[Home] [Help]
[Dependency Information]
Object Name: | MRP_SYSTEM_ITEMS |
---|---|
Object Type: | TABLE |
Owner: | MRP |
FND Design Data: | ![]() |
Subobject Name: | |
Status: | VALID |
MRP_SYSTEM_ITEMS stores a copy of items planned by the planning
process. Most of the columns in MRP_SYSTEM_ITEMS correspond to
columns from the Oracle Inventory item master table, MTL_SYSTEM_ITEMS.
.
LOW_LEVEL_CODE stores the low level code of the item. This is
used to determine the order in which items are planned during the
planning process (see MRP_LOW_LEVEL_CODES for details).
.
Lead time is stored in several columns. The static leadtime, which is
based upon the lead time lot size and calculated by the lead time
rollup, is stored in the columns PREPROCESSING_LEAD_TIME,
POSTPROCESSING_LEAD_TIME and FULL_LEAD_TIME. The lead time rollup
also calculates CUMULATIVE_TOTAL_LEAD_TIME and
CUM_MANUFACTURING_LEAD_TIME.
.
PLAN_MAKE_BUY_CODE determines whether the planning process will plan
this item as a purchased item or a manufactured item.
.
The columns PLAN_START_DATE, PLAN_COMPLETION_DATE,
PLANNER_BATCH_NUMBER and PLANNER_STATUS_FLAG are used internally by
the Planner to coordinate the planning of items done by multiple
Planner Workers running in parallel.
.
The column INVENTORY_USE_UP_DATE is the date that the planning process
will exhaust current nettable inventories, based on projected gross
requirements.
.
This table is populated by the Snapshot, and is used by the Planner.
This table is derived mainly from MTL_SYSTEM_ITEMS.
Tablespace: | ![]() |
---|---|
PCT Free: | 10 |
PCT Used: |
Index | Type | Uniqueness | Tablespace | Column |
---|---|---|---|---|
MRP_SYSTEM_ITEMS_U1 | NORMAL | UNIQUE |
![]() |
![]() ![]() ![]() |
MRP_SYSTEM_ITEMS_N1 | NORMAL | NONUNIQUE |
![]() |
![]() ![]() ![]() ![]() |
MRP_SYSTEM_ITEMS_N2 | NORMAL | NONUNIQUE |
![]() |
![]() ![]() ![]() ![]() |
Name | Datatype | Length | Mandatory | Comments |
---|---|---|---|---|
INVENTORY_ITEM_ID | NUMBER | Yes | Inventory item identifier | |
ORGANIZATION_ID | NUMBER | Yes | Organization identifier | |
COMPILE_DESIGNATOR | VARCHAR2 | (10) | Yes | MPS, MRP or DRP plan identifier |
LAST_UPDATE_DATE | DATE | Yes | Standard Who column | |
LAST_UPDATED_BY | NUMBER | Yes | Standard Who column | |
CREATION_DATE | DATE | Yes | Standard Who column | |
CREATED_BY | NUMBER | Yes | Standard Who column | |
IN_SOURCE_PLAN | NUMBER | Whether the item is planned in the source plan or not | ||
LAST_UPDATE_LOGIN | NUMBER | Standard Who column | ||
INVENTORY_TYPE | NUMBER | Yes | Inventory type code | |
MRP_PLANNING_CODE | NUMBER | Yes | Item MPS schedule type code | |
INVENTORY_PLANNING_CODE | NUMBER | Yes | Inventory planning code | |
LOW_LEVEL_CODE | NUMBER | Yes | Inventory item identifier low level code | |
PREPROCESSING_LEAD_TIME | NUMBER | Preprocessing lead time | ||
POSTPROCESSING_LEAD_TIME | NUMBER | Postprocessing lead time | ||
FULL_LEAD_TIME | NUMBER | Yes | Full lead time | |
CUMULATIVE_TOTAL_LEAD_TIME | NUMBER | Cumulative total lead time | ||
CUM_MANUFACTURING_LEAD_TIME | NUMBER | Cumulative manufacturing lead time | ||
FIXED_LEAD_TIME | NUMBER | The fixed portion of lead time | ||
