_message('GME_EXPIRED_RESERV_MO_DELETED');
1194       ELSIF l_R_count > 0 THEN
1195        ----atleast for one material line reservations are deleted
1196        gme_common_pvt.log_message('GME_EXPIRED_RESERV_DELETED');
1197       ELSIF l_M_count > 0 THEN
1198        ----atleast for one material line MO allocations are deleted
1199        gme_common_pvt.log_message('GME_EXPIRED_MO_DELETED');
1200       END IF;
1201       x_return_status := fnd_api.g_ret_sts_success;
1202       --FPBug#4585491 End
1203 
1204 
1205       /* Now we have to reschedule the batch associated with the step */
1206       /* lines of release type step release                           */
1207       /* All means manual, incremental and auto by step... NOT AUTO */
1208       IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
1209          gme_debug.put_line ('Calling Fetch Step Phantoms.');
1210       END IF;
1211 
1212       gme_phantom_pvt.fetch_step_phantoms
1213                              (p_batch_id                    => p_batch_step_rec.batch_id
1214                              ,p_batchstep_id                => p_batch_step_rec.batchstep_id
1215                              ,p_all_release_type_assoc      => 1
1216                              ,x_phantom_ids                 => l_phantom_ids
1217                              ,x_return_status               => l_return_status);
1218 
1219       IF (NVL (g_debug, -1) = gme_debug.g_log_statement) THEN
1220          gme_debug.put_line
1221                         (   'Came back from Fetch Step Phantoms with status '
1222                          || l_return_status);
1223       END IF;
1224 
1225       IF l_return_status <> x_return_status THEN
1226          RAISE resched_phant_error;
1227       END IF;
1228 
1229       FOR i IN 1 .. l_phantom_ids.COUNT LOOP
1230          l_batch_header_rec.batch_id := l_phantom_ids (i);
1231          -- Sending the completion date only as start date for the phantom batch
1232          l_batch_header_rec.plan_cmplt_date :=
1233                                              p_batch_step_rec.plan_start_date;
1234          l_in_batch_header_rec := l_batch_header_rec;
1235          gme_reschedule_batch_pvt.reschedule_batch
1236                              (p_batch_header_rec         => l_in_batch_header_rec
1237                              ,p_use_workday_cal          => p_use_workday_cal
1238                              ,p_contiguity_override      => p_contiguity_override
1239                              ,x_batch_header_rec         => l_batch_header_rec
1240                              ,x_return_status            => l_return_status);
1241 
1242          IF l_return_status <> x_return_status THEN
1243             RAISE resched_phant_error;
1244          END IF;
1245       END LOOP;                            /* i IN 1 .. l_phantom_ids.COUNT */
1246 
1247       IF (NVL (g_debug, 0) IN
1248                        (gme_debug.g_log_statement, gme_debug.g_log_procedure) ) THEN
1249          gme_debug.put_line (   g_pkg_name
1250                              || '.'
1251                              || l_api_name
1252                              || ':'
1253                              || 'Exiting with '
1254                              || x_return_status);
1255       END IF;
1256    EXCEPTION
1257       WHEN resched_phant_error OR mtl_dt_chg_error OR invalid_batch THEN
1258          x_return_status := l_return_status;
1259       WHEN invalid_prior_dates THEN
1260          x_return_status := fnd_api.g_ret_sts_error;
1261       WHEN OTHERS THEN
1262          x_return_status := fnd_api.g_ret_sts_unexp_error;
1263          fnd_msg_pub.add_exc_msg (g_pkg_name, l_api_name);
1264 
1265          IF (NVL (g_debug, 0) > 0) THEN
1266             gme_debug.put_line (   g_pkg_name
1267                                 || '.'
1268                                 || l_api_name
1269                                 || ':'
1270                                 || ' OTHERS:'