PACKAGE: APPS.PA_TASK_ASSIGNMENTS_PUB

Source


1 PACKAGE PA_TASK_ASSIGNMENTS_PUB AUTHID CURRENT_USER AS
2 -- $Header: PATAPUBS.pls 120.6.12020000.2 2013/04/04 07:31:28 djambhek ship $
3 /*#
4  * This package contains the public APIs for project task resource information.
5  * @rep:scope public
6  * @rep:product PA
7  * @rep:lifecycle active
8  * @rep:displayname Task Assignments API
9  * @rep:compatibility S
10  * @rep:category BUSINESS_ENTITY PA_TASK_RESOURCE
11  * @rep:doccd 120pjapi.pdf See the Oracle Projects API's, Client Extensions, and Open Interfaces Reference
12 */
13 
14 TYPE assignment_in_rec_type IS RECORD
15 (  -- All parameters listed initially are used in creation and updation
16    --Either project reference or id is required
17    pm_project_reference       VARCHAR2(25)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
18   ,pa_project_id              NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
19   --Structure version id is required currently
20   ,pa_structure_version_id    NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
21   --Task reference or id is required
22   ,pm_task_reference          VARCHAR2(25)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
23   ,pa_task_id                 NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
24   ,pa_task_element_version_id NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
25    -- Task Asgmt. Reference is required for creation. Asgmt. Id or reference required for determination of updation.
26    -- Task Assignment Reference can be created but not updated.
27   ,pm_task_asgmt_reference    VARCHAR2(30)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
28   ,pa_task_assignment_id      NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
29   ,resource_alias             VARCHAR2(80)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
30   -- Planning resource list member id required for creation
31   ,resource_list_member_id    NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
32   -- CBS element Id is mandatory for CBS enabled projects 16598322
33   ,cbs_element_id    NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
34   ,cost_code             VARCHAR2(240)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
35   ,start_date                 DATE           := PA_INTERFACE_UTILS_PUB.G_PA_MISS_DATE
36   ,end_date                   DATE           := PA_INTERFACE_UTILS_PUB.G_PA_MISS_DATE
37   ,planned_quantity           NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
38   ,planned_total_raw_cost     NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
39   ,planned_total_bur_cost     NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
40   ,currency_code              VARCHAR2(30)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
41   --This attribute is added for Bug 3948128: TA Delay CR by DHI
42   ,scheduled_delay            NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
43   --Following are flexfield parameters
44   ,attribute_category         VARCHAR2(30)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
45   ,attribute1                 VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
46   ,attribute2                 VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
47   ,attribute3                 VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
48   ,attribute4                 VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
49   ,attribute5                 VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
50   ,attribute6                 VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
51   ,attribute7                 VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
52   ,attribute8                 VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
53   ,attribute9                 VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
54   ,attribute10                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
55   ,attribute11                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
56   ,attribute12                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
57   ,attribute13                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
58   ,attribute14                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
59   ,attribute15                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
60   ,attribute16                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
61   ,attribute17                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
62   ,attribute18                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
63   ,attribute19                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
64   ,attribute20                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
65   ,attribute21                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
66   ,attribute22                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
67   ,attribute23                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
68   ,attribute24                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
69   ,attribute25                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
70   ,attribute26                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
71   ,attribute27                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
72   ,attribute28                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
73   ,attribute29                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
74   ,attribute30                VARCHAR2(150)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
75    -- Following parameters used  for update process only..........
76    --=============================================================
77   ,description                VARCHAR2(240)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
78   ,use_task_schedule_flag     VARCHAR2(1)    := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
79   --Rate Overrides.
80   ,raw_cost_rate_override     NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
81   ,burd_cost_rate_override    NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
82   ,billable_work_percent      NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
83   --Mfg cost type is converted to id if mfg cost type id is not provided
84   ,mfg_cost_type              VARCHAR2(10)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
85   ,mfg_cost_type_id           NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
86    -- Above parameters for update only..........
87    --===============================================================
88    --Pass in p_context of 'D' for explicit deletion
89    --Pass in p_context of 'F' for implicit deletion based on task assignments not passed on tasks.
90   ,p_context                  VARCHAR2(1)    := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
91  ,spread_curve_id            NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM			--Bug#8646853
92   ,spread_curve_name          varchar2(240)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR		--Bug#8646853
93   ,fixed_date                   DATE              := PA_INTERFACE_UTILS_PUB.G_PA_MISS_DATE         --Bug#8646853
94 );
95 
96 
97 
98 TYPE assignment_out_rec_type IS RECORD
99 (  pa_task_id                 NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
100   ,resource_alias             VARCHAR2(80) := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
101   ,resource_list_member_id    NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
102   ,cbs_element_id		      NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM -- Added for 16598322
103   ,pa_task_assignment_id      NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
104   ,return_status              VARCHAR2(1)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
105 );
106 
107 
108 
109 TYPE assignment_in_tbl_type IS TABLE OF assignment_in_rec_type
110       INDEX BY BINARY_INTEGER;
111 
112 TYPE assignment_out_tbl_type IS TABLE OF assignment_out_rec_type
113       INDEX BY BINARY_INTEGER;
114 
115 
116 TYPE ta_del_rec_type IS RECORD
117 (  pa_task_assignment_id         NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM,
118    pa_task_elem_version_id       NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM,
119    del_ta_flag                   VARCHAR2(1)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
120 );
121 
122 TYPE assignment_del_tbl_type IS TABLE OF ta_del_rec_type
123       INDEX BY BINARY_INTEGER;
124 
125 TYPE task_asgmt_del_type IS RECORD
126 (  pa_task_id                 NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM,
127    start_del_index            NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM,
128    end_del_index              NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM,
129    del_flag                   VARCHAR2(1)  := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
130 );
131 TYPE task_asgmt_del_tbl_type IS TABLE OF task_asgmt_del_type
132       INDEX BY BINARY_INTEGER;
133 
134 
135 TYPE assignment_periods_type IS RECORD
136 (  -- All parameters  are used after a task assignment is created for periodic data creation/updation.
