FND Design Data [Home] [Help]

View: PA_TASKS_ASSIGNS_PROGRESS_V

Product: PA - Projects
Description:
Implementation/DBA Data: ViewAPPS.PA_TASKS_ASSIGNS_PROGRESS_V
View Text

SELECT PA_PROGRESS_UTILS.GET_ACT_FOR_PREV_ASOFDATE(PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID
, 'C'
, 'B'
, 'T') ACTUAL_COST
, PA_PROGRESS_UTILS.GET_ACT_FOR_PREV_ASOFDATE(PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID
, 'E'
, NULL
, NULL) ACTUAL_EFFORT
, PPR.ACTUAL_FINISH_DATE
, PPR.ACTUAL_START_DATE
, PPR.AS_OF_DATE AS_OF_DATE
, PTAV.BASELINED_ASGMT_END_DATE
, PTAV.BASELINED_ASGMT_START_DATE
, NVL(PPR.OTH_ACT_COST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_COST_TO_DATE_TC
, 0)+NVL(PPR.EQPMT_ACT_COST_TO_DATE_TC
, 0) +PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_BUR_COST_TXN_CUR
, PPR.PPL_ETC_COST_TC
, PPR.EQPMT_ETC_COST_TC
, PPR.OTH_ETC_COST_TC
, NULL
, NULL
, NULL
, NULL
, (NVL(PPR.OTH_ACT_COST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_COST_TO_DATE_TC
, 0)+NVL(PPR.EQPMT_ACT_COST_TO_DATE_TC
, 0))) EST_AT_COMPLETION_COST
, NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.OTH_QUANTITY_TO_DATE
, 0) +PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_QUANTITY
, PPR.ESTIMATED_REMAINING_EFFORT
, PPR.EQPMT_ETC_EFFORT
, NULL
, NULL
, NULL
, NULL
, PPR.OTH_ETC_QUANTITY
, (NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.OTH_QUANTITY_TO_DATE
, 0))) EST_AT_COMPLETION_EFFORT
, PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_QUANTITY
, PPR.ESTIMATED_REMAINING_EFFORT
, PPR.EQPMT_ETC_EFFORT
, NULL
, NULL
, NULL
, NULL
, PPR.OTH_ETC_QUANTITY
, (NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.OTH_QUANTITY_TO_DATE
, 0))) ESTIMATED_REMAINING_EFFORT
, PPR.ESTIMATED_FINISH_DATE
, PPR.ESTIMATED_START_DATE
, PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_BUR_COST_TXN_CUR
, PPR.PPL_ETC_COST_TC
, PPR.EQPMT_ETC_COST_TC
, PPR.OTH_ETC_COST_TC
, NULL
, NULL
, NULL
, NULL
, (NVL(PPR.OTH_ACT_COST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_COST_TO_DATE_TC
, 0)+NVL(PPR.EQPMT_ACT_COST_TO_DATE_TC
, 0))) ETC_COST_TC
, PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_QUANTITY
, PPR.ESTIMATED_REMAINING_EFFORT
