FND Design Data [Home] [Help]

View: PA_ASSIGNMENT_PROGRESS_V

Product: PA - Projects
Description:
Implementation/DBA Data: ViewAPPS.PA_ASSIGNMENT_PROGRESS_V
View Text

SELECT PPR.ACTUAL_FINISH_DATE - PTAV.ASSIGNMENT_END_DATE ACT_SCH_FINISH_VAR
, PPR.ACTUAL_START_DATE - PTAV.ASSIGNMENT_START_DATE ACT_SCH_START_VAR
, DECODE(PTAV.RESOURCE_CLASS_CODE
, 'PEOPLE'
, PPR.PPL_ACT_EFFORT_TO_DATE
, 'EQUIPMENT'
, PPR.EQPMT_ACT_EFFORT_TO_DATE
, PPR.OTH_QUANTITY_TO_DATE) - NVL(PA_PROGRESS_UTILS.GET_ASSGN_ACT_EFFORT_PERIOD (PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID)
, 0) ACTUAL_EFFORT
, PPR.ACTUAL_FINISH_DATE
, PPR.ACTUAL_START_DATE
, PPR.AS_OF_DATE
, PTAV.BASELINED_ASGMT_END_DATE
, PTAV.BASELINED_ASGMT_START_DATE
, PTAV.BASELINED_PLANNED_QTY BASELINED_EFFORT
, (PA_PROGRESS_UTILS.GET_NEXT_PROGRESS_CYCLE(PPA.PROJECT_ID
, PPE.PROJ_ELEMENT_ID
, PTAV.RESOURCE_LIST_MEMBER_ID
, 'PA_ASSIGNMENTS')-TRUNC(SYSDATE)) DAYS_UNTIL_PROGRESS_DUE
, (TRUNC(PTAV.ASSIGNMENT_START_DATE)-TRUNC(SYSDATE)) DAYS_UNTIL_START
, NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.OTH_QUANTITY_TO_DATE
, 0) +PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_QUANTITY
, PPR.ESTIMATED_REMAINING_EFFORT
, PPR.EQPMT_ETC_EFFORT
, NULL
, NULL
, NULL
, NULL
, PPR.OTH_ETC_QUANTITY
, (NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.OTH_QUANTITY_TO_DATE
, 0))) EST_AT_COMPLETION_EFFORT
, (PPR.ESTIMATED_FINISH_DATE - PTAV.BASELINED_ASGMT_END_DATE) EST_BAS_FINISH_VAR
, (PPR.ESTIMATED_START_DATE - PTAV.BASELINED_ASGMT_START_DATE) EST_BAS_START_VAR
, PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_QUANTITY
, PPR.ESTIMATED_REMAINING_EFFORT
, PPR.EQPMT_ETC_EFFORT
, NULL
, NULL
, NULL
, NULL
, PPR.OTH_ETC_QUANTITY
, (NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.OTH_QUANTITY_TO_DATE
, 0))) ESTIMATED_REMAINING_EFFORT
, PPR.ESTIMATED_FINISH_DATE
, PPR.ESTIMATED_START_DATE
, PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_QUANTITY
, PPR.ESTIMATED_REMAINING_EFFORT
, PPR.EQPMT_ETC_EFFORT
, NULL
, NULL
, NULL
, NULL
, PPR.OTH_ETC_QUANTITY
, (NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.OTH_QUANTITY_TO_DATE
, 0))) ETC_EFFORT
, PA_PROGRESS_UTILS.GET_NEXT_PROGRESS_CYCLE(PPE.PROJECT_ID
, PPE.PROJ_ELEMENT_ID
, PTAV.RESOURCE_LIST_MEMBER_ID
, 'PA_ASSIGNMENTS') NEXT_PROGRESS_DUE_DATE
, PA_PROGRESS_UTILS.GET_PROG_DT_CLOSEST_TO_SYS_DT(PPE.PROJECT_ID
, PPE.PROJ_ELEMENT_ID
, PTAV.RESOURCE_LIST_MEMBER_ID
, 'PA_ASSIGNMENTS') DEFAULT_AS_OF_DATE