137    pm_product_code                VARCHAR2(30)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR --SAME
138    --Either project reference or id is required
139   ,pm_project_reference       VARCHAR2(25)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
140   ,pa_project_id              NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
141   --Structure version id is required currently
142   ,pa_structure_version_id    NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
143   --Task reference or id is required
144   ,pm_task_reference          VARCHAR2(25)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
145   ,pa_task_id                 NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
146   ,pa_task_element_version_id NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
147   -- Task Asgmt. Reference is required for creation. Asgmt. Id or reference required for updation.
148   ,pm_task_asgmt_reference    VARCHAR2(25)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
149   ,pa_task_assignment_id      NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
150   ,resource_alias             VARCHAR2(80)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
151   -- Planning resource list member id required for creation
152   ,resource_list_member_id    NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
153     -- CBS element Id is mandatory for CBS enabled projects 16598322
154   ,cbs_element_id    NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
155   ,cost_code             VARCHAR2(240)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
156   --Name of the period if available
157   ,period_name                VARCHAR2(30)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
158   --Start date of the period
159   ,start_date                 DATE           := PA_INTERFACE_UTILS_PUB.G_PA_MISS_DATE
160   --End date of the period
161   ,end_date                   DATE           := PA_INTERFACE_UTILS_PUB.G_PA_MISS_DATE
162   ,quantity                   NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
163   ,txn_raw_cost               NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
164   ,txn_burdened_cost          NUMBER         := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
165   ,txn_currency_code          VARCHAR2(30)   := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
166 
167 );
168 
169 
170 TYPE assignment_periods_tbl_type IS TABLE OF assignment_periods_type
171       INDEX BY BINARY_INTEGER;
172 
173 --Temporary table below will be reinitialized at the end of every load cycle.
174 g_asgmts_periods_tbl  assignment_periods_tbl_type;
175 g_asgmts_periods_out_tbl  assignment_out_tbl_type;
176 g_asgmts_periods_tbl_count NUMBER;
177 
178 empty_asgmts_periods_tbl assignment_periods_tbl_type;
179 
180 --All type contained in paxdty01.sql , paxdty03.sql
181 
182 
183 -- global plsql tables of assignment records
184 g_task_asgmts_in_tbl assignment_in_tbl_type;
185 g_task_asgmts_out_tbl assignment_out_tbl_type;
186 
187 g_task_asgmts_tbl_count NUMBER;
188 
189 empty_task_asgmts_in_tbl assignment_in_tbl_type;
190 empty_task_asgmts_out_tbl assignment_out_tbl_type;
191 
192 /*#
193  * This API is used to load project task resources to a global PL/SQL table.
194  * @param p_commit API standard (default = F): indicates if the transaction will be committed
195  * @param p_init_msg_list API standard (default = F): indicates if message stack will be initialized
196  * @param p_api_version_number API standard: version number
197  * @param p_pm_project_reference Reference code that uniquely identifies the project in the external system
198  * @param p_pa_project_id Identifier of the project in the Oracle Projects
199  * @param p_pa_structure_version_id Identifier of the structure version in Oracle Projects
200  * @param p_pm_task_reference External task reference
201  * @param p_pa_task_id Identifier of the task in the Oracle Projects
202  * @param p_pa_task_element_version_id Identifier of the task version in the Oracle Projects
203  * @param p_pm_task_asgmt_reference External task resource reference
204  * @param p_pa_task_assignment_id Identifier of the task resource in Oracle Projects
205  * @param p_resource_alias Planning resource alias
206  * @param p_resource_list_member_id Identifier of the planning resource
207  * @param p_start_date Start date of the task resource assignment
208  * @param p_end_date End date of the task resource assignment
209  * @param p_planned_quantity Planned effort or quantity
210  * @param p_planned_total_raw_cost Planned row cost
211  * @param p_planned_total_bur_cost Planned burdened cost
212  * @param p_currency_code Currency code
213  * @param p_scheduled_delay Task Resource scheduled delay
214  * @param p_attribute_category Descriptive flexfield category
215  * @param p_attribute1 Descriptive flexfield attribute
216  * @param p_attribute2 Descriptive flexfield attribute
217  * @param p_attribute3 Descriptive flexfield attribute
218  * @param p_attribute4 Descriptive flexfield attribute
219  * @param p_attribute5 Descriptive flexfield attribute
220  * @param p_attribute6 Descriptive flexfield attribute
221  * @param p_attribute7 Descriptive flexfield attribute
222  * @param p_attribute8 Descriptive flexfield attribute
223  * @param p_attribute9 Descriptive flexfield attribute
224  * @param p_attribute10 Descriptive flexfield attribute
225  * @param p_attribute11 Descriptive flexfield attribute
226  * @param p_attribute12 Descriptive flexfield attribute
227  * @param p_attribute13 Descriptive flexfield attribute
228  * @param p_attribute14 Descriptive flexfield attribute
229  * @param p_attribute15 Descriptive flexfield attribute
230  * @param p_attribute16 Descriptive flexfield attribute
231  * @param p_attribute17 Descriptive flexfield attribute
232  * @param p_attribute18 Descriptive flexfield attribute
233  * @param p_attribute19 Descriptive flexfield attribute
234  * @param p_attribute20 Descriptive flexfield attribute
235  * @param p_attribute21 Descriptive flexfield attribute
236  * @param p_attribute22 Descriptive flexfield attribute
237  * @param p_attribute23 Descriptive flexfield attribute
238  * @param p_attribute24 Descriptive flexfield attribute
239  * @param p_attribute25 Descriptive flexfield attribute
240  * @param p_attribute26 Descriptive flexfield attribute
241  * @param p_attribute27 Descriptive flexfield attribute
242  * @param p_attribute28 Descriptive flexfield attribute
243  * @param p_attribute29 Descriptive flexfield attribute
244  * @param p_attribute30 Descriptive flexfield attribute
245  * @param up_description Description of the assignment (used only in update mode)
246  * @param up_use_task_schedule_flag Flag indicating whether the assignment dates and the task scheduled dates are the same (used only in update mode)
247  * @param up_raw_cost_rate_override Override raw cost rate (used only in update mode)
248  * @param up_burd_cost_rate_override Override burdened cost rate (used only in update mode)
249  * @param up_billable_work_percent Billable percent (used only in update mode)