, PPR.EQPMT_ETC_EFFORT
, NULL
, NULL
, NULL
, NULL
, PPR.OTH_ETC_QUANTITY
, (NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.OTH_QUANTITY_TO_DATE
, 0))) ETC_EFFORT
, PA_PROGRESS_UTILS.GET_NEXT_PROGRESS_CYCLE(PPE.PROJECT_ID
, PPE.PROJ_ELEMENT_ID
, PTAV.RESOURCE_LIST_MEMBER_ID
, 'PA_ASSIGNMENTS')
, PA_PROGRESS_UTILS.GET_PROG_DT_CLOSEST_TO_SYS_DT(PPE.PROJECT_ID
, PPE.PROJ_ELEMENT_ID
, PTAV.RESOURCE_LIST_MEMBER_ID
, 'PA_ASSIGNMENTS')
, PA_PROGRESS_UTILS.PERCENT_COMPLETE_VALUE(DECODE(PTAV.RESOURCE_CLASS_CODE
, 'PEOPLE'
, NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)
, 'EQUIPMENT'
, NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0)
, NVL(PPR.OTH_QUANTITY_TO_DATE
, 0))
, DECODE(PTAV.RESOURCE_CLASS_CODE
, 'PEOPLE'
, NVL(PPR.ESTIMATED_REMAINING_EFFORT
, DECODE( SIGN(NVL(PTAV.PLANNED_QUANTITY
, 0)-NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0))
, -1
, 0
, NVL( PTAV.PLANNED_QUANTITY-PPR.PPL_ACT_EFFORT_TO_DATE
, 0)))
, 'EQUIPMENT'
, NVL(PPR.EQPMT_ETC_EFFORT
, DECODE( SIGN(NVL(PTAV.PLANNED_QUANTITY
, 0)-NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0))
, -1
, 0
, NVL( PTAV.PLANNED_QUANTITY-PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0)))
, NVL(PPR.OTH_ETC_QUANTITY
, DECODE( SIGN(NVL(PTAV.PLANNED_QUANTITY
, 0)-NVL(PPR.OTH_QUANTITY_TO_DATE
, 0))
, -1
, 0
, NVL( PTAV.PLANNED_QUANTITY-PPR.OTH_QUANTITY_TO_DATE
, 0)))))PERCENT_COMPLETE_EFFORT
, PPC.PERCENT_COMPLETE_ID
, PA_PROGRESS_UTILS.PERCENT_SPENT_VALUE( (NVL(PPR.PPL_ACT_EFFORT_TO_DATE
, 0)+NVL(PPR.EQPMT_ACT_EFFORT_TO_DATE
, 0) +NVL(PPR.OTH_QUANTITY_TO_DATE
, 0))
, (NVL(PTAV.PLANNED_QUANTITY
, 0)) ) PERCENT_SPENT_EFFORT
, NVL(PTAV.PLANNED_BUR_COST_TXN_CUR
, 0) PLANNED_COST
, PTAV.PLANNED_QUANTITY PLANNED_EFFORT
, PTAV.ASSIGNMENT_END_DATE
, PTAV.ASSIGNMENT_START_DATE
, PPE.PROJ_ELEMENT_ID
, PPE.NAME
, PPE.ELEMENT_NUMBER
, TO_CHAR(NULL) UNIT_OF_MEASURE
, PPEV.WBS_NUMBER
, PTAV.RESOURCE_ASSIGNMENT_ID RESOURCE_ASSIGNMENT_ID
, PPC.CURRENT_FLAG
, PPEV.ELEMENT_VERSION_ID
, PPEV.OBJECT_TYPE
, PPE.PROJ_ELEMENT_ID
, PPA.PROJECT_ID
, PPA.NAME
, PPA.SEGMENT1
, PPC.PUBLISHED_FLAG
, PPC.RECORD_VERSION_NUMBER
, PTAV.UNIT_OF_MEASURE_CODE
, PTAV.UNIT_OF_MEASURE
