Search Results purchase orders




The POS_MFG_CAPACITY_TEMP table in Oracle E-Business Suite (EBS) 12.1.1 or 12.2.2 is a temporary staging table primarily utilized within the Procurement and Sourcing (POS) module, specifically for manufacturing capacity planning and supplier scheduling processes. This table serves as an intermediary storage area for transient data before it is processed and transferred to permanent tables or used in analytical calculations. Below is a detailed breakdown of its purpose, structure, and functional relevance in Oracle EBS.

Purpose and Functional Context

The POS_MFG_CAPACITY_TEMP table is designed to support supplier capacity planning by temporarily storing manufacturing capacity data, such as available production hours, resource utilization, and supplier commitments. It acts as a buffer during data processing, enabling efficient batch operations and reducing direct transactional load on primary tables. This is particularly critical in scenarios involving bulk data imports, complex calculations, or integration with external systems like Advanced Planning and Scheduling (APS) tools.

Key Attributes and Structure

The table typically includes columns to capture the following data:
  • Transaction Identifiers: Temporary IDs or reference keys to link records to source systems or parent transactions.
  • Supplier and Item Details: Supplier codes, item numbers, and descriptions to associate capacity data with specific suppliers and products.
  • Capacity Metrics: Fields for available capacity, utilized capacity, and remaining capacity, often measured in hours, units, or percentages.
  • Time Periods: Date or period fields to define the validity range of the capacity data (e.g., daily, weekly, or monthly buckets).
  • Status Flags: Indicators to track processing states (e.g., "Pending," "Processed," or "Error").
  • Audit Columns: Creation and modification timestamps, along with user IDs for traceability.

Integration with Oracle EBS Modules

The table interacts with several EBS modules:
  1. Procurement (PO): Supports supplier scheduling by providing visibility into supplier capacity constraints during purchase order creation.
  2. Inventory (INV): Helps align material requirements with supplier production capabilities.
  3. Manufacturing (WIP): Facilitates capacity-driven production planning by integrating supplier constraints into Work in Process (WIP) schedules.
  4. Advanced Supply Chain Planning (ASCP): Serves as a data source for planning engines to optimize procurement and production workflows.

Data Lifecycle and Processing

Data flows into POS_MFG_CAPACITY_TEMP through:
  • Manual uploads via Oracle's Open Interface framework.
  • Automated feeds from external ERP or Manufacturing Execution Systems (MES).
  • Internal EBS processes generating interim capacity snapshots.
Once validated, data is either purged after processing or archived for compliance. Oracle Concurrent Programs or custom PL/SQL scripts typically handle the extraction, transformation, and loading (ETL) of this data into downstream tables like POS_SUPPLIER_CAPACITY or MRP_APS_PLANS.

Technical Considerations

Indexing: Temporary tables often lack extensive indexing to prioritize write speed over read performance. However, selective indexes on transaction IDs or status columns may improve batch processing efficiency.
Partitioning: In high-volume environments, partitioning by date or supplier can optimize data management.
Purge Policies: Automated jobs should regularly clean stale records to maintain performance.

Conclusion

The POS_MFG_CAPACITY_TEMP table is a critical component in Oracle EBS for managing supplier capacity data transiently. Its design balances flexibility and performance, enabling seamless integration with procurement and planning workflows while ensuring data integrity. Understanding its structure and lifecycle is essential for configuring robust supplier scheduling solutions in Oracle EBS 12.1.1 or 12.2.2.