250  * @param up_mfg_cost_type Manufacturing cost type (used only in update mode)
251  * @param up_mfg_cost_type_id Identifier of the manufacturing cost type (used only in update mode)
252  * @param p_context_flag Flag indicating whether the task assignments that are not passed on the tasks will be deleted
253  * @rep:paraminfo {@rep:precision 1}
254  * @param x_msg_count API standard: number of error messages
255  * @rep:paraminfo {@rep:required}
256  * @param x_msg_data API standard: error message
257  * @rep:paraminfo {@rep:precision 2000} {@rep:required}
258  * @param x_return_status API standard Return of the API success / failure / unexpected error
259  * @rep:paraminfo {@rep:precision 1} {@rep:required}
260  * @rep:scope public
261  * @rep:lifecycle active
262  * @rep:displayname Load Project Task Resources
263  * @rep:compatibility S
264 */
265 -- All parameters mentioned as p_ are for both create and update
266 -- All parameters mentioned as up_ are meant for updation.
267 PROCEDURE Load_Task_Assignments
268 ( p_api_version_number       IN NUMBER            := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
269  ,p_commit                               IN VARCHAR2          := FND_API.G_FALSE
270  ,p_init_msg_list                IN VARCHAR2          := FND_API.G_FALSE
271  ,p_pm_project_reference     IN PA_VC_1000_25     := PA_VC_1000_25(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
272  ,p_pa_project_id                IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
273  ,p_pa_structure_version_id      IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
274  ,p_pm_task_reference        IN PA_VC_1000_25     := PA_VC_1000_25(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
275  ,p_pa_task_id               IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
276  ,p_pa_task_element_version_id IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
277  ,p_pm_task_asgmt_reference  IN PA_VC_1000_25     := PA_VC_1000_25(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
278  ,p_pa_task_assignment_id    IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
279  ,p_resource_alias           IN PA_VC_1000_80     := PA_VC_1000_80(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
280  ,p_resource_list_member_id  IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
281  ,p_cbs_element_id  IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM) -- Added for CBS :16598322
282  ,p_start_date               IN PA_date_1000_date := PA_date_1000_date(PA_INTERFACE_UTILS_PUB.G_PA_MISS_DATE)
283  ,p_end_date                 IN PA_date_1000_date := PA_date_1000_date(PA_INTERFACE_UTILS_PUB.G_PA_MISS_DATE)
284  ,p_planned_quantity         IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
285  ,p_planned_total_raw_cost   IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
286  ,p_planned_total_bur_cost   IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
287  ,p_currency_code            IN PA_VC_1000_30     := PA_VC_1000_30(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
288  --This parameter is added for Bug 3948128: TA Delay CR by DHI
289  ,p_scheduled_delay          IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
290  ,p_attribute_category       IN PA_VC_1000_30     := PA_VC_1000_30(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
291  ,p_attribute1               IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
292  ,p_attribute2               IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
293  ,p_attribute3               IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
294  ,p_attribute4               IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
295  ,p_attribute5               IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
296  ,p_attribute6               IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
297  ,p_attribute7               IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
298  ,p_attribute8               IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
299  ,p_attribute9               IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
300  ,p_attribute10              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
301  ,p_attribute11              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
302  ,p_attribute12              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
303  ,p_attribute13              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
304  ,p_attribute14              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
305  ,p_attribute15              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
306  ,p_attribute16              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
307  ,p_attribute17              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
308  ,p_attribute18              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
309  ,p_attribute19              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
310  ,p_attribute20              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
311  ,p_attribute21              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
312  ,p_attribute22              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
313  ,p_attribute23              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
314  ,p_attribute24              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
315  ,p_attribute25              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
316  ,p_attribute26              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
317  ,p_attribute27              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
318  ,p_attribute28              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
319  ,p_attribute29              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
320  ,p_attribute30              IN PA_VC_1000_150    := PA_VC_1000_150(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
321  ,up_description             IN PA_VC_1000_240    := PA_VC_1000_240(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
322  ,up_use_task_schedule_flag  IN PA_VC_1000_1      := PA_VC_1000_1(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
323  ,up_raw_cost_rate_override  IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
324  ,up_burd_cost_rate_override IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
325  ,up_billable_work_percent   IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
326  ,up_mfg_cost_type           IN PA_VC_1000_10     := PA_VC_1000_10(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
327  ,up_mfg_cost_type_id        IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
328  ,p_context_flag             IN PA_VC_1000_1      := PA_VC_1000_1(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
329  ,x_msg_count                    OUT NOCOPY NUMBER
330  ,x_msg_data                     OUT NOCOPY VARCHAR2
331  ,x_return_status                    OUT NOCOPY VARCHAR2
332 ) ;
333 
334 /*#
335  * This API is used to load periodic data of project task resources to a global PL/SQL table.