, PTAV.TXN_CURRENCY_CODE
, DECODE(PPE.OBJECT_TYPE
, 'PA_STRUCTURES'
, PPPA.REMAIN_EFFORT_ENABLE_FLAG
, DECODE(PTT.REMAIN_EFFORT_ENABLE_FLAG
, 'Y'
, DECODE(PPPA.REMAIN_EFFORT_ENABLE_FLAG
, 'Y'
, 'Y'
, 'N')
, 'N'))
, DECODE(PPE.OBJECT_TYPE
, 'PA_TASKS'
, PTT.PROG_ENTRY_ENABLE_FLAG
, 'Y')
, PTAV.RESOURCE_ALIAS
, PTAV.RESOURCE_LIST_MEMBER_ID
, PTAV.RESOURCE_CLASS_CODE
, PTAV.RBS_ELEMENT_ID
, PTAV.RATE_BASED_FLAG RATE_BASED_FLAG
, DECODE(PTAV.RESOURCE_CLASS_CODE
, 'PEOPLE'
, PPR.PPL_ACT_EFFORT_TO_DATE
, 'EQUIPMENT'
, PPR.EQPMT_ACT_EFFORT_TO_DATE
, PPR.OTH_QUANTITY_TO_DATE)- NVL(PA_PROGRESS_UTILS.GET_ACT_FOR_PREV_ASOFDATE(PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID
, 'E'
, NULL
, NULL)
, 0) ACTUAL_EFFORT_THIS_PERIOD
, DECODE(PTAV.RESOURCE_CLASS_CODE
, 'PEOPLE'
, PPR.PPL_ACT_COST_TO_DATE_TC
, 'EQUIPMENT'
, PPR.EQPMT_ACT_COST_TO_DATE_TC
, PPR.OTH_ACT_COST_TO_DATE_TC) -NVL(PA_PROGRESS_UTILS.GET_ACT_FOR_PREV_ASOFDATE(PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID
, 'C'
, 'B'
, 'T')
, 0) ACTUAL_COST_THIS_PERIOD
, PA_PROGRESS_UTILS.GET_LATEST_PROGRESS_ENTRY_DATE(PPA.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_TYPE
, PPR.STRUCTURE_TYPE
, PPE.PROJ_ELEMENT_ID) LATEST_PROGRESS_DATE
, PPEV.PARENT_STRUCTURE_VERSION_ID STRUCTURE_VERSION_ID
, PA_PROGRESS_UTILS.GET_ACT_FOR_PREV_ASOFDATE(PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID
, 'C'
, 'R'
, 'T') ACTUAL_RAWCOST
, NVL(PTAV.PLANNED_RAW_COST_TXN_CUR
, 0) PLANNED_RAWCOST
, PTAV.BL_PLANNED_RAW_COST_TXN_CUR BASELINED_RAWCOST
, NVL(PPR.OTH_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, 0) +PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_RAW_COST_TXN_CUR
, PPR.PPL_ETC_RAWCOST_TC
, PPR.EQPMT_ETC_RAWCOST_TC
, PPR.OTH_ETC_RAWCOST_TC
, NULL
, NULL
, NULL
, NULL
, (NVL(PPR.OTH_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, 0))) EST_AT_COMPLETION_RAWCOST
, PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_RAW_COST_TXN_CUR
, PPR.PPL_ETC_RAWCOST_TC
, PPR.EQPMT_ETC_RAWCOST_TC
, PPR.OTH_ETC_RAWCOST_TC
, NULL
, NULL
, NULL
, NULL
, (NVL(PPR.OTH_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, 0))) ETC_RAWCOST_TC