VARIABLE_LEAD_TIME | NUMBER | The variable portion of lead time | ||
UOM_CODE | VARCHAR2 | (3) | Yes | Unit of measure code |
BUILD_IN_WIP_FLAG | NUMBER | Yes | Flag to indicate if this item can be built in WIP | |
PURCHASING_ENABLED_FLAG | NUMBER | Yes | Purchasing enabled flag | |
PLANNING_MAKE_BUY_CODE | NUMBER | Yes | Plan this item as either a make item or a buy item | |
REPETITIVE_TYPE | NUMBER | Yes | Is this item built repetitively? | |
STANDARD_COST | NUMBER | Standard cost | ||
LOT_CONTROL_CODE | NUMBER | Yes | Lot control code | |
ROUNDING_CONTROL_TYPE | NUMBER | Yes | Order rounding control type code | |
CALCULATE_ATP | NUMBER | Yes | Calculate ATP when planning this part | |
END_ASSEMBLY_PEGGING | NUMBER | Yes | Peg to the end assembly on reports | |
NETTABLE_INVENTORY_QUANTITY | NUMBER | Yes | Nettable inventory quantity on hand | |
NONNETTABLE_INVENTORY_QUANTITY | NUMBER | Yes | Nonnettable inventory quantity on hand | |
ENGINEERING_ITEM_FLAG | NUMBER | Yes | Engineering item flag | |
WIP_SUPPLY_TYPE | NUMBER | WIP supply type | ||
OVERRUN_PERCENTAGE | NUMBER | Repetitive overrun percentage | ||
ACCEPTABLE_RATE_INCREASE | NUMBER | Acceptable rate increase | ||
ACCEPTABLE_RATE_DECREASE | NUMBER | Acceptable rate decrease | ||
SAFETY_STOCK_CODE | NUMBER | Yes | Safety stock code | |
SAFETY_STOCK_PERCENT | NUMBER | Percent for dynamically calculated safety stock | ||
SAFETY_STOCK_BUCKET_DAYS | NUMBER | Days over which to average demand for MRP Planned Safety Stock Percent | ||
SAFETY_STOCK_QUANTITY | NUMBER | Safety stock quantity | ||
PLAN_LAST_REVISION_DATE | DATE | Last plan revision date | ||
DESCRIPTION | VARCHAR2 | (240) | Inventory item identifier description | |
CATEGORY_ID | NUMBER | Category id for the planning category set | ||
BUYER_ID | NUMBER | (9) | Buyer identifier | |
BUYER_NAME | VARCHAR2 | (240) | Buyer Name | |
PLANNER_CODE | VARCHAR2 | (10) | Planner code | |
ABC_CLASS | NUMBER | Inventory item identifier ABC class | ||
REVISION | VARCHAR2 | (3) | Item revision | |
FIXED_DAYS_SUPPLY | NUMBER | Fixed days supply | ||
FIXED_ORDER_QUANTITY | NUMBER | Fixed order quantity | ||
FIXED_LOT_MULTIPLIER | NUMBER | Fixed lot multiplier | ||
MINIMUM_ORDER_QUANTITY | NUMBER | Minimum order quantity | ||
MAXIMUM_ORDER_QUANTITY | NUMBER | Maximum order quantity | ||
PLANNING_TIME_FENCE_DAYS | NUMBER | Planning time fence days | ||
PLANNING_TIME_FENCE_DATE | DATE | Planning time fence date | ||
DEMAND_TIME_FENCE_DAYS | NUMBER | Demand time fence days | ||
INVENTORY_USE_UP_DATE | DATE | The date that inventory will be exhausted based upon projected gross requirements | ||
ACCEPTABLE_EARLY_DELIVERY | NUMBER | Acceptable early days delivery | ||
PLANNER_BATCH_NUMBER | NUMBER | Batch identifier for use by the Planner | ||
PLANNER_STATUS_CODE | NUMBER | Status of the item for the Planner | ||
PLAN_START_DATE | DATE | Date planning of this item was started | ||
PLAN_COMPLETION_DATE | DATE | Date planning for this item was completed | ||
SHRINKAGE_RATE | NUMBER | Expected loss due to scrap | ||
PLANNING_EXCEPTION_SET | VARCHAR2 | (10) | Planning exception set to use to generate exception messages | |