336  * @param p_commit API standard (default = F): indicates if the transaction will be committed
337  * @param p_init_msg_list API standard (default = F): indicates if message stack will be initialized
338  * @param p_api_version_number API standard: version number
339  * @param p_pm_project_reference Reference code that uniquely identifies the project in the external system
340  * @param p_pa_project_id Identifier of the project in the Oracle Projects
341  * @param p_pa_structure_version_id Identifier of the structure version in Oracle Projects
342  * @param p_pm_task_reference External task reference
343  * @param p_pa_task_id Identifier of the task in the Oracle Projects
344  * @param p_pa_task_element_version_id Identifier of the task version in the Oracle Projects
345  * @param p_pm_task_asgmt_reference External task resource reference
346  * @param p_pa_task_assignment_id Identifier of the task resource in Oracle Projects
347  * @param p_resource_alias Planning resource alias
348  * @param p_resource_list_member_id Identifier of the planning resource
349  * @param p_period_name Name of the period
350  * @param p_start_date Start date of the period
351  * @param p_end_date End date of the period
352  * @param p_txn_quantity Planned effort or quantity for the period
353  * @param p_txn_raw_cost Planned raw cost for the period
354  * @param p_txn_bur_cost Planned burdened cost for the period
355  * @param p_currency_code Currency code
356  * @param x_msg_count API standard: number of error messages
357  * @rep:paraminfo {@rep:required}
358  * @param x_msg_data API standard: error message
359  * @rep:paraminfo {@rep:precision 2000} {@rep:required}
360  * @param x_return_status API standard Return of the API success / failure / unexpected error
361  * @rep:paraminfo {@rep:precision 1} {@rep:required}
362  * @rep:scope public
363  * @rep:lifecycle active
364  * @rep:displayname Load Periodic Data of Project Task Resources
365  * @rep:compatibility S
366 */
367 PROCEDURE Load_Task_Asgmt_Periods
368 ( p_api_version_number       IN NUMBER            := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
369  ,p_commit                               IN VARCHAR2          := FND_API.G_FALSE
370  ,p_init_msg_list                IN VARCHAR2          := FND_API.G_FALSE
371  ,p_pm_project_reference     IN PA_VC_1000_25     := PA_VC_1000_25(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
372  ,p_pa_project_id                IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
373  ,p_pa_structure_version_id      IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
374  ,p_pm_task_reference        IN PA_VC_1000_25     := PA_VC_1000_25(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
375  ,p_pa_task_id               IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
376  ,p_pa_task_element_version_id IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
377  ,p_pm_task_asgmt_reference  IN PA_VC_1000_25     := PA_VC_1000_25(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
378  ,p_pa_task_assignment_id    IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
379  ,p_resource_alias           IN PA_VC_1000_80     := PA_VC_1000_80(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
380  ,p_resource_list_member_id  IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
381  ,p_cbs_element_id  IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM) -- Added for CBS :16598322
382  --Name of the period if available
383  ,p_period_name              IN PA_VC_1000_30     := PA_VC_1000_30(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
384  --Start date of the period
385  ,p_start_date               IN PA_date_1000_date := PA_date_1000_date(PA_INTERFACE_UTILS_PUB.G_PA_MISS_DATE)
386  --End date of the period
387  ,p_end_date                 IN PA_date_1000_date := PA_date_1000_date(PA_INTERFACE_UTILS_PUB.G_PA_MISS_DATE)
388  ,p_txn_quantity             IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
389  ,p_txn_raw_cost             IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
390  ,p_txn_bur_cost             IN PA_num_1000_num   := PA_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
391  ,p_currency_code            IN PA_VC_1000_30     := PA_VC_1000_30(PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR)
392  ,x_msg_count                    OUT NOCOPY NUMBER
393  ,x_msg_data                     OUT NOCOPY VARCHAR2
394  ,x_return_status                    OUT NOCOPY VARCHAR2
395 );
396 
397 /*#
398  * This API is used to create project task resources using the data stored in the global tables.