, PA_PROGRESS_UTILS.PERCENT_COMPLETE_VALUE ( ( NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.OTH_QUANTITY_TO_DATE
, 0) )
, PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_QUANTITY
, PPR.ESTIMATED_REMAINING_EFFORT
, PPR.EQPMT_ETC_EFFORT
, NULL
, NULL
, NULL
, NULL
, PPR.OTH_ETC_QUANTITY
, (NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.OTH_QUANTITY_TO_DATE
, 0))) ) PERCENT_COMPLETE_EFFORT
, PPC.PERCENT_COMPLETE_ID
, PA_PROGRESS_UTILS.PERCENT_SPENT_VALUE ( ( NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0) +NVL(PPR.OTH_QUANTITY_TO_DATE
, 0) )
, ( NVL(PTAV.PLANNED_QUANTITY
, 0) ) ) PERCENT_SPENT_EFFORT
, PTAV.PLANNED_QUANTITY PLANNED_EFFORT
, PTAV.ASSIGNMENT_END_DATE - PTAV.BASELINED_ASGMT_END_DATE SCH_BASE_FINISH_VAR
, PTAV.ASSIGNMENT_START_DATE -PTAV.BASELINED_ASGMT_START_DATE SCH_BASE_START_VAR
, PTAV.ASSIGNMENT_END_DATE
, PTAV.ASSIGNMENT_START_DATE
, PPE.PROJ_ELEMENT_ID TASK_ID
, NULL TASK_MANAGER_NAME
, PPE.MANAGER_PERSON_ID TASK_MANAGER_PERSON_ID
, PPE.NAME TASK_NAME
, PPE.ELEMENT_NUMBER TASK_NUMBER
, NVL(PTAV.BASELINED_PLANNED_QTY
, 0)-(NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.OTH_QUANTITY_TO_DATE
, 0) +PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_QUANTITY
, PPR.ESTIMATED_REMAINING_EFFORT
, PPR.EQPMT_ETC_EFFORT
, NULL
, NULL
, NULL
, NULL
, PPR.OTH_ETC_QUANTITY
, (NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.OTH_QUANTITY_TO_DATE
, 0)))) VAR_AT_COMPLETION_EFFORT
, PTAV.RESOURCE_ASSIGNMENT_ID
, PPC.CURRENT_FLAG
, PPEV.ELEMENT_VERSION_ID
, PPA.LONG_NAME
, PPEV.OBJECT_TYPE
, PPE.PROJ_ELEMENT_ID
, PPA.PROJECT_ID
, PPA.NAME PROJECT_NAME
, PPA.SEGMENT1 PROJECT_NUMBER
, PPC.PUBLISHED_FLAG
, PPC.RECORD_VERSION_NUMBER
, PTAV.UNIT_OF_MEASURE_CODE UOM_CODE
, PTAV.UNIT_OF_MEASURE UOM_DESCRIPTION
, PTAV.TXN_CURRENCY_CODE
, DECODE(PPE.OBJECT_TYPE
, 'PA_STRUCTURES'
, PPPA.REMAIN_EFFORT_ENABLE_FLAG
, DECODE(PTT.REMAIN_EFFORT_ENABLE_FLAG
, 'Y'
, DECODE(PPPA.REMAIN_EFFORT_ENABLE_FLAG
, 'Y'
, 'Y'
, 'N')
, 'N')) REMAIN_EFFORT_ENABLE_FLAG
, DECODE(PPE.OBJECT_TYPE
, 'PA_TASKS'
, PTT.PROG_ENTRY_ENABLE_FLAG
, 'Y') PROG_ENTRY_ENABLE_FLAG
, PTAV.RESOURCE_ALIAS
, PTAV.RESOURCE_LIST_MEMBER_ID
, PTAV.RESOURCE_CLASS_CODE
, PTAV.RBS_ELEMENT_ID
, PTAV.PERSON_ID
, PTAV.RATE_BASED_FLAG
, PA_PROGRESS_UTILS.GET_ASSGN_ACT_EFFORT_PERIOD (PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID) ACTUAL_EFFORT_THIS_PERIOD
, PA_PROGRESS_UTILS.GET_ACT_TXN_COST_THIS_PERIOD (PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID) ACTUAL_COST_THIS_PERIOD