EXCESS_QUANTITY | NUMBER | Excess quantity | ||
REPETITIVE_VARIANCE | NUMBER | Repetitive variance | ||
EXCEPTION_SHORTAGE_DAYS | NUMBER | Exception shortage days | ||
EXCEPTION_EXCESS_DAYS | NUMBER | Exception excess days | ||
EXCEPTION_REP_VARIANCE_DAYS | NUMBER | Exception repetitive variance days | ||
EXCEPTION_OVERPROMISED_DAYS | NUMBER | Exception overpromised days | ||
BASE_ITEM_ID | NUMBER | Base model for this configuration | ||
BOM_ITEM_TYPE | NUMBER | Bom item type | ||
ATO_FORECAST_CONTROL | NUMBER | Forecast control | ||
EXCEPTION_CODE | VARCHAR2 | (5) | Exception message code (internal use only) | |
PROGRAM_UPDATE_DATE | DATE | Concurrent Who column | ||
PRIMARY_VENDOR_ID | NUMBER | Primary supplier identifier | ||
REQUEST_ID | NUMBER | Concurrent Who column | ||
PROGRAM_APPLICATION_ID | NUMBER | Concurrent Who column | ||
PROGRAM_ID | NUMBER | Concurrent Who column | ||
DEMAND_TIME_FENCE_DATE | DATE | Demand time fence date | ||
FULL_PEGGING | NUMBER | Not currently used | ||
ORGANIZATION_CODE | VARCHAR2 | (3) | Organization code | |
EFFECTIVITY_CONTROL | NUMBER | Effectivity Control, Unit or date effective |
Cut, paste (and edit) the following text to query this object:
SELECT INVENTORY_ITEM_ID
, ORGANIZATION_ID
, COMPILE_DESIGNATOR
, LAST_UPDATE_DATE
, LAST_UPDATED_BY
, CREATION_DATE
, CREATED_BY
, IN_SOURCE_PLAN
, LAST_UPDATE_LOGIN
, INVENTORY_TYPE
, MRP_PLANNING_CODE
, INVENTORY_PLANNING_CODE
, LOW_LEVEL_CODE
, PREPROCESSING_LEAD_TIME
, POSTPROCESSING_LEAD_TIME
, FULL_LEAD_TIME
, CUMULATIVE_TOTAL_LEAD_TIME
, CUM_MANUFACTURING_LEAD_TIME
, FIXED_LEAD_TIME
, VARIABLE_LEAD_TIME
, UOM_CODE
, BUILD_IN_WIP_FLAG
, PURCHASING_ENABLED_FLAG
, PLANNING_MAKE_BUY_CODE
, REPETITIVE_TYPE
, STANDARD_COST
, LOT_CONTROL_CODE
, ROUNDING_CONTROL_TYPE
, CALCULATE_ATP
, END_ASSEMBLY_PEGGING
, NETTABLE_INVENTORY_QUANTITY
, NONNETTABLE_INVENTORY_QUANTITY
, ENGINEERING_ITEM_FLAG
, WIP_SUPPLY_TYPE
, OVERRUN_PERCENTAGE
, ACCEPTABLE_RATE_INCREASE
, ACCEPTABLE_RATE_DECREASE
, SAFETY_STOCK_CODE
, SAFETY_STOCK_PERCENT
, SAFETY_STOCK_BUCKET_DAYS
, SAFETY_STOCK_QUANTITY
, PLAN_LAST_REVISION_DATE
, DESCRIPTION
, CATEGORY_ID
, BUYER_ID
, BUYER_NAME
, PLANNER_CODE
, ABC_CLASS
, REVISION
, FIXED_DAYS_SUPPLY
, FIXED_ORDER_QUANTITY
, FIXED_LOT_MULTIPLIER
, MINIMUM_ORDER_QUANTITY
, MAXIMUM_ORDER_QUANTITY
, PLANNING_TIME_FENCE_DAYS
, PLANNING_TIME_FENCE_DATE
, DEMAND_TIME_FENCE_DAYS
, INVENTORY_USE_UP_DATE
, ACCEPTABLE_EARLY_DELIVERY
, PLANNER_BATCH_NUMBER
, PLANNER_STATUS_CODE
, PLAN_START_DATE
, PLAN_COMPLETION_DATE
, SHRINKAGE_RATE
, PLANNING_EXCEPTION_SET
, EXCESS_QUANTITY
, REPETITIVE_VARIANCE
, EXCEPTION_SHORTAGE_DAYS
, EXCEPTION_EXCESS_DAYS
, EXCEPTION_REP_VARIANCE_DAYS
, EXCEPTION_OVERPROMISED_DAYS
, BASE_ITEM_ID
, BOM_ITEM_TYPE
, ATO_FORECAST_CONTROL
, EXCEPTION_CODE
, PROGRAM_UPDATE_DATE
, PRIMARY_VENDOR_ID
, REQUEST_ID
, PROGRAM_APPLICATION_ID
, PROGRAM_ID
, DEMAND_TIME_FENCE_DATE
, FULL_PEGGING
, ORGANIZATION_CODE
, EFFECTIVITY_CONTROL
FROM MRP.MRP_SYSTEM_ITEMS;
MRP.MRP_SYSTEM_ITEMS does not reference any database object
MRP.MRP_SYSTEM_ITEMS is referenced by following:
|
|
|