399  * @param p_api_version_number API standard: version number
400  * @param p_commit API standard (default = F): indicates if the transaction will be committed
401  * @param p_init_msg_list API standard (default = F): indicates if message stack will be initialized
402  * @param p_pm_product_code Identifier of the external system from which the project was imported
403  * @rep:paraminfo {@rep:precision 25}
404  * @param p_pm_project_reference Reference code that uniquely identifies the project in the external system
405  * @param p_pa_project_id Identifier of the project in the Oracle Projects
406  * @param p_pa_structure_version_id Identifier of the structure version in Oracle Projects
407  * @param x_msg_count API standard: number of error messages
408  * @rep:paraminfo {@rep:required}
409  * @param x_msg_data API standard: error message
410  * @rep:paraminfo {@rep:precision 2000} {@rep:required}
411  * @param x_return_status API standard Return of the API success / failure / unexpected error
412  * @rep:paraminfo {@rep:precision 1} {@rep:required}
413  * @rep:scope public
414  * @rep:lifecycle active
415  * @rep:displayname Execute Create Project Task Resources
416  * @rep:compatibility S
417 */
418 PROCEDURE Execute_Create_Task_Asgmts
419 ( p_api_version_number        IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
420  ,p_commit                                IN  VARCHAR2     := FND_API.G_FALSE
421  ,p_init_msg_list                 IN  VARCHAR2     := FND_API.G_FALSE
422 -- Product Code is a required parameter
423  ,p_pm_product_code               IN  VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
424 --Either project reference or project id is required
425  ,p_pm_project_reference      IN  VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
426  ,p_pa_project_id             IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
427 --Structure version id is required
428  ,p_pa_structure_version_id   IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
429  ,x_msg_count                     OUT NOCOPY NUMBER
430  ,x_msg_data                      OUT NOCOPY VARCHAR2
431  ,x_return_status                     OUT NOCOPY VARCHAR2
432 );
433 
434 /*#
435  * This API is used to update project task resources using the data stored in the global tables.
436  * @param p_api_version_number API standard: version number
437  * @param p_commit API standard (default = F): indicates if the transaction will be committed
438  * @param p_init_msg_list API standard (default = F): indicates if message stack will be initialized
439  * @param p_pm_product_code Identifier of the external system from which the project was imported
440  * @rep:paraminfo {@rep:precision 25}
441  * @param p_pm_project_reference Reference code that uniquely identifies the project in the external system
442  * @param p_pa_project_id Identifier of the project in the Oracle Projects
443  * @param p_pa_structure_version_id Identifier of the structure version in Oracle Projects
444  * @param x_msg_count API standard: number of error messages
445  * @rep:paraminfo {@rep:required}
446  * @param x_msg_data API standard: error message
447  * @rep:paraminfo {@rep:precision 2000} {@rep:required}
448  * @param x_return_status API standard Return of the API success / failure / unexpected error
449  * @rep:paraminfo {@rep:precision 1} {@rep:required}
450  * @rep:scope public
451  * @rep:lifecycle active
452  * @rep:displayname Execute Update Project Task Resources
453  * @rep:compatibility S
454 */
455 PROCEDURE Execute_Update_Task_Asgmts
456 ( p_api_version_number        IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
457  ,p_commit                                IN  VARCHAR2     := FND_API.G_FALSE
458  ,p_init_msg_list                 IN  VARCHAR2     := FND_API.G_FALSE
459  -- Product Code is a required parameter
460  ,p_pm_product_code               IN  VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
461 --Either project reference or project id is required
462  ,p_pm_project_reference      IN  VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
463  ,p_pa_project_id             IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
464 --Structure version id is required
465  ,p_pa_structure_version_id   IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
466  ,x_msg_count                     OUT NOCOPY NUMBER
467  ,x_msg_data                      OUT NOCOPY VARCHAR2
468  ,x_return_status                     OUT NOCOPY VARCHAR2
469 );
470 
471 /*#
472  * This API is used to create project task resources using a table of task resource records.
473  * @param p_commit API standard (default = F): indicates if the transaction will be committed
474  * @param p_init_msg_list API standard (default = F): indicates if message stack will be initialized
475  * @param p_api_version_number API standard: version number
476  * @param p_pm_product_code Identifier of the external system from which the project was imported
477  * @rep:paraminfo {@rep:precision 25}
478  * @param p_pm_project_reference Reference code that uniquely identifies the project in the external system
479  * @param p_pa_project_id Identifier of the project in the Oracle Projects
480  * @param p_pa_structure_version_id Identifier of the structure version in Oracle Projects
481  * Oracle Projects
482  * @param p_task_assignments_in Input table of task resource detail records
483  * @rep:paraminfo {@rep:required}
484  * @param p_task_assignments_out Output table of task resource detail records
485  * @rep:paraminfo {@rep:required}
486  * @param x_msg_count API standard: number of error messages
487  * @rep:paraminfo {@rep:required}
488  * @param x_msg_data API standard: error message
489  * @rep:paraminfo {@rep:precision 2000} {@rep:required}
490  * @param x_return_status API standard Return of the API success / failure / unexpected error
491  * @rep:paraminfo {@rep:precision 1} {@rep:required}
492  * @rep:scope public
493  * @rep:lifecycle active
494  * @rep:displayname Create Project Task Resources
495  * @rep:compatibility S
496 */
497 PROCEDURE Create_Task_Assignments
498 ( p_api_version_number        IN   NUMBER            := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
499  ,p_commit                                IN   VARCHAR2      := FND_API.G_FALSE
500  ,p_init_msg_list                 IN   VARCHAR2      := FND_API.G_FALSE
501  -- Product Code is a required parameter
502  ,p_pm_product_code               IN  VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
503  --Either project reference or project id is required
504  ,p_pm_project_reference      IN  VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
505  ,p_pa_project_id             IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
506  --Structure version id is required
507  ,p_pa_structure_version_id   IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
508  ,p_task_assignments_in       IN   ASSIGNMENT_IN_TBL_TYPE
509  ,p_task_assignments_out      OUT  NOCOPY ASSIGNMENT_OUT_TBL_TYPE
510  ,x_msg_count                     OUT  NOCOPY NUMBER
511  ,x_msg_data                      OUT  NOCOPY VARCHAR2
512  ,x_return_status                     OUT  NOCOPY VARCHAR2
513 );
514 
515 
516 /*#
517  * This API is used to create project task resources and periodic data using a table of task resource records
518  * and a table of periodic data.
