DBA Data[Home] [Help]

APPS.PA_PROJ_STRUCTURE_PUB dependencies on PA_CURRENCY

Line 1381: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

1377: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
1378: nvl(ppru.ppl_act_cost_to_date_pc,0)+
1379: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(ppru.earned_value,0,1,ppru.earned_value))),2)
1380: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
1381: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
1382: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
1383: NVL(ppru.ppl_act_cost_to_date_pc,0)+
1384: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
1385: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance

Line 1382: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

1378: nvl(ppru.ppl_act_cost_to_date_pc,0)+
1379: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(ppru.earned_value,0,1,ppru.earned_value))),2)
1380: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
1381: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
1382: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
1383: NVL(ppru.ppl_act_cost_to_date_pc,0)+
1384: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
1385: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance
1386: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 1958: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

1954: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
1955: nvl(ppru.ppl_act_cost_to_date_pc,0)+
1956: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(ppru.earned_value,0,1,ppru.earned_value))),2)
1957: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
1958: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
1959: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
1960: NVL(ppru.ppl_act_cost_to_date_pc,0)+
1961: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
1962: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance

Line 1959: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

1955: nvl(ppru.ppl_act_cost_to_date_pc,0)+
1956: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(ppru.earned_value,0,1,ppru.earned_value))),2)
1957: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
1958: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
1959: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
1960: NVL(ppru.ppl_act_cost_to_date_pc,0)+
1961: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
1962: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance
1963: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 2771: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

2767: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
2768: nvl(ppru.ppl_act_cost_to_date_pc,0)+
2769: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(ppru.earned_value,0,1,ppru.earned_value))),2)
2770: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
2771: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
2772: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
2773: NVL(ppru.ppl_act_cost_to_date_pc,0)+
2774: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
2775: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance

Line 2772: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

2768: nvl(ppru.ppl_act_cost_to_date_pc,0)+
2769: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(ppru.earned_value,0,1,ppru.earned_value))),2)
2770: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
2771: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
2772: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
2773: NVL(ppru.ppl_act_cost_to_date_pc,0)+
2774: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
2775: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance
2776: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 3351: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

3347: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
3348: nvl(ppru.ppl_act_cost_to_date_pc,0)+
3349: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(ppru.earned_value,0,1,ppru.earned_value))),2)
3350: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
3351: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
3352: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
3353: NVL(ppru.ppl_act_cost_to_date_pc,0)+
3354: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
3355: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance

Line 3352: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

3348: nvl(ppru.ppl_act_cost_to_date_pc,0)+
3349: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(ppru.earned_value,0,1,ppru.earned_value))),2)
3350: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
3351: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
3352: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
3353: NVL(ppru.ppl_act_cost_to_date_pc,0)+
3354: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
3355: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance
3356: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 4226: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

4222: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
4223: nvl(ppru.ppl_act_cost_to_date_pc,0)+
4224: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(ppru.earned_value,0,1,ppru.earned_value))),2)
4225: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
4226: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
4227: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
4228: NVL(ppru.ppl_act_cost_to_date_pc,0)+
4229: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
4230: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance

Line 4227: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

4223: nvl(ppru.ppl_act_cost_to_date_pc,0)+
4224: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(ppru.earned_value,0,1,ppru.earned_value))),2)
4225: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
4226: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
4227: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
4228: NVL(ppru.ppl_act_cost_to_date_pc,0)+
4229: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
4230: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance
4231: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 4801: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

4797: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
4798: nvl(ppru.ppl_act_cost_to_date_pc,0)+
4799: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(ppru.earned_value,0,1,ppru.earned_value))),2)
4800: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
4801: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
4802: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
4803: NVL(ppru.ppl_act_cost_to_date_pc,0)+
4804: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
4805: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance

Line 4802: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

4798: nvl(ppru.ppl_act_cost_to_date_pc,0)+
4799: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(ppru.earned_value,0,1,ppru.earned_value))),2)
4800: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
4801: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
4802: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
4803: NVL(ppru.ppl_act_cost_to_date_pc,0)+
4804: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
4805: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance
4806: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 5832: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

5828: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
5829: nvl(ppru.ppl_act_cost_to_date_pc,0)+
5830: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
5831: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
5832: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
5833: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
5834: NVL(ppru.ppl_act_cost_to_date_pc,0)+
5835: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
5836: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance

Line 5833: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

5829: nvl(ppru.ppl_act_cost_to_date_pc,0)+
5830: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
5831: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
5832: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
5833: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
5834: NVL(ppru.ppl_act_cost_to_date_pc,0)+
5835: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
5836: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance
5837: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 6658: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