, PA_PROGRESS_UTILS.GET_LATEST_PROGRESS_ENTRY_DATE(PPA.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_TYPE
, PPR.STRUCTURE_TYPE
, PPE.PROJ_ELEMENT_ID) LATEST_PROGRESS_DATE
, PPEV.PARENT_STRUCTURE_VERSION_ID STRUCTURE_VERSION_ID
, PPPA.ALLOW_COLLAB_PROG_ENTRY
, DECODE(PTAV.RESOURCE_CLASS_CODE
, 'PEOPLE'
, PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 'EQUIPMENT'
, PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, PPR.OTH_ACT_RAWCOST_TO_DATE_TC) - NVL(PA_PROGRESS_UTILS.GET_ACT_TXN_RAWCOST_THISPERIOD (PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID)
, 0) ACTUAL_RAWCOST
, NVL(PTAV.PLANNED_RAW_COST_TXN_CUR
, 0) PLANNED_RAWCOST
, PTAV.BL_PLANNED_RAW_COST_TXN_CUR BASELINED_RAWCOST
, NVL(PPR.OTH_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, 0) +PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_RAW_COST_TXN_CUR
, PPR.PPL_ETC_RAWCOST_TC
, PPR.EQPMT_ETC_RAWCOST_TC
, PPR.OTH_ETC_RAWCOST_TC
, NULL
, NULL
, NULL
, NULL
, (NVL(PPR.OTH_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, 0))) EST_AT_COMPLETION_RAWCOST
, PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_RAW_COST_TXN_CUR
, PPR.PPL_ETC_RAWCOST_TC
, PPR.EQPMT_ETC_RAWCOST_TC
, PPR.OTH_ETC_RAWCOST_TC
, NULL
, NULL
, NULL
, NULL
, (NVL(PPR.OTH_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, 0))) ETC_RAWCOST_TC
, PA_PROGRESS_UTILS.PERCENT_COMPLETE_VALUE( ( NVL(PPR.OTH_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 0) +NVL(PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, 0) )
, PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_RAW_COST_TXN_CUR
, PPR.PPL_ETC_RAWCOST_TC
, PPR.EQPMT_ETC_RAWCOST_TC
, PPR.OTH_ETC_RAWCOST_TC
, NULL
, NULL
, NULL
, NULL
, (NVL(PPR.OTH_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, 0))) ) PERCENT_COMPLETE_RAWCOST
, PA_PROGRESS_UTILS.PERCENT_SPENT_VALUE( ( NVL(PPR.OTH_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 0) +NVL(PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, 0) )
, ( NVL(PTAV.PLANNED_RAW_COST_TXN_CUR
, 0) ) ) PERCENT_SPENT_RAWCOST
, PA_CURRENCY.ROUND_TRANS_CURRENCY_AMT((NVL(PTAV.PLANNED_RAW_COST_TXN_CUR
, 0)/DECODE(NVL(PPR.CUMULATIVE_WORK_QUANTITY
, 0)
, 0
, 1
, NVL(PPR.CUMULATIVE_WORK_QUANTITY
, 0)))
, PTAV.TXN_CURRENCY_CODE) PLANNED_RAWCOST_PER_UNIT
, NVL(PTAV.BL_PLANNED_RAW_COST_TXN_CUR
, 0)-(NVL(PPR.OTH_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, 0) +PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_RAW_COST_TXN_CUR