519  * @param p_commit API standard (default = F): indicates if the transaction will be committed
520  * @param p_init_msg_list API standard (default = F): indicates if message stack will be initialized
521  * @param p_api_version_number API standard: version number
522  * @param p_pm_product_code Identifier of the external system from which the project was imported
523  * @rep:paraminfo {@rep:precision 25}
524  * @param p_pm_project_reference Reference code that uniquely identifies the project in the external system
525  * @param p_pa_project_id Identifier of the project in the Oracle Projects
526  * @param p_pa_structure_version_id Identifier of the structure version in Oracle Projects
527  * @param p_task_assignments_in Input table of task resource detail records
528  * @rep:paraminfo {@rep:required}
529  * @param p_task_assignments_out Output table of task resource detail records
530  * @rep:paraminfo {@rep:required}
531  * @param p_task_assignment_periods_in Input table of task resource periodic data detail records
532  * @rep:paraminfo {@rep:required}
533  * @param p_task_assignment_periods_out Output table of task resource periodic data detail records
534  * @rep:paraminfo {@rep:required}
535  * @param x_msg_count API standard: number of error messages
536  * @rep:paraminfo {@rep:required}
537  * @param x_msg_data API standard: error message
538  * @rep:paraminfo {@rep:precision 2000} {@rep:required}
539  * @param x_return_status API standard Return of the API success / failure / unexpected error
540  * @rep:paraminfo {@rep:precision 1} {@rep:required}
541  * @rep:scope public
542  * @rep:lifecycle active
543  * @rep:displayname Create Project Task Resource and Periodic Data
544  * @rep:compatibility S
545 */
546 PROCEDURE Create_Task_Assignment_Periods
547 ( p_api_version_number          IN   NUMBER          := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
548  ,p_commit                                  IN   VARCHAR2            := FND_API.G_FALSE
549  ,p_init_msg_list                   IN   VARCHAR2            := FND_API.G_FALSE
550 -- Product Code is a required parameter
551  ,p_pm_product_code               IN  VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
552  --Either project reference or project id is required
553  ,p_pm_project_reference      IN  VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
554  ,p_pa_project_id             IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
555  --Structure version id is required
556  ,p_pa_structure_version_id   IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
557  ,p_task_assignments_in         IN   ASSIGNMENT_IN_TBL_TYPE
558  ,p_task_assignment_periods_in  IN   PA_TASK_ASSIGNMENTS_PUB.ASSIGNMENT_PERIODS_TBL_TYPE
559  ,p_task_assignments_out        OUT  NOCOPY ASSIGNMENT_OUT_TBL_TYPE
560  ,p_task_assignment_periods_out OUT  NOCOPY PA_TASK_ASSIGNMENTS_PUB.ASSIGNMENT_OUT_TBL_TYPE
561  ,x_msg_count                       OUT  NOCOPY NUMBER
562  ,x_msg_data                        OUT  NOCOPY VARCHAR2
563  ,x_return_status                       OUT  NOCOPY VARCHAR2
564 );
565 
566 /*#
567  * This API is used to update project task resources using a table of task resource records.
568  * @param p_commit API standard (default = F): indicates if the transaction will be committed
569  * @param p_init_msg_list API standard (default = F): indicates if message stack will be initialized
570  * @param p_api_version_number API standard: version number
571  * @param p_pm_product_code Identifier of the external system from which the project was imported
572  * @rep:paraminfo {@rep:precision 25}
573  * @param p_pm_project_reference Reference code that uniquely identifies the project in the external system
574  * @param p_pa_project_id Identifier of the project in the Oracle Projects
575  * @param p_pa_structure_version_id Identifier of the structure version in Oracle Projects
576  * @param p_task_assignments_in Input table of task resource detail records
577  * @rep:paraminfo {@rep:required}
578  * @param p_task_assignments_out Output table of task resource detail records
579  * @rep:paraminfo {@rep:required}
580  * @param x_msg_count API standard: number of error messages
581  * @rep:paraminfo {@rep:required}
582  * @param x_msg_data API standard: error message
583  * @rep:paraminfo {@rep:precision 2000} {@rep:required}
584  * @param x_return_status API standard Return of the API success / failure / unexpected error
585  * @rep:paraminfo {@rep:precision 1} {@rep:required}
586  * @rep:scope public
587  * @rep:lifecycle active
588  * @rep:displayname Update Project Task Resources
589  * @rep:compatibility S
590 */
591 PROCEDURE Update_Task_Assignments
592 ( p_api_version_number        IN  NUMBER           := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
593  ,p_commit                                IN  VARCHAR2     := FND_API.G_FALSE
594  ,p_init_msg_list                 IN  VARCHAR2     := FND_API.G_FALSE
595  -- Product Code is a required parameter
596  ,p_pm_product_code               IN  VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
597  --Either project reference or project id is required
598  ,p_pm_project_reference      IN  VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
599  ,p_pa_project_id             IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
600  --Structure version id is required
601  ,p_pa_structure_version_id   IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
602  ,p_task_assignments_in       IN  ASSIGNMENT_IN_TBL_TYPE
603  ,p_task_assignments_out      OUT NOCOPY ASSIGNMENT_OUT_TBL_TYPE
604  ,x_msg_count                     OUT NOCOPY NUMBER
605  ,x_msg_data                      OUT NOCOPY VARCHAR2
606  ,x_return_status                     OUT NOCOPY VARCHAR2
607 );
608 
609 /*#
610  * This API is used to delete project task resources using a table of task resource records.