, PA_PROGRESS_UTILS.PERCENT_COMPLETE_VALUE( (NVL(PPR.OTH_ACT_RAWCOST_TO_DATE_TC
, 0)+NVL(PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 0) +NVL(PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, 0))
, ( NVL(PPR.OTH_ETC_RAWCOST_TC
, 0)+NVL(PPR.PPL_ETC_RAWCOST_TC
, 0)+NVL(PPR.EQPMT_ETC_RAWCOST_TC
, 0)) ) PERCENT_COMPLETE_RAWCOST
, PA_PROGRESS_UTILS.PERCENT_SPENT_VALUE( (NVL(PPR.OTH_ACT_COST_TO_DATE_PC
, 0)+NVL(PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 0) +NVL(PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, 0))
, (NVL(PTAV.PLANNED_RAW_COST_TXN_CUR
, 0)) ) PERCENT_SPENT_RAWCOST
, DECODE(PTAV.RESOURCE_CLASS_CODE
, 'PEOPLE'
, PPR.PPL_ACT_RAWCOST_TO_DATE_TC
, 'EQUIPMENT'
, PPR.EQPMT_ACT_RAWCOST_TO_DATE_TC
, PPR.OTH_ACT_RAWCOST_TO_DATE_TC) - NVL(PA_PROGRESS_UTILS.GET_ACT_FOR_PREV_ASOFDATE(PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID
, 'C'
, 'R'
, 'T')
, 0) ACTUAL_RAWCOST_THIS_PERIOD
, PTAV.UNPLANNED_FLAG UNPLANNED_ASSIGNMENTS_FLAG
, NVL(PTAV.PLANNED_BUR_COST_PROJ_CUR
, 0) PLANNED_COST_BUR_PC
, PA_PROGRESS_UTILS.GET_ACT_FOR_PREV_ASOFDATE(PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID
, 'C'
, 'B'
, 'P') ACTUAL_COST_BUR_PC
, DECODE(PTAV.RESOURCE_CLASS_CODE
, 'PEOPLE'
, PPR.PPL_ACT_COST_TO_DATE_PC
, 'EQUIPMENT'
, PPR.EQPMT_ACT_COST_TO_DATE_PC
, PPR.OTH_ACT_COST_TO_DATE_PC) - NVL(PA_PROGRESS_UTILS.GET_ACT_FOR_PREV_ASOFDATE(PPR.AS_OF_DATE
, PPR.PROJECT_ID
, PPR.OBJECT_ID
, PPR.OBJECT_VERSION_ID
, PPR.PROJ_ELEMENT_ID
, 'C'
, 'B'
, 'P')
, 0) ACTUAL_COST_THIS_BUR_PC
, PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_BUR_COST_PROJ_CUR
, PPR.PPL_ETC_COST_PC
, PPR.EQPMT_ETC_COST_PC
, PPR.OTH_ETC_COST_PC
, NULL
, NULL
, NULL
, NULL
, (NVL(PPR.OTH_ACT_COST_TO_DATE_PC
, 0)+NVL(PPR.PPL_ACT_COST_TO_DATE_PC
, 0)+NVL(PPR.EQPMT_ACT_COST_TO_DATE_PC
, 0))) ETC_COST_BUR_PC
, NVL(PPR.OTH_ACT_COST_TO_DATE_PC
, 0)+NVL(PPR.PPL_ACT_COST_TO_DATE_PC
, 0)+NVL(PPR.EQPMT_ACT_COST_TO_DATE_PC
, 0) +PA_PROGRESS_UTILS.SUM_ETC_VALUES(PTAV.PLANNED_BUR_COST_PROJ_CUR
, PPR.PPL_ETC_COST_PC
, PPR.EQPMT_ETC_COST_PC
, PPR.OTH_ETC_COST_PC
, NULL
, NULL
, NULL
, NULL
, (NVL(PPR.OTH_ACT_COST_TO_DATE_PC
, 0)+NVL(PPR.PPL_ACT_COST_TO_DATE_PC