, PPR.PPL_ETC_RAWCOST_TC
, PPR.EQPMT_ETC_RAWCOST_TC
, PPR.OTH_ETC_RAWCOST_TC
, NULL
, NULL
, NULL
, NULL
, (NVL(PPR.OTH_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, 0)))) VAR_AT_COMPLETION_RAWCOST
, PA_PROGRESS_UTILS.GET_ACT_TXN_RAWCOST_THISPERIOD (PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID) ACTUAL_RAWCOST_THIS_PERIOD
, PTAV.UNPLANNED_FLAG UNPLANNED_ASSIGNMENTS_FLAG
, NVL(PTAV.PLANNED_BUR_COST_PROJ_CUR
, 0) PLANNED_COST_BUR_PC
, DECODE(PTAV.RESOURCE_CLASS_CODE
, 'PEOPLE'
, PPR.PPL_ACT_COST_TO_DATE_PC
, 'EQUIPMENT'
, PPR.EQPMT_ACT_COST_TO_DATE_PC
, PPR.OTH_ACT_COST_TO_DATE_PC) - NVL(PA_PROGRESS_UTILS.GET_ACT_COST_THIS_PERIOD (PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID)
, 0) ACTUAL_COST_BUR_PC
, PA_PROGRESS_UTILS.GET_ACT_COST_THIS_PERIOD (PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID) ACTUAL_COST_THIS_BUR_PC
, PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_BUR_COST_PROJ_CUR
, PPR.PPL_ETC_COST_PC
, PPR.EQPMT_ETC_COST_PC
, PPR.OTH_ETC_COST_PC
, NULL
, NULL
, NULL
, NULL
, (NVL(PPR.OTH_ACT_COST_TO_DATE_PC
, 0)+NVL(PPR.PPL_ACT_COST_TO_DATE_PC
, 0)+NVL(PPR.EQPMT_ACT_COST_TO_DATE_PC
, 0))) ETC_COST_BUR_PC
, NVL(PPR.OTH_ACT_COST_TO_DATE_PC
, 0)+NVL(PPR.PPL_ACT_COST_TO_DATE_PC
, 0)+NVL(PPR.EQPMT_ACT_COST_TO_DATE_PC
, 0) +PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_BUR_COST_PROJ_CUR
, PPR.PPL_ETC_COST_PC
, PPR.EQPMT_ETC_COST_PC
, PPR.OTH_ETC_COST_PC
, NULL
, NULL
, NULL
, NULL
, (NVL(PPR.OTH_ACT_COST_TO_DATE_PC
, 0)+NVL(PPR.PPL_ACT_COST_TO_DATE_PC
, 0)+NVL(PPR.EQPMT_ACT_COST_TO_DATE_PC
, 0))) EST_AT_COMPLETION_COST_BUR_PC
, PPA.PROJECT_CURRENCY_CODE
, PPR.PROGRESS_ROLLUP_ID PROGRESS_ROLLUP_ID
, PPA.ORG_ID
, NULL
, PPEV.DISPLAY_SEQUENCE
FROM PA_PROJECTS_ALL PPA
, PA_PROJ_ELEMENTS PPE
, PA_PROJ_ELEMENT_VERSIONS PPEV
, PA_PROJ_ELEM_VER_STRUCTURE PPVS
, PA_PERCENT_COMPLETES PPC
, PA_PROGRESS_ROLLUP PPR
, PA_PROJ_PROGRESS_ATTR PPPA
, PA_TASK_TYPES PTT
, PA_TASK_ASGMTS_V PTAV
WHERE PPE.PROJECT_ID = PPA.PROJECT_ID
AND PPVS.LATEST_EFF_PUBLISHED_FLAG = 'Y'
AND PPE.LINK_TASK_FLAG = 'N'
AND PPE.OBJECT_TYPE = 'PA_TASKS'
AND PPE.PROJ_ELEMENT_ID = PPEV.PROJ_ELEMENT_ID
AND PPEV.PARENT_STRUCTURE_VERSION_ID = PPVS.ELEMENT_VERSION_ID
AND PPA.PROJECT_ID = PPVS.PROJECT_ID
AND PPE.TYPE_ID = PTT.TASK_TYPE_ID(+)
AND PTT.OBJECT_TYPE(+) = 'PA_TASKS'
AND PTAV.PROJECT_ID = PPE.PROJECT_ID
AND PTAV.TASK_ID = PPE.PROJ_ELEMENT_ID
AND PTAV.TASK_VERSION_ID = PPEV.ELEMENT_VERSION_ID