611  * @param p_commit API standard (default = F): indicates if the transaction will be committed
612  * @param p_init_msg_list API standard (default = F): indicates if message stack will be initialized
613  * @param p_api_version_number API standard: version number
614  * @param p_pm_project_reference Reference code that uniquely identifies the project in the external system
615  * @param p_pa_project_id Identifier of the project in the Oracle Projects
616  * @param p_pa_structure_version_id Identifier of the structure version in Oracle Projects
617  * @param p_task_assignments_in Input table of task resource detail records
618  * @rep:paraminfo {@rep:required}
619  * @param x_msg_count API standard: number of error messages
620  * @rep:paraminfo {@rep:required}
621  * @param x_msg_data API standard: error message
622  * @rep:paraminfo {@rep:precision 2000} {@rep:required}
623  * @param x_return_status API standard Return of the API success / failure / unexpected error
624  * @rep:paraminfo {@rep:precision 1} {@rep:required}
625  * @rep:scope public
626  * @rep:lifecycle active
627  * @rep:displayname Delete Project Task Resources
628  * @rep:compatibility S
629 */
630 PROCEDURE Delete_Task_Assignments
631 ( p_api_version_number        IN  NUMBER           := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
632  ,p_commit                                IN  VARCHAR2     := FND_API.G_FALSE
633  ,p_init_msg_list                 IN  VARCHAR2     := FND_API.G_FALSE
634  --Either project reference or project id is required
635  ,p_pm_project_reference      IN  VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
636  ,p_pa_project_id             IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
637  --Structure version id is required
638  ,p_pa_structure_version_id   IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
639  --Pass in list of task assignment id's or references as information at a minimum
640  ,p_task_assignments_in       IN  ASSIGNMENT_IN_TBL_TYPE
641  ,x_msg_count                     OUT NOCOPY NUMBER
642  ,x_msg_data                      OUT NOCOPY VARCHAR2
643  ,x_return_status                     OUT NOCOPY VARCHAR2
644 );
645 
646 /*#
647  * This API is used to update project task resources and periodic data using a table of task resource records
648  * and a table of periodic data.
649  * @param p_commit API standard (default = F): indicates if the transaction will be committed
650  * @param p_init_msg_list API standard (default = F): indicates if message stack will be initialized
651  * @param p_api_version_number API standard: version number
652  * @param p_pm_product_code Identifier of the external system from which the project was imported
653  * @rep:paraminfo {@rep:precision 25}
654  * @param p_pm_project_reference Reference code that uniquely identifies the project in the external system
655  * @param p_pa_project_id Identifier of the project in the Oracle Projects
656  * @param p_pa_structure_version_id Identifier of the structure version in Oracle Projects
657  * @param p_task_assignments_in Input table of task resource detail records
658  * @rep:paraminfo {@rep:required}
659  * @param p_task_assignments_out Output table of task resource detail records
660  * @rep:paraminfo {@rep:required}
661  * @param p_task_assignment_periods_in Input table of task resource periodic data detail records
662  * @rep:paraminfo {@rep:required}
663  * @param p_task_assignment_periods_out Output table of task resource periodic data detail records
664  * @rep:paraminfo {@rep:required}
665  * @param x_msg_count API standard: number of error messages
666  * @rep:paraminfo {@rep:required}
667  * @param x_msg_data API standard: error message
668  * @rep:paraminfo {@rep:precision 2000} {@rep:required}
669  * @param x_return_status API standard Return of the API success / failure / unexpected error
670  * @rep:paraminfo {@rep:precision 1} {@rep:required}
671  * @rep:scope public
672  * @rep:lifecycle active
673  * @rep:displayname Update Project Task Resource and Periodic Data
674  * @rep:compatibility S
675 */
676 PROCEDURE Update_Task_Assignment_Periods
677 ( p_api_version_number          IN   NUMBER          := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
678  ,p_commit                                  IN   VARCHAR2            := FND_API.G_FALSE
679  ,p_init_msg_list                   IN   VARCHAR2            := FND_API.G_FALSE
680  -- Product Code is a required parameter
681  ,p_pm_product_code               IN  VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
682  --Either project reference or project id is required
683  ,p_pm_project_reference      IN  VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
684  ,p_pa_project_id             IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
685  --Structure version id is required
686  ,p_pa_structure_version_id   IN  NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
687  ,p_task_assignments_in         IN   ASSIGNMENT_IN_TBL_TYPE
688  ,p_task_assignment_periods_in  IN   PA_TASK_ASSIGNMENTS_PUB.ASSIGNMENT_PERIODS_TBL_TYPE
689  ,p_task_assignments_out        OUT  NOCOPY ASSIGNMENT_OUT_TBL_TYPE
690  ,p_task_assignment_periods_out OUT  NOCOPY PA_TASK_ASSIGNMENTS_PUB.ASSIGNMENT_OUT_TBL_TYPE
691  ,x_msg_count                       OUT  NOCOPY NUMBER
692  ,x_msg_data                        OUT  NOCOPY VARCHAR2
693  ,x_return_status                       OUT  NOCOPY VARCHAR2
694 );
695 
696 /*#
697  * This API is used to fetch output parameters related to project task resources.
