Results for “process_rev_item”

8 results




AI-generated from documented ETRM metadata — verify critical details on the linked pages.

Overview

ENG_ECO_PVT is the private implementation package for Oracle E-Business Suite Engineering Change Order (ECO) processing. It resides in the APPS schema and is classified as a PVT (private) API, meaning it is intended to be invoked internally by the public ENG_ECO_PUB package rather than called directly by external consumers. Its business purpose is to carry out the core logic behind engineering change order creation, revision, and release: locking an ECO, processing affected items and components, generating revised item revisions and bill/component revisions, and driving the workflow routing that accompanies the engineering change lifecycle.

The package body consolidates a wide set of engineering and bills-of-material utilities. It depends heavily on BOM utility and validation packages (such as BOM_BOM_COMPONENT_UTIL, BOM_OP_SEQ_UTIL, BOM_RTG_PUB, and the BOM_VALIDATE family), on engineering change infrastructure (ENG_ECO_UTIL, ENG_ECO_REVISION_UTIL, ENG_CHANGE_LINE_UTIL, ENG_DEFAULT_ECO, ENGECOBO), and on ECO_ERROR_HANDLER for error propagation. This dependency profile confirms that ENG_ECO_PVT acts as an orchestration layer coordinating item revisioning, BOM/routing changes, and ECO state management within a single internal processing framework.

Key Procedures and Functions

  • PROCESS_ECO — The principal driver routine that processes an engineering change order, coordinating revision item and component handling and invoking downstream workflow and validation logic.
  • LOCK_ECO — Acquires the ECO record in a locked state so that concurrent processing does not corrupt the change order, ensuring serialized updates to the change object.
  • PROCESS_REV_ITEM — Handles the revised item processing associated with an ECO, applying revised item defaults and revision control to affected items.
  • PROCESS_REV_COMP — Handles revised component processing, applying component-level changes to the affected bill of material through the BOM utility and validation packages.
  • EXPLODE_WF_ROUTING — Explodes and prepares the workflow routing records for the engineering change, working with the change route, route step, and route people tables.

Tables Accessed

The package reads and writes a focused set of engineering change tables through APPS synonyms. ENG_ENGINEERING_CHANGES stores the ECO header. ENG_CHANGE_LINES_S and ENG_CHANGE_OBJ_RELATIONSHIPS (together with ENG_CHANGE_OBJ_RELATIONSHIPS_S) hold the change lines and the object relationships that bind changed items and components to the ECO. ENG_CHANGE_ROUTES, ENG_CHANGE_ROUTES_S, ENG_CHANGE_ROUTE_STEPS, ENG_CHANGE_ROUTE_PEOPLE, ENG_CHANGE_ROUTE_PEOPLE_S, and ENG_CHANGE_ROUTE_PEOPLE_TL support workflow routing. ENG_CHANGE_TYPE_ORG_TASKS, ENG_LIFECYCLE_STATUSES, ENG_LIFECYCLE_STATUSES_S, ENG_STATUS_PROPERTIES, and EGO_OBJ_ROLE_MAPPINGS supply change type, lifecycle, status, and role-mapping configuration.

Usage Notes

Because ENG_ECO_PVT is a private package, it is normally invoked indirectly through ENG_ECO_PUB by the Oracle Engineering forms, ECO-related concurrent programs, and workflow activities. The user search term "eng_change_obj_relationships_s" reflects the sequence-backed intersection that this package maintains when associating changed objects with an ECO. Customizations should call the public API surface rather than ENG_ECO_PVT directly, since private signatures are not guaranteed across releases such as 12.1.1 and 12.2.2.