6654: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
6655: nvl(ppru.ppl_act_cost_to_date_pc,0)+
6656: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
6657: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
6658: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
6659: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
6660: NVL(ppru.ppl_act_cost_to_date_pc,0)+
6661: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
6662: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance

Line 6659: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

6655: nvl(ppru.ppl_act_cost_to_date_pc,0)+
6656: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
6657: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
6658: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
6659: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
6660: NVL(ppru.ppl_act_cost_to_date_pc,0)+
6661: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
6662: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance
6663: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 7485: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

7481: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
7482: nvl(ppru.ppl_act_cost_to_date_pc,0)+
7483: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
7484: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
7485: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
7486: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
7487: NVL(ppru.ppl_act_cost_to_date_pc,0)+
7488: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
7489: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance

Line 7486: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

7482: nvl(ppru.ppl_act_cost_to_date_pc,0)+
7483: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
7484: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
7485: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
7486: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
7487: NVL(ppru.ppl_act_cost_to_date_pc,0)+
7488: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
7489: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance
7490: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 8436: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

8432: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
8433: nvl(ppru.ppl_act_cost_to_date_pc,0)+
8434: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
8435: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
8436: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
8437: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
8438: NVL(ppru.ppl_act_cost_to_date_pc,0)+
8439: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
8440: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance

Line 8437: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

8433: nvl(ppru.ppl_act_cost_to_date_pc,0)+
8434: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
8435: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
8436: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
8437: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
8438: NVL(ppru.ppl_act_cost_to_date_pc,0)+
8439: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
8440: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance
8441: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 8927: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

8923: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
8924: nvl(ppru.ppl_act_cost_to_date_pc,0)+
8925: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
8926: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
8927: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
8928: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
8929: NVL(ppru.ppl_act_cost_to_date_pc,0)+
8930: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
8931: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance

Line 8928: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

8924: nvl(ppru.ppl_act_cost_to_date_pc,0)+
8925: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
8926: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
8927: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
8928: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
8929: NVL(ppru.ppl_act_cost_to_date_pc,0)+
8930: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
8931: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance
8932: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 9435: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

9431: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
9432: nvl(ppru.ppl_act_cost_to_date_pc,0)+
9433: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
9434: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
9435: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
9436: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
9437: NVL(ppru.ppl_act_cost_to_date_pc,0)+
9438: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
9439: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance

Line 9436: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

9432: nvl(ppru.ppl_act_cost_to_date_pc,0)+
9433: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
9434: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
9435: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
9436: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
9437: NVL(ppru.ppl_act_cost_to_date_pc,0)+
9438: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
9439: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance
9440: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 10323: ,null --pa_currency.round_trans_currency_amt((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit

10319: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
10320: nvl(ppru.ppl_act_cost_to_date_pc,0)+
10321: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(ppru.earned_value,0,1,ppru.earned_value))),2)
10322: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
10323: ,null --pa_currency.round_trans_currency_amt((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit
10324: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
10325: NVL(ppru.ppl_act_cost_to_date_pc,0)+
10326: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
10327: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance

Line 10324: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

10320: nvl(ppru.ppl_act_cost_to_date_pc,0)+
10321: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(ppru.earned_value,0,1,ppru.earned_value))),2)
10322: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),2) ETC_Work_Quantity
10323: ,null --pa_currency.round_trans_currency_amt((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit
10324: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
10325: NVL(ppru.ppl_act_cost_to_date_pc,0)+
10326: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
10327: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),2) Work_Quantity_Variance
10328: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 11082: ,null --pa_currency.round_trans_currency_amt((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit

11078: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
11079: nvl(ppru.ppl_act_cost_to_date_pc,0)+
11080: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
11081: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
11082: ,null --pa_currency.round_trans_currency_amt((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit
11083: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
11084: NVL(ppru.ppl_act_cost_to_date_pc,0)+
11085: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
11086: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance

Line 11083: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

11079: nvl(ppru.ppl_act_cost_to_date_pc,0)+
11080: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
11081: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
11082: ,null --pa_currency.round_trans_currency_amt((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit
11083: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
11084: NVL(ppru.ppl_act_cost_to_date_pc,0)+
11085: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
11086: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance
11087: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 11950: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

11946: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
11947: nvl(ppru.ppl_act_cost_to_date_pc,0)+
11948: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
11949: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
11950: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
11951: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
11952: NVL(ppru.ppl_act_cost_to_date_pc,0)+
11953: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
11954: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance

Line 11951: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

11947: nvl(ppru.ppl_act_cost_to_date_pc,0)+
11948: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
11949: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
11950: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
11951: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
11952: NVL(ppru.ppl_act_cost_to_date_pc,0)+
11953: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
11954: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance
11955: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 12778: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

12774: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
12775: nvl(ppru.ppl_act_cost_to_date_pc,0)+
12776: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
12777: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
12778: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
12779: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
12780: NVL(ppru.ppl_act_cost_to_date_pc,0)+
12781: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
12782: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance

Line 12779: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

12775: nvl(ppru.ppl_act_cost_to_date_pc,0)+
12776: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
12777: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
12778: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
12779: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
12780: NVL(ppru.ppl_act_cost_to_date_pc,0)+
12781: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
12782: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance
12783: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 13607: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

13603: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
13604: nvl(ppru.ppl_act_cost_to_date_pc,0)+
13605: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
13606: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
13607: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
13608: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
13609: NVL(ppru.ppl_act_cost_to_date_pc,0)+
13610: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
13611: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance

Line 13608: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

13604: nvl(ppru.ppl_act_cost_to_date_pc,0)+
13605: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
13606: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
13607: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
13608: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
13609: NVL(ppru.ppl_act_cost_to_date_pc,0)+
13610: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
13611: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance
13612: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 14532: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

14528: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
14529: nvl(ppru.ppl_act_cost_to_date_pc,0)+
14530: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
14531: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
14532: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
14533: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
14534: NVL(ppru.ppl_act_cost_to_date_pc,0)+
14535: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
14536: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance

Line 14533: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

14529: nvl(ppru.ppl_act_cost_to_date_pc,0)+
14530: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
14531: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
14532: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
14533: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
14534: NVL(ppru.ppl_act_cost_to_date_pc,0)+
14535: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
14536: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance
14537: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 15329: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

15325: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
15326: nvl(ppru.ppl_act_cost_to_date_pc,0)+
15327: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
15328: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
15329: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
15330: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
15331: NVL(ppru.ppl_act_cost_to_date_pc,0)+
15332: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
15333: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance

Line 15330: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

15326: nvl(ppru.ppl_act_cost_to_date_pc,0)+
15327: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
15328: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
15329: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
15330: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
15331: NVL(ppru.ppl_act_cost_to_date_pc,0)+
15332: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
15333: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance
15334: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent

Line 16127: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352

16123: ,round((((NVL(ppru.earned_value,0))-(nvl(ppru.oth_act_cost_to_date_pc,0)+
16124: nvl(ppru.ppl_act_cost_to_date_pc,0)+
16125: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
16126: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
16127: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
16128: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
16129: NVL(ppru.ppl_act_cost_to_date_pc,0)+
16130: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
16131: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance

Line 16128: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+

16124: nvl(ppru.ppl_act_cost_to_date_pc,0)+
16125: nvl(ppru.eqpmt_act_cost_to_date_pc,0)))/(DECODE(NVL(ppru.earned_value,0),0,1,NVL(ppru.earned_value,0)))),2)
16126: ,round((NVL(ppvsch.wq_planned_quantity,0) - NVL(CUMULATIVE_WORK_QUANTITY,0)),5) ETC_Work_Quantity
16127: ,pa_currency.round_trans_currency_amt1((nvl(pfxat.prj_brdn_cost,0)/decode(nvl(cumulative_work_quantity,0),0,1,nvl(cumulative_work_quantity,0))),ppa.project_currency_code) Planned_Cost_Per_Unit -- 4195352
16128: ,pa_currency.round_trans_currency_amt1((NVL((NVL(ppru.oth_act_cost_to_date_pc,0)+
16129: NVL(ppru.ppl_act_cost_to_date_pc,0)+
16130: NVL(ppru.eqpmt_act_cost_to_date_pc,0)),0)/DECODE(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0),0,1,ppru.CUMULATIVE_WORK_QUANTITY)),ppa.project_currency_code) Actual_Cost_Per_Unit -- 4195352
16131: ,round((NVL(NVL(ppru.CUMULATIVE_WORK_QUANTITY,0)-NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0)),5) Work_Quantity_Variance
16132: ,round((((ppru.CUMULATIVE_WORK_QUANTITY-ppvsch.WQ_PLANNED_QUANTITY)/DECODE(NVL(ppvsch.WQ_PLANNED_QUANTITY,0),0,1,ppvsch.WQ_PLANNED_QUANTITY))*100),2) Work_Quantity_Variance_Percent