698  * @param p_init_msg_list API standard (default = F): indicates if message stack will be initialized
699  * @param p_api_version_number API standard: version number
700  * @param p_task_asgmt_index Index of task resources to be retrieved
701  * @param p_pm_task_asgmt_reference External task resource reference
702  * @rep:paraminfo {@rep:required}
703  * @param p_pa_task_assignment_id Identifier of the task resource in Oracle Projects
704  * @rep:paraminfo {@rep:required}
705  * @param p_pm_task_reference External task reference
706  * @rep:paraminfo {@rep:required}
707  * @param p_pa_task_id Identifier of the task in Oracle Projects
708  * @rep:paraminfo {@rep:required}
709  * @param p_resource_alias Alias of the planning resource
710  * @rep:paraminfo {@rep:required}
711  * @param p_resource_list_member_id Identifier of the planning resource
712  * @rep:paraminfo {@rep:required}
713  * @param x_return_status API standard Return of the API success / failure / unexpected error
714  * @rep:paraminfo {@rep:precision 1} {@rep:required}
715  * @rep:scope public
716  * @rep:lifecycle active
717  * @rep:displayname Fetch Project Task Resources
718  * @rep:compatibility S
719 */
720 PROCEDURE Fetch_Task_Assignments
721 ( p_api_version_number      IN    NUMBER           := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
722  ,p_init_msg_list                   IN    VARCHAR2         := FND_API.G_FALSE
723  ,p_task_asgmt_index        IN    pa_num_1000_num  := pa_num_1000_num(PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM)
724  ,p_pm_task_asgmt_reference     OUT       NOCOPY pa_vc_1000_30
725  ,p_pa_task_assignment_id       OUT       NOCOPY pa_num_1000_num
726  ,p_pm_task_reference       OUT   NOCOPY pa_vc_1000_30
727  ,p_pa_task_id              OUT   NOCOPY pa_num_1000_num
728  ,p_resource_alias          OUT   NOCOPY pa_vc_1000_80
729  ,p_resource_list_member_id OUT   NOCOPY pa_num_1000_num
730   ,p_cbs_element_id OUT   NOCOPY pa_num_1000_num -- Added for CBS 16598322
731  ,x_return_status                   OUT   NOCOPY VARCHAR2
732 );
733 
734 /*#
735  * This API is used to convert project task resource reference of external system to a task resource identifier of
736  * Oracle Projects.
737  * @param p_pm_product_code Identifier of the external system from which the project was imported
738  * @rep:paraminfo {@rep:required}
739  * @param p_pa_project_id Identifier of the project in the Oracle Projects
740  * @rep:paraminfo {@rep:required}
741  * @param p_pa_structure_version_id Identifier of the structure version in Oracle Projects
742  * @rep:paraminfo {@rep:required}
743  * @param p_pa_task_id Identifier of the task in the Oracle Projects
744  * @rep:paraminfo {@rep:required}
745  * @param p_pa_task_elem_ver_id Identifier of the task version in the Oracle Projects
746  * @rep:paraminfo {@rep:required}
747  * @param p_pm_task_asgmt_reference External task resource reference
748  * @param p_pa_task_assignment_id Identifier of the task resource in Oracle Projects
749  * @param p_resource_alias Alias of the planning resource
750  * @param p_resource_list_member_id Identifier of the planning resource
751  * @param p_add_error_msg_flag API standard Flag to add error messages
752  * @param p_published_version_flag Published Version Flag
753  * @param x_pa_task_assignment_id Identifier of the task resource in Oracle Projects
754  * @rep:paraminfo {@rep:required}
755  * @param x_return_status API standard Return of the API success / failure / unexpected error
756  * @rep:paraminfo {@rep:precision 1} {@rep:required}
757  * @rep:scope public
758  * @rep:lifecycle active
759  * @rep:displayname Convert Project Task Resource Reference to Id
760  * @rep:compatibility S
761 */
762 PROCEDURE Convert_PM_TARef_To_ID
763 ( p_pm_product_code               IN VARCHAR2
764  ,p_pa_project_id             IN NUMBER
765  ,p_pa_structure_version_id   IN NUMBER
766  ,p_pa_task_id                IN NUMBER
767  ,p_pa_task_elem_ver_id       IN NUMBER
768  ,p_pm_task_asgmt_reference   IN VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
769  ,p_pa_task_assignment_id     IN NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
770  ,p_resource_alias            IN VARCHAR2     := PA_INTERFACE_UTILS_PUB.G_PA_MISS_CHAR
771  ,p_resource_list_member_id   IN NUMBER       := PA_INTERFACE_UTILS_PUB.G_PA_MISS_NUM
772   ,p_cbs_element_id   IN NUMBER := null -- Added for CBS 16598322
773  -- Bug 3937017 Added a new parameter p_add_error_msg_flag
774  ,p_add_error_msg_flag        IN VARCHAR2     DEFAULT 'Y'
775  -- Bug 3872176 Added a new parameter p_published_version_flag
776  ,p_published_version_flag     IN VARCHAR2     DEFAULT 'N'
777  ,x_pa_task_assignment_id     OUT  NOCOPY NUMBER
778  ,x_return_status                     OUT  NOCOPY VARCHAR2
779 ) ;
780 
781 
782 /*#
783  * This API procedure is used to initialize the project task resources global tables prior to
784  * Load-Execute-Fetch cycle.
785  * @rep:scope public
786  * @rep:lifecycle active
787  * @rep:displayname Initialize Project Task Resources
788  * @rep:compatibility S
789 */
790 PROCEDURE Init_Task_Assignments;
791 
792 
793 end PA_TASK_ASSIGNMENTS_PUB;