[Home] [Help]
| Product: | PA - Projects |
|---|---|
| Meaning: | Labor Costing Method |
| Description: | Indicates the method that is used for calculating the labor cost.This can be either Standard Costing, Actual Costing with accrual or Actual Costing. |
| Code | Meaning | Description |
|---|---|---|
| ACTUAL | Actual Costing | Actual Costing |
| STANDARD_COSTING | Standard Costing | Standard Costing |
|
|
|
|