AND PTAV.PROJECT_ID = PPR.PROJECT_ID(+)
AND PTAV.RESOURCE_LIST_MEMBER_ID = PPR.OBJECT_ID(+)
AND PTAV.TASK_ID = PPR.PROJ_ELEMENT_ID(+)
AND PPC.TASK_ID(+) = PPR.PROJ_ELEMENT_ID
AND 'PA_ASSIGNMENTS' = PPR.OBJECT_TYPE(+)
AND PPC.PROJECT_ID(+) = PPR.PROJECT_ID
AND PPC.OBJECT_ID(+) = PPR.OBJECT_ID
AND PPC.OBJECT_TYPE(+) = PPR.OBJECT_TYPE
AND PPC.STRUCTURE_TYPE(+) = PPR.STRUCTURE_TYPE
AND TRUNC(PPC.DATE_COMPUTED (+)) = TRUNC(PPR.AS_OF_DATE)
AND PPR.STRUCTURE_TYPE(+) = 'WORKPLAN'
AND PPR.STRUCTURE_VERSION_ID(+) IS NULL
AND PPR.CURRENT_FLAG(+) = PA_PROGRESS_UTILS.GET_W_PUB_CURRFLAG(PTAV.PROJECT_ID
, PTAV.RESOURCE_LIST_MEMBER_ID
, 'PA_ASSIGNMENTS'
, PTAV.TASK_ID
, 'Y')
AND PPR.PERCENT_COMPLETE_ID = PPC.PERCENT_COMPLETE_ID(+)
AND PPVS.PROJECT_ID = PPPA.PROJECT_ID(+)
AND PPVS.PROJ_ELEMENT_ID = PPPA.OBJECT_ID(+)
AND PPPA.STRUCTURE_TYPE(+) = 'WORKPLAN'
AND PTAV.TA_DISPLAY_FLAG = 'Y'

Columns

Name
ACT_SCH_FINISH_VAR
ACT_SCH_START_VAR
ACTUAL_EFFORT
ACTUAL_FINISH_DATE
ACTUAL_START_DATE
AS_OF_DATE
BASELINE_FINISH_DATE
BASELINE_START_DATE
BASELINED_EFFORT
DAYS_UNTIL_PROGRESS_DUE
DAYS_UNTIL_START
EST_AT_COMPLETION_EFFORT
EST_BAS_FINISH_VAR
EST_BAS_START_VAR
EST_REMAINING_EFFORT
ESTIMATED_FINISH_DATE
ESTIMATED_START_DATE
ETC_EFFORT
NEXT_PROGRESS_DUE_DATE
DEFAULT_AS_OF_DATE
PERCENT_COMPLETE_EFFORT
PERCENT_COMPLETE_ID
PERCENT_SPENT_EFFORT
PLANNED_EFFORT
SCH_BASE_FINISH_VAR
SCH_BASE_START_VAR
SCHEDULED_FINISH_DATE
SCHEDULED_START_DATE
TASK_ID
TASK_MANAGER_NAME
TASK_MANAGER_PERSON_ID
TASK_NAME
TASK_NUMBER
VAR_AT_COMPLETION_EFFORT
RESOURCE_ASSIGNMENT_ID
CURRENT_FLAG
ELEMENT_VERSION_ID
LONG_NAME
OBJECT_TYPE
PROJ_ELEMENT_ID
PROJECT_ID
PROJECT_NAME
PROJECT_NUMBER
PUBLISHED_FLAG
RECORD_VERSION_NUMBER
UOM_CODE
UOM_DESCRIPTION
TXN_CURRENCY_CODE
EFFORT_ENABLED_FLAG
PROG_ENTRY_ENABLE_FLAG
RESOURCE_ALIAS
RESOURCE_LIST_MEMEBER_ID
RESOURCE_CLASS_CODE
RBS_ELEMENT_ID
PERSON_ID
RATE_BASED_FLAG
ACTUAL_EFFORT_THIS_PERIOD
ACTUAL_COST_THIS_PERIOD
LATEST_PROGRESS_DATE
STRUCTURE_VERSION_ID
ALLOW_COLLAB_PROG_ENTRY
ACTUAL_RAWCOST
PLANNED_RAWCOST
BASELINED_RAWCOST
EST_AT_COMPLETION_RAWCOST
ETC_RAWCOST_TC
PERCENT_COMPLETE_RAWCOST
PERCENT_SPENT_RAWCOST
PLANNED_RAWCOST_PER_UNIT
VAR_AT_COMPLETION_RAWCOST
ACTUAL_RAWCOST_THIS_PERIOD
UNPLANNED_ASSIGNMENTS_FLAG
PLANNED_COST_BUR_PC
ACTUAL_COST_BUR_PC
ACTUAL_COST_THIS_BUR_PC
ETC_COST_BUR_PC
EST_AT_COMPLETION_COST_BUR_PC
PROJECT_CURRENCY_CODE
PROGRESS_ROLLUP_ID
PROJECT_ORG_ID
SESSION_ORG_ID
DISPLAY_SEQUENCE