Results for “wipbv_flow_schedules”

16 results




AI-generated from documented ETRM metadata — verify critical details on the linked pages.

Overview

WIPBV_FLOW_SCHEDULES is a read-only view owned by the APPS schema within the Work in Process (WIP) module of Oracle E-Business Suite. It exposes a joined, denormalized presentation of flow schedule manufacturing orders by combining entity-level identifiers from WIP_ENTITIES with the scheduling, quantity, and accounting attributes held on WIP_FLOW_SCHEDULES. The view is used primarily for reporting, inquiry screens, and integration programs that need a consolidated read of repetitive/flow manufacturing orders without navigating the normalization between the entity header and its schedule detail.

The view is defined with the WITH READ ONLY clause, and its predicate includes a security construct ('_SEC:FL.ORGANIZATION_ID') that enforces organization-level access control, consistent with Oracle's multi-org implementation. A lookup-translation directive is embedded for entity type and flow schedule status, so label columns derive meanings from MFG_LOOKUPS rather than storing raw codes.

Underlying Base Objects

The documented referenced base objects are two synonyms:

  • WIP_ENTITIES — the header table for discrete, repetitive, and flow manufacturing entities. It supplies WIP_ENTITY_ID and WIP_ENTITY_NAME (exposed as MFG_ORDER_NAME) and the entity type, which is validated against MFG_LOOKUPS.
  • WIP_FLOW_SCHEDULES — the flow schedule detail table, keyed to WIP_ENTITY_ID, holding planned/completed/scrap quantities, scheduling dates, BOM and routing revisions, demand class, kanban and line references, and the full set of WIP accounting class references.

The join is a simple equijoin on FL.WIP_ENTITY_ID = EN.WIP_ENTITY_ID. Because the view is read-only, no inserts, updates, or deletes are permitted through it; DML must target the base tables directly.

Key Columns

Common Use Cases and Queries

Typical uses include flow schedule status dashboards, MPS-to-WIP reconciliation, and open schedule aging reports scoped by organization.

  • Listing flow schedules and their MPS net quantities for an organization.
  • Comparing planned versus completed quantities to identify shortfalls.
  • Auditing open (unclosed) schedules and their scheduled completion dates.
SELECT mfg_order_name,
       mps_net_quantity,
       planned_quantity,
       completed_quantity,
       scheduled_start_date,
       scheduled_completion_date
FROM   apps.wipbv_flow_schedules
WHERE  organization_id = :org_id
AND    closed_date IS NULL
ORDER  BY scheduled_start_date;

Because the view enforces organization security, queries executed under a responsibility automatically return only the organizations for which that responsibility is authorized.