, 0)+NVL(PPR.EQPMT_ACT_COST_TO_DATE_PC
, 0))) EST_AT_COMPLETION_COST_BUR_PC
, PPR.PROGRESS_ROLLUP_ID
, PPA.PROJECT_CURRENCY_CODE
, PPR.CURRENT_FLAG PPR_CURRENT_FLAG
, PA_PROGRESS_UTILS.PERCENT_COMPLETE_VALUE(DECODE(PTAV.RESOURCE_CLASS_CODE
, 'PEOPLE'
, NVL(PPR.PPL_ACT_COST_TO_DATE_PC
, 0)
, 'EQUIPMENT'
, NVL(PPR.EQPMT_ACT_COST_TO_DATE_PC
, 0)
, NVL(PPR.OTH_ACT_COST_TO_DATE_PC
, 0))
, DECODE(PTAV.RESOURCE_CLASS_CODE
, 'PEOPLE'
, NVL(PPR.PPL_ETC_COST_PC
, DECODE( SIGN(NVL(PTAV.PLANNED_BUR_COST_PROJ_CUR
, 0)-NVL(PPR.PPL_ACT_COST_TO_DATE_PC
, 0))
, -1
, 0
, NVL( PTAV.PLANNED_BUR_COST_PROJ_CUR-PPR.PPL_ACT_COST_TO_DATE_PC
, 0)))
, 'EQUIPMENT'
, NVL(PPR.EQPMT_ETC_COST_PC
, DECODE( SIGN(NVL(PTAV.PLANNED_BUR_COST_PROJ_CUR
, 0)-NVL(PPR.EQPMT_ACT_COST_TO_DATE_PC
, 0))
, -1
, 0
, NVL( PTAV.PLANNED_BUR_COST_PROJ_CUR-PPR.EQPMT_ACT_COST_TO_DATE_PC
, 0)))
, NVL(PPR.OTH_ETC_COST_PC
, DECODE( SIGN(NVL(PTAV.PLANNED_BUR_COST_PROJ_CUR
, 0)-NVL(PPR.OTH_ACT_COST_TO_DATE_PC
, 0))
, -1
, 0
, NVL( PTAV.PLANNED_BUR_COST_PROJ_CUR-PPR.OTH_ACT_COST_TO_DATE_PC
, 0)))))PERCENT_COMPLETE_BUR_COST_PC
, PA_PROGRESS_UTILS.PERCENT_SPENT_VALUE( (NVL(PPR.OTH_ACT_COST_TO_DATE_PC
, 0)+NVL(PPR.PPL_ACT_COST_TO_DATE_PC
, 0) +NVL(PPR.EQPMT_ACT_COST_TO_DATE_PC
, 0))
, (NVL(PTAV.PLANNED_BUR_COST_PROJ_CUR
, 0)) ) PERCENT_SPENT_BUR_COST_PC
, PPC.PROGRESS_COMMENT
, PPC.DESCRIPTION
FROM PA_PROJECTS_ALL PPA
, PA_PROJ_ELEMENTS PPE
, PA_PROJ_ELEMENT_VERSIONS PPEV
, PA_PROJ_ELEM_VER_STRUCTURE PPVS
, PA_PERCENT_COMPLETES PPC
, PA_PROGRESS_ROLLUP PPR
, PA_PROJ_PROGRESS_ATTR PPPA
, PA_TASK_TYPES PTT
, PA_TASK_ASGMTS_V PTAV
WHERE PPE.PROJECT_ID = PPVS.PROJECT_ID
AND PPVS.LATEST_EFF_PUBLISHED_FLAG = 'Y'
AND PPE.LINK_TASK_FLAG = 'N'
AND PPE.OBJECT_TYPE = 'PA_TASKS'
AND PPE.PROJ_ELEMENT_ID = PPEV.PROJ_ELEMENT_ID
AND PPEV.PARENT_STRUCTURE_VERSION_ID = PPVS.ELEMENT_VERSION_ID
AND PPA.PROJECT_ID = PPVS.PROJECT_ID
AND PPE.TYPE_ID = PTT.TASK_TYPE_ID(+)
AND PTT.OBJECT_TYPE(+) = 'PA_TASKS'
AND PTAV.PROJECT_ID = PPE.PROJECT_ID
AND PTAV.TASK_ID = PPE.PROJ_ELEMENT_ID
AND PTAV.TASK_VERSION_ID = PPEV.ELEMENT_VERSION_ID
AND PTAV.PROJECT_ID = PPR.PROJECT_ID(+)
AND PTAV.RESOURCE_LIST_MEMBER_ID = PPR.OBJECT_ID(+)
AND PTAV.TASK_ID = PPR.PROJ_ELEMENT_ID(+)
AND PPC.PROJECT_ID(+) = PPR.PROJECT_ID
AND PPC.OBJECT_ID(+) = PPR.OBJECT_ID
AND PPC.OBJECT_TYPE(+) = 'PA_ASSIGNMENTS'
AND PPC.TASK_ID(+) = PPR.PROJ_ELEMENT_ID
AND 'PA_ASSIGNMENTS' = PPR.OBJECT_TYPE(+)
AND PPR.STRUCTURE_VERSION_ID(+) IS NULL
AND PPC.STRUCTURE_TYPE(+) = 'WORKPLAN'
AND PPR.STRUCTURE_TYPE(+) = 'WORKPLAN'
AND PPR.STRUCTURE_VERSION_ID(+) IS NULL
AND PPR.PERCENT_COMPLETE_ID = PPC.PERCENT_COMPLETE_ID(+)
AND PPR.PROGRESS_ROLLUP_ID(+) = PA_PROGRESS_UTILS.GET_W_PUB_PRUPID_ASOFDATE(PTAV.PROJECT_ID
, PTAV.RESOURCE_LIST_MEMBER_ID
, 'PA_ASSIGNMENTS'
, PTAV.TASK_ID
, PA_PROGRESS_UTILS.GET_PROG_ASOFDATE()
, 'Y')
AND PPVS.PROJECT_ID = PPPA.PROJECT_ID(+)
AND PPVS.PROJ_ELEMENT_ID = PPPA.OBJECT_ID(+)
AND PPPA.STRUCTURE_TYPE(+) = 'WORKPLAN'
AND PTAV.TA_DISPLAY_FLAG = 'Y'

Columns

Name
ACTUAL_COST
ACTUAL_EFFORT
ACTUAL_FINISH_DATE
ACTUAL_START_DATE
AS_OF_DATE
BASELINE_FINISH_DATE
BASELINE_START_DATE
EST_AT_COMPLETION_COST
EST_AT_COMPLETION_EFFORT
EST_REMAINING_EFFORT
ESTIMATED_FINISH_DATE
ESTIMATED_START_DATE
ETC_COST_TC
ETC_EFFORT
NEXT_PROGRESS_DUE_DATE
DEFAULT_AS_OF_DATE
PERCENT_COMPLETE_EFFORT
PERCENT_COMPLETE_ID
PERCENT_SPENT_EFFORT
PLANNED_COST
PLANNED_EFFORT
SCHEDULED_FINISH_DATE
SCHEDULED_START_DATE
TASK_ID
TASK_NAME
TASK_NUMBER
UNIT_OF_MEASURE
WBS_NUMBER
RESOURCE_ASSIGNMENT_ID
CURRENT_FLAG
ELEMENT_VERSION_ID
OBJECT_TYPE
PROJ_ELEMENT_ID
PROJECT_ID
PROJECT_NAME
PROJECT_NUMBER
PUBLISHED_FLAG
RECORD_VERSION_NUMBER
UOM_CODE
UOM_DESCRIPTION
TXN_CURRENCY_CODE
EFFORT_ENABLED_FLAG
PROG_ENTRY_ENABLE_FLAG
RESOURCE_ALIAS
RESOURCE_LIST_MEMEBER_ID
RESOURCE_CLASS_CODE
RBS_ELEMENT_ID
RATE_BASED_FLAG
ACTUAL_EFFORT_THIS_PERIOD
ACTUAL_COST_THIS_PERIOD
LATEST_PROGRESS_DATE
STRUCTURE_VERSION_ID
ACTUAL_RAWCOST
PLANNED_RAWCOST
BASELINED_RAWCOST
EST_AT_COMPLETION_RAWCOST
ETC_RAWCOST_TC
PERCENT_COMPLETE_RAWCOST
PERCENT_SPENT_RAWCOST
ACTUAL_RAWCOST_THIS_PERIOD
UNPLANNED_ASSIGNMENTS_FLAG
PLANNED_COST_BUR_PC
ACTUAL_COST_BUR_PC
ACTUAL_COST_THIS_BUR_PC
ETC_COST_BUR_PC
EST_AT_COMPLETION_COST_BUR_PC
PROGRESS_ROLLUP_ID
PROJECT_CURRENCY_CODE
PPR_CURRENT_FLAG
PERCENT_COMPLETE_BUR_COST_PC
PERCENT_SPENT_BUR_COST_PC
PROGRESS_COMMENT
PROGRESS_OVERVIEW